PROCESSING....
This is hidden content to make Wave think this is not a heading
Skip to main content
Pikes Peak Regional Building Department
Ensuring life safety and welfare of our community through efficient and consistent application of adopted codes and standards.
Home
Contact
Search
Accessibility
Cart
Sign In
Home
Contact
Search
Accessibility
Cart
Sign In
Plan Details
Clear
Permits
By Address
By Permit Number
Fee Calculator
Plans
By Address
List of Plans
Home
Plan #
  
Type
 
Plan
Owner
Address
407 WOODLAND DR, WOODLAND PARK, CO 80863
Parcel Info
6029.134130010
Truss P/SF
40 (Elevation: 8,520 Feet)
Project
NEW DECKS WITH COVER (
434
)
Type Of Plan
Normal
Review Type
Single Copy
Fire District
NETC FIRE DIST
Submit Date
Approval Date
Location
Resubmittal
Plan Image
View Plan Image
Download Plan Image
Map
Google Map
Yahoo Maps
Bing Maps
MapQuest
GIS Map
County Map & Data
PPRBD Directions
Required Departments: 4
By checking this box, you agree to the following:
Overtime reviews are billed at $100/hour of review time.
Requesting overtime is optional. If I don’t request it, my plan will still be reviewed in the order submitted.
Overtime reviews are dependent on staff availability, so there is no guarantee that the review will be expedited. You will only be charged overtime fees if we are able to perform those reviews. If no one is available to take that review on an overtime basis, your plan may end up being reviewed in the regular sequence.
Required Departments and Log Entries
Department
Status
Approve Overtime
Overtime
Overtime_2
BoundColumn_2
Department
Construction
D
0
C
Construction
Energy
N
G
Energy
WP Floodplain
N
0
W
WP Floodplain
WP Zoning
A
0
Z
WP Zoning
Log Entries: 16
Log Details
View Log
Log
Time Summary
Department
Splice
Status
Date
Reviewer
Reviewer
Comment
username
Department
tid
Woodland Park
Original
/
9/24/2026
DBURGESS
Location = Woodland Park by DBURGESS
Woodland Park
2363132
WP Zoning
Original
A
9/24/2026
DBURGESS
DBURGESS
ZDP approved on 9/21/2026 by D. Burgess; No City of WP inspections required. Please complete all requisite PPRBD inspections.
WP Zoning
2363125
Woodland Park Bin
Original
/
9/8/2026
SCANNING
SCANNING
placed on Shaun Todd's desk
Woodland Park Bin
2357265
Zoning/Planning
Original
/
9/8/2026
SCANNING
Location = Zoning/Planning by SCANNING
Zoning/Planning
2357126
Plan Coordinator (Main)
Original
/
9/4/2026
DANM
Location = Plan Coordinator (Main) by DANM
Plan Coordinator (Main)
2356869
Construction
Original
D
9/4/2026
DANM
DANM
Clarify framing for gable at cover - is there a ridge board with collar ties?
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Construction
2356868
Construction (Main)
Original
/
9/4/2026
DANM
Location = Construction (Main) by DANM
Construction (Main)
2356861
Submittal 2
Original
/
9/4/2026
DANM
DANM
Submittal #2
Submittal 2
2356860
WP Floodplain
Original
N
8/25/2026
DBURGESS
DBURGESS
Verified not in a floodplain
WP Floodplain
2351665
Woodland Park
Original
/
8/25/2026
DBURGESS
Location = Woodland Park by DBURGESS
Woodland Park
2351664
WP Zoning
Original
D
8/25/2026
DBURGESS
DBURGESS
The new decks are a change to the zoning footprint, which requires a Zoning Development Permit (ZDP) to properly verify and document conformance with the city’s Unified Development Code (UDC). Use the City Multi-Use Zoning Development Permit which can be downloaded from the City's website at:
https://woodlandpark.gov/235/Forms-Documents
Please note the Site Plan requirements as outlined within the ZDP application and as shown on the Site Plan example in the application.
Please contact the Woodland Park Planning Department at (719) 687-5202 with questions.
WP Zoning
2351663
Finished Bin (Main)
Original
/
8/10/2026
SCANNING
Location = Finished Bin (Main) by SCANNING
Finished Bin (Main)
2345143
Construction
Original
D
8/9/2026
DANM
DANM
Missing dimensions on front deck and cover - cannot complete structural analysis
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Construction
2345123
Plan Coordinator (Main)
Original
/
8/9/2026
DANM
Location = Plan Coordinator (Main) by DANM
Plan Coordinator (Main)
2345122
Out to Review
Original
/
7/28/2026
TREYW
TREYW
Zachary Walking 7196619366
Out to Review
2339900
Energy
Original
N
7/28/2026
SYSTEM
SYSTEM
Energy Department review not required under 2023 PPRBC when IECC is N/A
Energy
2339896