| CO Springs Fire | Original | A | 8/7/2026 | CSFIRE | CSFIRE | CSFD FCS: You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! Fee entered is per townhome unit | chiptaylor | CO Springs Fire | 2344635 |
| Energy | Original | D | 7/27/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2339442 |
| Mechanical | Original | A | 7/27/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2339441 |
| Plumbing | Original | A | 7/24/2026 | SHANEN | SHANEN | | | Plumbing | 2338702 |
| City Engr | Original | D | 7/24/2026 | HVO | HVO | Traffic signal funds to be paid for the future signal at Shiloh Mesa Dr & Marksheffel Rd ($75k) Financial assurances for public street and drainage improvements (these items were not completed and/or repaired by the original owner) Subdivision Inspection fees in the amount of $3,830.28 (59 lots at $64.92) to be paid to Engineering Inspections office here at RBD | | City Engr | 2338652 |
| CO Springs DRE | Original | D | 7/23/2026 | SSADLER | SSADLER | Upload the approval letter. Upload the final approved landscaping and irrigation plans. Upload the final recorded plat. Fees and assurances may due prior to building permit issuance. | | CO Springs DRE | 2338343 |
| Electrical | Original | A | 7/21/2026 | CONNERM | CONNERM | | | Electrical | 2337263 |
| CSU Contract Admin. | Original | N | 7/21/2026 | CSUAPPSPRM | CSUAPPSPRM | Applicable Development Utility charges and fees due prior to building permit. - AMS | ASweet | CSU Contract Admin. | 2337223 |
| CSU Water | Original | A | 7/21/2026 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. MLW | mlwilliams | CSU Water | 2337030 |
| CSU Waste Water | Original | A | 7/21/2026 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. MLW | mlwilliams | CSU Waste Water | 2337029 |
| Gas/Elec. Utils | Original | A | 7/21/2026 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. MLW | mlwilliams | Gas/Elec. Utils | 2337028 |
| Stormwater | Original | D | 7/21/2026 | JDUNCAN | JDUNCAN | Upload approved SWENT GEC Plan and provide Accela GEC Permit number. | | Stormwater | 2336984 |
| Zoning/Planning | Original | / | 7/21/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2336937 |
| Construction | Original | D | 7/21/2026 | SHELLEY | SHELLEY | See floor plans, section, IECC, framing * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2336925 |
| Electronic Plan | Original | / | 7/20/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2336333 |
| Enumeration | Original | A | 6/30/2026 | BECKYA | BECKYA | | | Enumeration | 2329192 |
| Electronic Plan | Original | / | 6/30/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2329152 |
| | Original | / | 6/30/2026 | SYSTEM | SYSTEM | Plan Review fees paid 06/30/2026 for plan submitted 06/30/2026. Submit Date updated to now. Plan now open for review. | | | 2329144 |
| Energy | Original | / | 6/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2329104 |
| Floodplain | Original | N | 6/30/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5304308023) | | Floodplain | 2329103 |