| Monument Fire | Original | A | 9/25/2026 | MONUMENTFIRE | MONUMENTFIRE | New construction is subject to impact fees. WRC permits are required for this permit.
Please apply at www.monumentfire.org/permits
This review is based on the 2021 International Fire Code (IFC), as adopted and amended by Monument Fire District, including all applicable policies and standards. This review is limited to fire and life safety considerations and does not constitute approval of structural, electrical, plumbing, or other disciplines. | MonumentFire | Monument Fire | 2363683 |
| County Zoning | Original | D | 9/22/2026 | DSDYOUNGER | DSDYOUNGER | 1.) As of May 4, 2026, all applicants are required to submit a Stormwater Permit Request Form to initiate an application for new single-family residential construction. The form is available on the EPC website at: www.epc-stormwaterpermit.com/ Please note that an approved Stormwater Permit must be obtained prior to the issuance of a Building Permit through Pikes Peak Regional Building Department (PPRBD). At this time, your plan cannot be reviewed. Once the Stormwater Permit Request Form has been submitted and the appropriate permit has been obtained, YOU MUST UPLOAD your approved, stamped Stormwater Permit Form with the resubmittal for review. For any questions contact the Stormwater department at StormWater@elpasoco.com.
2.) Architectural plans must include proposed breeze way indicated on site plan. If a breeze way is no longer intended the site plan must be revised to exclude it. If the residence and existing ice rink are intended to be two separate structures, you MUST contact Planner of the Day at 719-520-6944 for an Accessory Structure exceeding two times the footprint of the primary structure.
3.) Existing 21,000 SF ice rink being used commercially reference code violation CE26842, MUST contact Planner of the Day at 719-520-6944. | | County Zoning | 2361952 |
| Energy | Original | D | 9/21/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2361537 |
| Mechanical | Original | D | 9/21/2026 | TCRIPPEN | TCRIPPEN | Disapproved * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2361536 |
| Plumbing | Original | A | 9/18/2026 | SHANEN | SHANEN | | | Plumbing | 2361252 |
| Electrical | Original | D | 9/18/2026 | CONNERM | CONNERM | Specify and show potential PV pathway from attic to electric panel. If vertical pathway then specify so
Show locations of conduit and termination points serving the EV ready space.
Show an EV ready space noted in the garage
Provide a plan note stating a minimum 2-pole, 40 amp GFCI breaker, conduit, conductor, and receptacle is provided for an EV Charger
Provide a plan note stating there will be a 2-pole breaker space for each proposed combustion appliance
Provide plan note stating there will be a 2-pole breaker space at the opposite end of the buss for Solar Ready.
Provide a plan note stating compliance with 2021 IECC R402.4.6 limiting air leakage through electrical and communication outlet boxes installed in the building thermal envelope
Remove. No longer apply. Fully comply with IECC code sections * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2361230 |
| Electronic Plan | Original | / | 9/18/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2361227 |
| Elevators | Original | D | 9/18/2026 | ROBERTV | ROBERTV | Planset departments are conflicting as to "is there going to be closet or an elevator ?" where it is shown on the plans.
If there is not going to be an elevator as part of this home build, it must be noted "future elevator or closet" on all drawing sheets, and remove the elevator specifications from this planset
If the elevator is going to be installed as part of this home build, site specific elevator shop drawings need to be provided and all notations in the planset need to reflect "elevator'. Also need to know where the elevator controller is located. . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Elevators | 2361214 |
| Zoning/Planning | Original | / | 9/18/2026 | DSDYOUNGER | DSDYOUNGER | In Current Review by DSDYOUNGER | | Zoning/Planning | 2360992 |
| Construction | Original | A | 9/18/2026 | BPHILLIPS | BPHILLIPS | | | Construction | 2360987 |
| Electronic Plan | Original | / | 9/17/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2360809 |
| Enumeration | Original | A | 9/15/2026 | AMY | AMY | | | Enumeration | 2359308 |
| Electronic Plan | Original | / | 9/15/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2359296 |
| | Original | / | 9/14/2026 | SYSTEM | SYSTEM | Plan Review fees paid 09/14/2026 for plan submitted 09/14/2026. Submit Date updated to now. Plan now open for review. | | | 2359270 |
| Energy | Original | / | 9/14/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2359264 |
| Floodplain | Original | N | 9/14/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6120001053) | | Floodplain | 2359263 |