Required Departments: 6
|
|
|
Log Entries: 5
|
|
Electrical | Original | A | 11/6/2024 | RICHG | RICHG | | | Electrical | 2082389 | Construction | Original | D | 11/6/2024 | DOUGC | DOUGC | Snow loads at 43 and needs to be 57 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2082362 | Energy | Original | N | 11/6/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2082359 | Out to Review | Original | / | 11/6/2024 | NELIDA | NELIDA | Calvin walking | | Out to Review | 2082344 | Energy | Original | N | 11/6/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2082343 |
|
| |
|