Plumbing | Original | A | 6/26/2025 | SHANEN | SHANEN | | | Plumbing | 2176934 |
WP Zoning | Original | D | 6/25/2025 | DBURGESS | DBURGESS | WP ZDP issuance is pending an approved Subcontractor / Vendor List. Disapproved at this time to release the plan set to address PPRBD's comments. | | WP Zoning | 2176783 |
Construction | Original | D | 6/25/2025 | SHELLEY | SHELLEY | Either provide all truss layouts on stamped framing plans for all levels, or provide manufacturer layouts for truss locations that is shop stamped by EOR indicating they have been reviewed and accepted without revision. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2176706 |
Submittal 2 | Original | / | 6/25/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2176611 |
WP Zoning | Original | D | 6/23/2025 | DBURGESS | DBURGESS | WP ZDP issuance is pending an approved Subcontractor / Vendor List. Disapproved at this time to release the plan set to address PPRBD's comments. | | WP Zoning | 2175401 |
Mechanical | Original | A | 6/17/2025 | TREVORH | TREVORH | Approved; | | Mechanical | 2173057 |
Energy | Original | D | 6/16/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2172035 |
Electrical | Original | D | 6/16/2025 | RICHG | RICHG | Show compliance with R404.3 IECC 2021
. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2172034 |
Electronic Plan | Original | / | 6/16/2025 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 2172031 |
Plumbing | Original | D | 6/16/2025 | SHANEN | SHANEN | See highlighted sections on clouded requirements for residential plumbing plans block. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2171899 |
Construction | Original | D | 6/16/2025 | SHELLEY | SHELLEY | Incomplete plan components, see plan. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2171890 |
Electronic Plan | Original | / | 6/13/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2171573 |
WP Fire (CSFD Commercial) | Original | A | 6/12/2025 | DBURGESS | DBURGESS | Per Fire Chief Tyler Lambert via email to D. Burgess on 6/09/2025: "Driveway is approved as drawn on site plan at 9.3% slope" | | WP Fire (CSFD Commercial) | 2171006 |
WP Floodplain | Original | N | 6/12/2025 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2171005 |
WP Enumeration | Original | A | 6/12/2025 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's data | | WP Enumeration | 2171004 |
Energy | Original | / | 6/12/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2170705 |