| CO Springs DRE | Original | D | 9/29/2026 | SSADLER | SSADLER | On the site plan, show the dimensions of all structures on the property and the height of the proposed addition measured from average finished grade to the highest point of the roof | | CO Springs DRE | 2364730 |
| City Engr | Original | D | 9/25/2026 | JDAGNILLO | JDAGNILLO | Engineering Development Review has determined a geologic hazard report required for this lot due to its location. This report must be completed by a geotechnical engineer and submitted directly to EDR through our electronic review system called ProjectDox. Below is a link to ProjectDox and a user manual.
https://coloradosprings.gov/stormwater/planreview
EDR's review fee will be collected by ProjectDox and if the report requires a third party review such as Colorado Geological Survey (CGS), their review fees are invoiced and paid directly to the third party review agency.
Revised application forms are available on Public Works web-page. Public Works/City Engineering Hub/New Development/Standards and References/ "References and Research Tools" https://coloradosprings.gov/public-works/page/engineering-standards-and-references
Once report has been approved by the City, please upload a copy into this building permit plan set for City Engineering signoff on the builidng permit | | City Engr | 2363744 |
| Energy | Original | D | 9/25/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2363623 |
| Mechanical | Original | D | 9/25/2026 | QUINTONW | QUINTONW | Disapproved: See heat calcs and equipment cert for full list of disapproval comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2363622 |
| Plumbing | Original | A | 9/25/2026 | SHANEN | SHANEN | | | Plumbing | 2363552 |
| Electrical | Original | D | 9/25/2026 | CONNERM | CONNERM | Show locations of conduit and termination points serving the EV ready space.
Show an EV ready space noted in the garage
Provide a plan note stating a minimum 2-pole, 40 amp GFCI breaker, conduit, conductor, and receptacle is provided for an EV Charger
Provide a plan note stating there will be a 2-pole breaker space for each proposed combustion appliance
Provide a plan note stating compliance with 2021 IECC R402.4.6 limiting air leakage through electrical and communication outlet boxes installed in the building thermal envelope
Remove amendments. No longer apply. Must fully comply with R404.2 and R404.1 * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2363551 |
| Zoning/Planning | Original | / | 9/25/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2363540 |
| Electronic Plan | Original | / | 9/25/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2363522 |
| Construction | Original | D | 9/25/2026 | BPHILLIPS | BPHILLIPS | IECC, window function, detached structure, * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2363520 |
| Electronic Plan | Original | / | 9/24/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2363192 |
| Floodplain | Original | D | 9/21/2026 | KEITH | KEITH | Under FEMA's National Flood Insurance Program (NFIP) rules, if a home remodel, addition, or repair costs 50% or more of the building's current market value, the whole house has to be updated to meet current flood codes. To show that our project stays safely under that 50% limit, we will need a certified property appraisal for just the building itself, leaving out the value of the land. This appraisal needs to show that the structure is worth more than double our revised project cost estimate. When we pull that estimate together, we just need to make sure it carefully follows the itemized list in the FEMA P-758 Desk Reference, making sure we count all the required material and labor costs while leaving out the allowed exclusions like design fees and landscaping. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Floodplain | 2361451 |
| | Original | / | 9/18/2026 | SYSTEM | SYSTEM | Plan Review fees paid 09/18/2026 for plan submitted 09/18/2026. Submit Date updated to now. Plan now open for review. | | | 2360939 |
| Energy | Original | / | 9/18/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2360915 |
| Fire | Original | / | 9/18/2026 | RBD GIS | RBD GIS | Parcel 7425424028 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 2360913 |
| Floodplain | Original | / | 9/18/2026 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 7425424028) | | Floodplain | 2360914 |