Energy | Original | D | 8/26/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2203350 |
Mechanical | Original | D | 8/26/2025 | TREVORH | TREVORH | Disapproved. Missing several sheets in the heat calculation submittal to include equipment data sheets , see link for more assistance.www.pprbd.org/File/ByAlias/ResPRguide * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2203349 |
| Original | / | 8/21/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2200748 |
| Original | / | 8/21/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2200742 |
Submittal 4 | Original | / | 8/21/2025 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2200741 |
Energy | Original | D | 8/20/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2200269 |
Mechanical | Original | D | 8/20/2025 | TREVORH | TREVORH | Disapproved; previous submittal have not been corrected, Need to show this plan as a crawlspace.crawlspace is missing it's return air.still missing the dampered outside air size and location as shown on the heat calculations .this submittal package is still missing several documents.perhaps a phone call to plan review or schedule an appointment for consultation would be helpful. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2200268 |
Construction | Original | A | 8/20/2025 | SHELLEY | SHELLEY | | | Construction | 2200095 |
| Original | / | 8/20/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2199853 |
| Original | / | 8/20/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2199701 |
Submittal 3 | Original | / | 8/20/2025 | QUINTONW | QUINTONW | Submittal #3 | | Submittal 3 | 2199700 |
Energy | Original | D | 8/14/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2197311 |
Mechanical | Original | D | 8/14/2025 | TREVORH | TREVORH | Disapproved; Need to show on plans the dampered outside air intake location and duct size, 60 CFM is shown on the heat calculations , identify crawlspace on heat calcs. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2197310 |
Construction | Original | D | 8/13/2025 | SHELLEY | SHELLEY | IECC form still doesn't match report * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2197162 |
Submittal 2 | Original | / | 8/13/2025 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2197135 |
Energy | Original | D | 8/5/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2193720 |
Electrical | Original | A | 8/5/2025 | DANIELG | DANIELG | | | Electrical | 2193719 |
Electronic Plan | Original | / | 8/5/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2193715 |
Mechanical | Original | D | 7/29/2025 | TREVORH | TREVORH | Disapproved; Need to see the completed IECC form, change basement plan to crawlspace and show ventilation. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2190588 |
County Zoning | Original | A | 7/29/2025 | DSDYOUNGER | DSDYOUNGER | Review Complete. See comments below for: Single Family Dwelling, Driveway, BESQCP (see full review) | | County Zoning | 2190418 |
County Zoning | Original | / | 7/29/2025 | EPCZONING | EPCZONING | Driveway Approved (see full review) | | County Zoning | 2190417 |
Plumbing | Original | A | 7/28/2025 | SHANEN | SHANEN | | | Plumbing | 2190023 |
County Zoning | Original | / | 7/28/2025 | DSDYOUNGER | DSDYOUNGER | Single Family Dwelling Approved (see full review) | | County Zoning | 2190002 |
County Zoning | Original | / | 7/28/2025 | DSDYOUNGER | DSDYOUNGER | BESQCP Approved (see full review) | | County Zoning | 2190000 |
Zoning/Planning | Original | / | 7/28/2025 | DSDYOUNGER | DSDYOUNGER | In Current Review by DSDYOUNGER | | Zoning/Planning | 2189958 |
Construction | Original | D | 7/28/2025 | SHELLEY | SHELLEY | See IECC and roof framing * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2189920 |
Electronic Plan | Original | / | 7/28/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2189732 |
Enumeration | Original | A | 7/23/2025 | AMY | AMY | | | Enumeration | 2188194 |
Electronic Plan | Original | / | 7/23/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2188190 |
Energy | Original | / | 7/23/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2188170 |
Floodplain | Original | N | 7/23/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 4220407029) | | Floodplain | 2188169 |