| Energy | Original | A | 3/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2286118 |
| Mechanical | Original | N | 3/30/2026 | TCRIPPEN | TCRIPPEN | No mechanical | | Mechanical | 2286117 |
| Plumbing | Original | A | 3/30/2026 | TCRIPPEN | TCRIPPEN | Approved | | Plumbing | 2286116 |
| Construction | Original | A | 3/30/2026 | SHELLEY | SHELLEY | | | Construction | 2286105 |
| Energy | Original | / | 3/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2286104 |
| WP Zoning | Original | A | 3/30/2026 | DBURGESS | DBURGESS | ZDP conditionally approved on 2/20/2026. Pre-construction meeting required. Please contact the Planning Department at (719) 687-5202 to schedule. | | WP Zoning | 2286076 |
| WP Enumeration | Original | A | 3/30/2026 | DBURGESS | DBURGESS | See 3/16/2026 notation | | WP Enumeration | 2286073 |
| Submittal 2 | Original | / | 3/26/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2284756 |
| Energy | Original | D | 3/18/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2281717 |
| Mechanical | Original | D | 3/18/2026 | TCRIPPEN | TCRIPPEN | Disapproved * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2281716 |
| Plumbing | Original | D | 3/18/2026 | SHANEN | SHANEN | Provide plumbing plans that comply with PPRBD requirements for residential plumbing plans. See link: https://www.pprbd.org/File/ByAlias/ResPlumbing Remove all references to the mechanical and electrical scope from the plumbing plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2281440 |
| Electrical | Original | A | 3/17/2026 | CONNERM | CONNERM | | | Electrical | 2281081 |
| Electronic Plan | Original | / | 3/17/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2281074 |
| Construction | Original | D | 3/17/2026 | SHELLEY | SHELLEY | Site plan document need to show the addition, need clarifications on crawlspace access location and framing. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2281067 |
| Electronic Plan | Original | / | 3/17/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2281048 |
| WP Zoning | Original | A | 3/16/2026 | DBURGESS | DBURGESS | ZDP conditionally approved on 2/20/2026. Pre-construction meeting required. Please contact Sam Kozurek at (719) 318-5089 to schedule. | | WP Zoning | 2280396 |
| WP Floodplain | Original | N | 3/16/2026 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2280391 |
| WP Enumeration | Original | A | 3/16/2026 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's published online data. | | WP Enumeration | 2280390 |
| | Original | / | 3/11/2026 | SYSTEM | SYSTEM | Plan Review fees paid 03/11/2026 for plan submitted 02/26/2026. Submit Date updated to now. Plan now open for review. | | | 2278489 |
| Energy | Original | / | 2/26/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2273823 |