SHARP GENERAL CONTRACTORS, INC | B= | C | 11/05/2009 | | MINDY | MINDY | | B= | C | 3908077 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 11/05/2009 | Additional Inspections Required: External Agency Inspection Z= by ZONING is not Completed yet (Contact: ngadson@springsgov.com or 385-5982), . NEED MECAHNICAL FINAL COMPLETED,ALL ELSE OK | BERTW | BERTW | | B= | P | 3907785 |
SHARP GENERAL CONTRACTORS, INC | BFR | C | 11/05/2009 | | BERTW | BERTW | | BFR | C | 3907747 |
ALNOR INC. | BSP | T | 10/22/2009 | PAID (REC#882191) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice for having plaquered put on hood stating type 2 hood | DALEH | DALEH | | BSP | T | 3902050 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 10/08/2009 | FRIE TREATED PLYWOOD @ SHELF OK/1ST LAYER OF SHEETROCK @ 2HR FIRE BARRIER OK | BERTW | BERTW | | BSP | P | 3895932 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 10/02/2009 | need exposed non-fire retardent osb removed at shelf above serving line | BLAKE | BLAKE | | BFR | P | 3893481 |
MATRIX ELECTRIC, INC. | E= | C | 11/05/2009 | | JOSEPH | JOSEPH | | E= | C | 3907651 |
MATRIX ELECTRIC, INC. | E= | R | 11/04/2009 | GFCI PROTECT ALL OUTLETS IN KITCHEN, LABEL SERVICE DISCONNECT, VERIFY OVER CURRENT PROTECTION FOR WARMERS, , SEAL CONDUITS TO COOLERS | MATTHEW | MATTHEW | | E= | R | 3907065 |
MATRIX ELECTRIC, INC. | ER | P | 10/30/2009 | KITCHEN DROP CEILING | JOSEPH | JOSEPH | | ER | P | 3905349 |
MATRIX ELECTRIC, INC. | ER | P | 10/29/2009 | all ceilings ok except for kitchen area | ARNOLD | ARNOLD | | ER | P | 3904850 |
MATRIX ELECTRIC, INC. | ES | C | 10/29/2009 | Commercial Service: set ct meter for 4 wire 240volt 600amp by matrix elec. | ARNOLD | ARNOLD | | ES | C | 3904847 |
MATRIX ELECTRIC, INC. | ER | P | 10/06/2009 | PANEL WALL OK | TIMA | TIMA | | ER | P | 3894428 |
MATRIX ELECTRIC, INC. | ER | P | 10/01/2009 | WALLS ONLY | JOSEPH | JOSEPH | | ER | P | 3892539 |
MATRIX ELECTRIC, INC. | ESL | C | 09/23/2009 | 2 3/4'' PVC TO 1/2 WALL | MATTHEW | MATTHEW | | ESL | C | 3888535 |
ALNOR INC. | H= | C | 11/05/2009 | NEED BALANCE REPORT... received balance report | JON | JON | | H= | C | 3907810 |
ALNOR INC. | H= | P | 11/04/2009 | PLANS NOTE THAT RTU-1 AND RTU-2 ARE TO BE INTERLOCKED WITH EF-1 AND MAKEUP AIR UNIT. NEED AIR BALANCE REPORT. PERMIT NEEDS TO REFLECT WALK IN COOLERS AND CONDENSERS. REST OK. | JON | JON | | H= | P | 3907066 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 11/04/2009 | GAS FINAL | JON | JON | | H= | C | 3907058 |
ALNOR INC. | HD | P | 10/30/2009 | OK FOR TILE. STILL NEED HOODS | JON | JON | | HD | P | 3905573 |
ALNOR INC. | HD | P | 10/19/2009 | OK TO WRAP REST OF DUCT, KITCHEN AREA NOT READY YET. NEED TO HAVE PLANS REVISED AND REMOVE ANY REFERENCE TO TYPE ONE SYSTEM. HOOD IS APPROVED FOR TYPE ONE OR TYPE TWO. HOOD HAS GREASE DRAINS AND FILTER RACKS IN PLACE. FAN APPEARS TO BE APPROVED FOR TYPE ONE ALSO. PLANS SHOW GREASE FILTERS. IN PREVIOUS CASES THERE HAS BEEN MORE RESTRICTION SHOWN ON PLANS FOR INSTALLATION PLACARDS ETC. | JON | JON | | HD | P | 3900018 |
ALNOR INC. | HD | P | 10/12/2009 | DINNING ROOM ROUGH DUCT ONLY OK FOR WRAP. | JON | JON | | HD | P | 3897122 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 10/09/2009 | OK FOR NEW METER..60 LB TEST. NEED RELEASE FOR 2# SYSTEM SENT TO RBD | JON | JON | | HC | C | 3896675 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 10/09/2009 | FOR FINAL NEED METER TAG, REGULATORS, CSPU RELEASE FOR 2# SYSTEM, APPLIANCE CONNECTIONS AND SOLENOID VALVE AT OVEN. | JON | JON | | HI | C | 3896668 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 11/04/2009 | | LYNNIE | LYNNIE | | P= | C | 3907057 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 10/06/2009 | REVISE PLANS TO SHOW AAV | JOEL | JOEL | | PTO | C | 3894512 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 10/02/2009 | NEED 1-1/2'' H20 TO BATHROOM GROUP, COMPLETE H20 FOR 3-COMP SINK, REVISE PLAN TO SHOW AAV FOR HOTLINE HUB DRAIN | JOEL | JOEL | | PTO | P | 3893134 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 09/22/2009 | | LYNNIE | LYNNIE | | PB | C | 3888071 |