| Energy | Original | D | 9/28/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2364218 |
| Mechanical | Original | D | 9/28/2026 | QUINTONW | QUINTONW | Disapproved: See equipment cert, duct design and heat calcs for full list of disapproval comments. AM&M must be submitted for use of 2024 IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2364217 |
| Electrical | Original | D | 9/28/2026 | CONNERM | CONNERM | AMM required for 2024 IECC use.
Specify and show potential PV pathway from attic to electric panel. If vertical pathway then specify so
Show locations of conduit and termination points serving the EV ready space.
Show an EV ready space noted in the garage
Provide a plan note stating a minimum 2-pole, 40 amp GFCI breaker, conduit, conductor, and receptacle is provided for an EV Charger
Provide a plan note stating there will be a 2-pole breaker space for each proposed combustion appliance
Provide plan note stating there will be a 2-pole breaker space at the opposite end of the buss for Solar Ready.
Provide a plan note stating compliance with 2021 IECC R402.4.6 limiting air leakage through electrical and communication outlet boxes installed in the building thermal envelope
See plan for full disaproval comments * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2364167 |
| Electronic Plan | Original | / | 9/28/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2364162 |
| Plumbing | Original | A | 9/28/2026 | SHANEN | SHANEN | | | Plumbing | 2364150 |
| Construction | Original | D | 9/28/2026 | BPHILLIPS | BPHILLIPS | An approved AM&M request form is required in order to use the 2024 code. Current adopted code is 2021 IECC and CO MERSRC.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2364128 |
| Electronic Plan | Original | / | 9/28/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2364109 |
| WP Zoning | Original | D | 9/28/2026 | DBURGESS | DBURGESS | Disapproved for WP Zoning. A courtesy review was performed and comments sent to contractor on 9/21/2026: - Driveway does not conform to NETCO standards - Erosion control issues along both sides of driveway - Structure exceeds the 30' max. allowable average height - Land disturbing activity exceeds 7500 sq. ft. - separate Grading Permit required A re-submittal of the Site Plan and architectural plans (elevations) will be required. PPRBD plans must match approved ZDP plans (once such approval is obtained.) | | WP Zoning | 2364086 |
| WP Floodplain | Original | N | 9/28/2026 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2364084 |
| WP Enumeration | Original | A | 9/28/2026 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's published online data. | | WP Enumeration | 2364082 |
| | Original | / | 9/16/2026 | SYSTEM | SYSTEM | Plan Review fees paid 09/16/2026 for plan submitted 09/16/2026. Submit Date updated to now. Plan now open for review. | | | 2360199 |
| Energy | Original | / | 9/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2360169 |