| Energy | Original | / | 7/28/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2339715 |
| Energy | Original | D | 7/27/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2339578 |
| Mechanical | Original | A | 7/27/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2339577 |
| County Zoning | Original | D | 7/27/2026 | DSDYOUNGER | DSDYOUNGER | 1.) The Stormwater Permit Form must be approved, stamped, and include the assigned file number. For assistance, please contact the Stormwater Department at Stormwater@elpasoco.com.
2.) The Site Plan must include the lot impervious percentage. Please refer to the disapproved Site Plan for the applicable plat note snippet. | | County Zoning | 2339555 |
| Electronic Plan | Original | / | 7/27/2026 | DALEH | DALEH | In Current Review by DALEH | | Electronic Plan | 2339510 |
| Plumbing | Original | A | 7/27/2026 | SHANEN | SHANEN | | | Plumbing | 2339507 |
| Electrical | Original | D | 7/27/2026 | CONNERM | CONNERM | Specify and show location of pathway for future routing of conduit from roof to electric panel.
Verify locations of conduit and termination points serving the EV ready space.
Provide a plan note stating a minimum 2-pole, 40 amp GFCI breaker, conduit, conductor, and receptacle is provided for an EV Charger
Provide a plan note stating there will be a 2-pole breaker space for each proposed combustion appliance
Show a 2-pole breaker space at the opposite end of the buss for Solar Ready.
Provide a plan note requiring compliance with 2021 ECC R402.4.6 limiting air leakage through electrical and communication outlet boxes installed in the building thermal envelope * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2339497 |
| Electronic Plan | Original | / | 7/27/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2339491 |
| Construction | Original | A | 7/27/2026 | BRIANB | BRIANB | | | Construction | 2339488 |
| Electronic Plan | Original | / | 7/27/2026 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2339165 |
| Enumeration | Original | A | 7/9/2026 | BRENT | BRENT | | | Enumeration | 2332686 |
| | Original | / | 7/9/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/09/2026 for plan submitted 07/09/2026. Submit Date updated to now. Plan now open for review. | | | 2332630 |
| Enumeration | Original | / | 7/9/2026 | WEBSITE | WEBSITE | Overtime Authorized for Enumeration by Steve Hood | laschood | Enumeration | 2332627 |
| Construction | Original | / | 7/9/2026 | WEBSITE | WEBSITE | Overtime Authorized for Construction by Steve Hood | laschood | Construction | 2332626 |
| Plumbing | Original | / | 7/9/2026 | WEBSITE | WEBSITE | Overtime Authorized for Plumbing by Steve Hood | laschood | Plumbing | 2332625 |
| Mechanical | Original | / | 7/9/2026 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by Steve Hood | laschood | Mechanical | 2332623 |
| Electrical | Original | / | 7/9/2026 | WEBSITE | WEBSITE | Overtime Authorized for Electrical by Steve Hood | laschood | Electrical | 2332621 |
| Stormwater | Original | / | 7/9/2026 | SYSTEM | SYSTEM | You will need to contact Stormwater department for approval prior to permit. This department will not review the plan electronically. | | Stormwater | 2332568 |
| Energy | Original | / | 7/9/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2332567 |
| Floodplain | Original | N | 7/9/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6136004065) | | Floodplain | 2332566 |