| Energy | Original | A | 11/25/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2241288 |
| Electrical | Original | A | 11/25/2025 | CONNERM | CONNERM | | | Electrical | 2241287 |
| Electronic Plan | Original | / | 11/25/2025 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2241283 |
| | Original | / | 11/25/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2241238 |
| | Original | / | 11/25/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2241223 |
| Submittal 3 | Original | / | 11/25/2025 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2241222 |
| Energy | Original | D | 11/20/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2239596 |
| Electrical | Original | D | 11/20/2025 | CONNERM | CONNERM | Comply with NEC 230.85 * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2239595 |
| Electronic Plan | Original | / | 11/20/2025 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2239593 |
| Construction | Original | A | 11/20/2025 | DOUGC | DOUGC | | | Construction | 2239531 |
| Submittal 2 | Original | / | 11/20/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2239449 |
| Energy | Original | D | 11/18/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2237842 |
| Plumbing | Original | A | 11/18/2025 | SHANEN | SHANEN | | | Plumbing | 2237841 |
| Mechanical | Original | A | 11/17/2025 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2237674 |
| Electrical | Original | D | 11/17/2025 | CONNERM | CONNERM | Show location of electrical emergency disconnect and electrical panel location * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2237483 |
| Electronic Plan | Original | / | 11/17/2025 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2237478 |
| Construction | Original | D | 11/17/2025 | DOUGC | DOUGC | Trusses * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2237424 |
| Energy | Original | / | 11/17/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2237423 |
| Electronic Plan | Original | / | 11/17/2025 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2237413 |
| WP Fire (CSFD Commercial) | Original | A | 11/12/2025 | DBURGESS | DBURGESS | Per Fire Chief Tyler Lambert via email received by D. Burgess on 11/04/2025: "The driveway is approved at 10.7% slope and 12’ wide with a minimum of 2’ of gravel or small stone oneach side of the concrete for a total of 16’ clear width. If the driveway is longer than 150’, a turnaroundwill be needed at the house. We will need to do a final inspection." | | WP Fire (CSFD Commercial) | 2235799 |
| WP Zoning | Original | A | 11/12/2025 | DBURGESS | DBURGESS | ZDP approved on 11/04/2025 & Development Fees paid on 11/04/2025. Onsite Pre-construction meeting held on 11/07/2025 - Conditions of Approval signed. | | WP Zoning | 2235797 |
| WP Floodplain | Original | N | 11/12/2025 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2235790 |
| WP Enumeration | Original | A | 11/12/2025 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's published online data | | WP Enumeration | 2235788 |
| | Original | / | 11/10/2025 | SYSTEM | SYSTEM | Plan Review fees paid 11/10/2025 for plan submitted 11/10/2025. Submit Date updated to now. Plan now open for review. | | | 2235082 |
| Mechanical | Original | / | 11/10/2025 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by MCNAB MARK | MBI Contractors Inc. | Mechanical | 2235074 |
| Electrical | Original | / | 11/10/2025 | WEBSITE | WEBSITE | Overtime Authorized for Electrical by MCNAB MARK | MBI Contractors Inc. | Electrical | 2235073 |
| Construction | Original | / | 11/10/2025 | WEBSITE | WEBSITE | Overtime Authorized for Construction by MCNAB MARK | MBI Contractors Inc. | Construction | 2235072 |
| Energy | Original | / | 11/10/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2235053 |