Canceled Plans | Original | / | 4/25/2018 | | MINDY | Location = Canceled Plans by MINDY - disapproved plans more than a year old | | Canceled Plans | 1061648 |
Finished Bin | Original | / | 6/26/2017 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 972631 |
Plan Coordinator | Original | / | 6/26/2017 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 972627 |
Plumbing | Original | D | 6/26/2017 | TCRIPPEN | TCRIPPEN | remove toilet bolt flange to floor leave toilet off for inspection, remove shower trim, need 12 x 12 inch opening at sink, only 1 fixture per 1/2 inch water line (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 972626 |
Plumbing | Original | / | 6/26/2017 | | SCANNING | Location = Plumbing by SCANNING | | Plumbing | 972487 |
Plan Coordinator | Original | / | 6/26/2017 | | DALEH | Location = Plan Coordinator by DALEH | | Plan Coordinator | 972471 |
Mechanical | Original | D | 6/26/2017 | DALEH | DALEH | cant access mechanical equipment through bedroom or bathroom see plans for additional red lines return red lines (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 972461 |
Mechanical | Original | / | 6/26/2017 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 972455 |
Mechanical | Original | / | 6/26/2017 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 972414 |
Plan Coordinator | Original | / | 6/23/2017 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 972287 |
Electrical | Original | A | 6/23/2017 | SHELBY | SHELBY | | | Electrical | 972286 |
Electrical | Original | / | 6/23/2017 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 972211 |
Electrical | Original | / | 6/22/2017 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 971758 |
Plan Coordinator | Original | / | 6/22/2017 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 971744 |
Construction | Original | D | 6/22/2017 | SHELLEY | SHELLEY | Show location and spacing of supports for 2x10 beam at roof; clarify if there is a center beam in the floor; 2x10 joists insufficient for floor with 16' span; Design Professional required to assess foundation and provide letter for code compliance; see plans; no walk. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 971743 |
Construction | Original | / | 6/22/2017 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 971708 |
Construction | Original | / | 6/21/2017 | | NELIDA | Location = Construction by NELIDA | | Construction | 971143 |
Zoning/Planning | Original | A | 6/21/2017 | NELIDA | NELIDA | 6/8/17 | | Zoning/Planning | 971128 |
Floodplain | Original | N | 6/21/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 971127 |