| CO Springs DRE | Original | D | 3/6/2026 | SSADLER | SSADLER | Previous comments not addressed. The residential is a conditional use in the MX-M zone. You will need to apply for a conditional use permit through Land Use Review. This is not a wholly platted lot. You will need to apply for a waivier of replat through Land Use Review. | | CO Springs DRE | 2276804 |
| Energy | Original | D | 3/4/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2275648 |
| Mechanical | Original | D | 3/4/2026 | TCRIPPEN | TCRIPPEN | Disapproved:Mechanical scope is limited to adding bathroom fans. Bath fans to exhausting outside, And fireplaces . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2275647 |
| Plumbing | Original | A | 3/4/2026 | SHANEN | SHANEN | See sheet A1.4 for plumbing scope. | | Plumbing | 2275614 |
| Electrical | Original | D | 3/3/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2275498 |
| Zoning/Planning | Original | / | 3/3/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2275488 |
| Construction | Original | D | 3/3/2026 | JUSTINL | JUSTINL | See A0.0 and A1.8 for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2275486 |
| Energy | Original | / | 3/3/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2275485 |
| Submittal 2 | Original | / | 3/3/2026 | DANM | DANM | Submittal #2 | | Submittal 2 | 2275213 |
| CSU Contract Admin. | Original | N | 3/13/2025 | CSUAPPSPRM | CSUAPPSPRM | No applicable fees due this plan set. JMD | jdemello | CSU Contract Admin. | 2130695 |
| Electrical | Original | D | 3/12/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2130432 |
| Energy | Original | D | 3/12/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2130433 |
| CO Springs DRE | Original | D | 3/12/2025 | MAMBUUL | MAMBUUL | Single family residential is a conditional use in the MX-M zone district. A conditional use permit will need to be obtained through land use review. Lot is not fully platted and may need to obtain a waiver of replat if a deed dated prior to February 13th of 1951 can not be produced. | | CO Springs DRE | 2130203 |
| Plumbing | Original | D | 3/12/2025 | SHANEN | SHANEN | Construction review comments must be addressed. Provide plumbing plans that comply with PPRBD requirements for residential plumbing plans. See link: https://www.pprbd.org/File/ByAlias/ResPlumbing Remaining commercial occupancy, if any, will require compliance with section 403.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2129826 |
| Zoning/Planning | Original | / | 3/11/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2129782 |
| Mechanical | Original | D | 3/11/2025 | TCRIPPEN | TCRIPPEN | DISAPPROVED: IMC 2021 SECTION 929 UNVENTED ALCOHOL FUEL-BURNING DECORATIVE APPLIANCES,SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL1370 - MANUFACTURER`S INSTALLATION AND CHAPTER 3 IMC.... HOW ARE THE UNITS BEING HEAT NOW? * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2129710 |
| Construction | Original | D | 3/11/2025 | JUSTINL | JUSTINL | Preliminary review only. Plans are incomplete. This does not appear to be entire structure based on plan R9509. Need additional clarification: - Is half of the building still staying commercial and this section being converted to residential? - Would this be a live-work occupancy? This would require sprinkler systems installed throughout building per chapter 9 of the IBC. - Is the structure being divided into 2 separate buildings? This would require a separate address. - Need to provide full set of plans for a change of use or change of occupancy to include site plan, MEP and construction plans, IECC compliance documents as well as a full floor plan of the structure. See our website for plan requirements based on project type. May need to schedule a walk through appointment for additional questions regarding plan submittal type. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2129660 |
| Electronic Plan | Original | / | 3/11/2025 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2129392 |
| Energy | Original | / | 3/3/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2126299 |
| Floodplain | Original | N | 3/3/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7411225031) | | Floodplain | 2126298 |