Construction | Splice 8/15/17 | A | 8/15/2017 | BPHILLIPS | BPHILLIPS | Changed patio to deck. | | Construction | 986869 |
Out to Review | Splice 8/15/17 | / | 8/15/2017 | BECKYA | BECKYA | | | Out to Review | 986848 |
County Zoning | Splice 8/15/17 | A | 8/15/2017 | BECKYA | BECKYA | | | County Zoning | 986847 |
Scanned/Finished Bin | Splice 4/11/17 | / | 4/18/2017 | | JESSICAM | Location = Scanned/Finished Bin by JESSICAM | | Scanned/Finished Bin | 953042 |
To Be Scanned Bin | Splice 4/11/17 | / | 4/17/2017 | | JESSICAM | Location = To Be Scanned Bin by JESSICAM | | To Be Scanned Bin | 952992 |
Plan Coordinator | Splice 4/11/17 | / | 4/17/2017 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 952976 |
Mechanical | Splice 4/11/17 | A | 4/17/2017 | JUSTINC | JUSTINC | Revised heat loss calculations and duct design same equipment | | Mechanical | 952975 |
Mechanical | Splice 4/11/17 | / | 4/17/2017 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 952951 |
Mechanical | Splice 4/11/17 | / | 4/17/2017 | | JESSICAM | Location = Mechanical by JESSICAM | | Mechanical | 952817 |
Plan Coordinator | Splice 4/11/17 | / | 4/17/2017 | | GITA | Location = Plan Coordinator by GITA | | Plan Coordinator | 952778 |
Resubmittal 1 | Splice 4/11/17 | / | 4/17/2017 | GITA | GITA | Resubmittal #1 | | Resubmittal 1 | 952774 |
Out to Review | Splice 4/11/17 | / | 4/14/2017 | NELIDA | NELIDA | Gordon 491-9635 | | Out to Review | 952390 |
Finished Bin | Splice 4/11/17 | / | 4/12/2017 | | JLANE | Location = Finished Bin by JLANE | | Finished Bin | 951644 |
Plan Coordinator | Splice 4/11/17 | / | 4/12/2017 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 951580 |
Mechanical | Splice 4/11/17 | D | 4/12/2017 | JUSTINC | JUSTINC | Total heat loss indicated on HVAC equipment certificate does NOT match combined totals of loss from project summary sheets? Verify. Missing (ENTIRE HOUSE) project summary sheet.
DUCT DESIGN OK WALK OK (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 951579 |
Mechanical | Splice 4/11/17 | / | 4/12/2017 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 951517 |
Mechanical | Splice 4/11/17 | / | 4/12/2017 | | JLANE | Location = Mechanical by JLANE | | Mechanical | 951469 |
Plan Coordinator | Splice 4/11/17 | / | 4/12/2017 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 951468 |
Construction | Splice 4/11/17 | A | 4/12/2017 | SHELLEY | SHELLEY | Expanded basement area into previous crawlspace. | | Construction | 951467 |
Construction | Splice 4/11/17 | / | 4/12/2017 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 951445 |
Construction | Splice 4/11/17 | / | 4/11/2017 | | JESSICAM | Location = Construction by JESSICAM | | Construction | 951332 |
Enumeration | Original | A | 3/24/2017 | AMY | AMY | PROPERTY OWNER IN THE AREA CALLED ENUMERATIONS MULTIPLE TIME REQUESTING THAT THIS ADDRESS BE CHANGED DUE TO THEIR ADDRESS BEING OUT OF ORDER AND NEW HOME WOULD BE LOCATED BEFORE THEIR ADDRESS INSTEAD OF AFTER. ADDRESS CHANGED FROM 818 TO 811 CRYSTAL PARK ROAD. | | Enumeration | 946567 |
Construction | Original | A | 3/13/2017 | SHELLEY | SHELLEY | | | Construction | 943084 |
Electronic Plan | Original | / | 3/13/2017 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 943079 |
Resubmittal 2 | Original | / | 3/13/2017 | GITA | GITA | Resubmittal #2 | | Resubmittal 2 | 943056 |
Construction | Original | D | 3/7/2017 | SHELLEY | SHELLEY | Transfer all notes from previous reviews to new set; provide ledger connection requirements; Specify all hanger connections; locate FG truss; G trusses incorrectly labeled; verify uplift at D2 truss; see plans for all comments. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 941658 |
Electronic Plan | Original | / | 3/7/2017 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 941641 |
Resubmittal 1 | Original | / | 3/6/2017 | GITA | GITA | Resubmittal #1 | | Resubmittal 1 | 941271 |
Enumeration | Original | A | 3/3/2017 | AMY | AMY | DISCUSSED THE BILL THE ISSUE THE PROPERTY OWNER IN THE AREA HAD WITH THE ADDRESS. THERE IS NO GOOD SOLUTION TO THE ADDRESS BEING OUT OF ORDER. THE ADDRESS WILL STAY AS IT IS. 818 CRYSTAL PARK ROAD | | Enumeration | 941097 |
Enumeration | Original | D | 3/2/2017 | AMY | AMY | THE ADDRESS MAYBE ASSIGNED INCORRECTLY. PLEASE CONTACT THIS DEPARTMENT. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 940795 |
Mechanical | Original | A | 2/19/2017 | JUSTINC | JUSTINC | AS NOTED | | Mechanical | 937933 |
Electronic Plan | Original | / | 2/19/2017 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 937932 |
County Zoning | Original | A | 2/16/2017 | DSDRANGEL | DSDRANGEL | PROCESSED AT EPC PLANNING - ALL FEES PAID | | County Zoning | 937560 |
Construction | Original | D | 2/13/2017 | SHELLEY | SHELLEY | Provide headers, kings, trimmers on main level framing for basement openings; provide ledger connection requirements; provide landing framing; specify all beams and columns; truss labeiling does not match truss package provided; missing S4 sheets; see comments on plans. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 936442 |
Electronic Plan | Original | / | 2/13/2017 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 936432 |
Zoning/Planning | Original | / | 2/10/2017 | DSDRANGEL | DSDRANGEL | In Current Review by DSDRANGEL | | Zoning/Planning | 936113 |
Enumeration | Original | A | 2/10/2017 | AMY | AMY | | | Enumeration | 936100 |
Electronic Plan | Original | / | 2/10/2017 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 936076 |
Floodplain | Original | N | 2/9/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 935860 |