SHARP GENERAL CONTRACTORS, INC | B= | C | 08/27/2012 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 4369535 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 08/24/2012 | Additional Inspections Required: AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, LUNALECTRIC, INC. Electrical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 4369173 |
SHARP GENERAL CONTRACTORS, INC | BFR | C | 08/24/2012 | | BERTW | BERTW | | BFR | C | 4369171 |
AIRTECH MECHANICAL, INC. | BSP | T | 08/15/2012 | PAID (REC#1070635) PLAN SPLICE FEE: $75 by: DALEH for Mechanical: to remove smoke detectors in fan powered boxes | DALEH | DALEH | | BSP | T | 4362129 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 07/13/2012 | framing ok pending other roughs completed | BERTW | BERTW | | BFR | P | 4341321 |
LUNALECTRIC, INC. | E= | C | 08/24/2012 | | MIKEC | MIKEC | | E= | C | 4369534 |
LUNALECTRIC, INC. | E= | P | 08/23/2012 | missing receptacle for micro gfci breaker if within 6' of sink. replace receptacle front closet. | BRET | BRET | | E= | P | 4368406 |
LUNALECTRIC, INC. | ES | P | 08/17/2012 | Commercial Service: 250 amp service needs meter set and ct wiring | BRET | BRET | | ES | P | 4364632 |
LUNALECTRIC, INC. | ER | C | 08/17/2012 | | BRET | BRET | | ER | C | 4364628 |
LUNALECTRIC, INC. | ER | P | 08/13/2012 | mc on grid in 207, remove temp thru ceiling need tile removed at all vav locations. | BRET | BRET | | ER | P | 4360369 |
LUNALECTRIC, INC. | ER | P | 08/10/2012 | see plans. | BRET | BRET | | ER | P | 4359510 |
LUNALECTRIC, INC. | ER | P | 08/09/2012 | suspended ceiling see plans for locations | BRET | BRET | | ER | P | 4358509 |
LUNALECTRIC, INC. | ER | P | 07/23/2012 | walls complete | BRET | BRET | | ER | P | 4347068 |
LUNALECTRIC, INC. | ER | P | 07/11/2012 | walls and lid ok except panel wall mc not made to panel can. need to call f ire alarm inspections in with electrical rough inspections | BRET | BRET | | ER | P | 4340003 |
LUNALECTRIC, INC. | ER | P | 06/15/2012 | north area walls only see plans | BRET | BRET | | ER | P | 4327140 |
AIRTECH MECHANICAL, INC. | H= | C | 08/24/2012 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4369453 |
AIRTECH MECHANICAL, INC. | H= | P | 08/22/2012 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4367193 |
AIRTECH MECHANICAL, INC. | H= | P | 08/08/2012 | NEED SMOKE SHUT DOWN ON ALL FAN POWERED BOXES PER APPROVED PLANS, BALANCE REPORT, NEED WOOD PLATFORM UNDER WATER HEATER REPLACED WITH APPROVED MATERIAL FOR PLENUM RATING. | LYNNS | LYNNS | | H= | P | 4357698 |
AIRTECH MECHANICAL, INC. | HD | P | 07/16/2012 | DUCT COMPLETE AT HARD LIDS ONLY. ENSURE NEW WATER HEATER SUPPORT PLATFORM IS RATED FOR RETURN AIR PLENUM. | JON | JON | | HD | P | 4342394 |
AIRTECH MECHANICAL, INC. | HD | P | 06/04/2012 | LOW PRESSURE ROUGH DUCT ABOVE CEILING ALL OK. STILL NEED TO SEE VAV'S INSTALLED, DIFFUSERS AND EXHAUST DUCT INSTALLED. EXHAUST DUCT TO BE ISOLATED FROM RETURN AIR PLENUM. SEE NOTE ON PRINTS REGARDING SMOKE DETECTORS FOR FAN POWERED VAV'S. | NANCY | NANCY | | HD | P | 4320446 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 08/23/2012 | | LYNNIE | LYNNIE | | P= | C | 4367892 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 06/11/2012 | NO WH--PROVIDE 10FT LADDER FOR FINALS | LYNNIE | LYNNIE | | PTO | C | 4324102 |