ELITE PROPERTIES OF AMERICA, INC. | B= | C | 10/26/2017 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5667520 |
ELITE PROPERTIES OF AMERICA, INC. | B= | P | 10/19/2017 | Unfinished basement // Rear deck attached. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | JEREMYA | JEREMYA | | B= | P | 5661330 |
ELITE PROPERTIES OF AMERICA, INC. | B= | P | 10/17/2017 | Post caps on deck need to be used in pairs / Still no ladder to inspect insulation. / Retaining wall is now under 48in and okay. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | COREY | COREY | | B= | P | 5657817 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | P | 10/09/2017 | deck pier observation on file | SCOTTS | SCOTTS | | BSP | P | 5648672 |
ELITE PROPERTIES OF AMERICA, INC. | B= | R | 09/19/2017 | BSP not completed for piers/hole dug by one pier is not at 30" or greater -- provide engineering letter for retaining wall at rear -- deck incomplete -- provide ladder for attic insulation check//update// provide extensions on downspouts // upon further review retaining wall requires permit | SCOTTS | SCOTTS | | B= | R | 5630741 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | R | 09/11/2017 | Only 1 pier appears to be 30" in depth. Will need to verify the others are 30" below grade. | JEREMYA | JEREMYA | | BSP | R | 5622150 |
ELITE PROPERTIES OF AMERICA, INC. | BIN | C | 07/20/2017 | | SCOTTS | SCOTTS | | BIN | C | 5571008 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | C | 07/20/2017 | | SCOTTS | SCOTTS | | BFR | C | 5570990 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 07/18/2017 | draft stop tops of arches on main floor and garage soffit at wall -- repair blocking above front door cantilever -- training with Shaun | SCOTTS | SCOTTS | | BFR | P | 5568443 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | P | 07/10/2017 | Porch posts and lid OK // Deck frame OK // Need to re-dig 1 pier and remove all loose material from the others - DECK PIERS REJECTED | JEREMYA | JEREMYA | | BSP | P | 5559696 |
ELITE PROPERTIES OF AMERICA, INC. | BFI | C | 06/07/2017 | 2" R10 @ 24" ok | SCOTTS | SCOTTS | | BFI | C | 5528796 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | C | 06/07/2017 | Tie in to underdrain complete -- damp proofing ok | SCOTTS | SCOTTS | | BFD | C | 5528772 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | P | 06/07/2017 | engineering on file -- still need visit to verify drain | SCOTTS | SCOTTS | | BFD | P | 5527788 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | C | 06/06/2017 | Foundation observation on-file / foundation plan on file | RICHB | RICHB | | BFN | C | 5526415 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | C | 06/06/2017 | Footing observation on file / open hole & soils on file | RICHB | RICHB | | BFT | C | 5526414 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | C | 06/06/2017 | Soils & open hole observations received - 2400 psf - drain (usable) - 10% // Foundation wall letter received - ufer noted // Footing letter received // Foundation plan received - bearing capacity verified | RICHB | RICHB | | BFN | C | 5526413 |
J2D ELECTRIC, INC. | E= | C | 09/07/2017 | a/c pre wire | RANDY | RANDY | | E= | C | 5619211 |
J2D ELECTRIC, INC. | ES | C | 07/17/2017 | Residential Underground: 200 amp 3/w: new res | MATTHEW | MATTHEW | | ES | C | 5566828 |
J2D ELECTRIC, INC. | ER | C | 07/17/2017 | unfinished basement, 1-15, no vac, ir ufer | MATTHEW | MATTHEW | | ER | C | 5566816 |
OAK VIEW INVESTMENTS, LLC | H= | C | 08/22/2017 | THE A./C IS NOT COMPLETE AND CONDITIONED UNFINISHED BASEMENT. | JEFFB | JEFFB | | H= | C | 5603535 |
OAK VIEW INVESTMENTS, LLC | HC | C | 07/13/2017 | RELEASE METER | JEFFB | JEFFB | | HC | C | 5563965 |
OAK VIEW INVESTMENTS, LLC | HRR | C | 07/13/2017 | THE DUCT DESIGN AND THE EQUIPMENT SPECS ARE ACCURATE. NOTES: UNFINISHED BASEMENT, DIRECT VENT FURNACE AND A/C ROUGH - LINES AND COIL. | JEFFB | JEFFB | | HRR | C | 5563964 |
PRECISION PLUMBING | HI | C | 07/05/2017 | 10 lb test ok. Note: 1" main. Furnace, water heater, range and fireplace. | MARK | MARK | | HI | C | 5555203 |
PRECISION PLUMBING | P= | C | 08/30/2017 | correction made | TED | TED | | P= | C | 5611551 |
PRECISION PLUMBING | P= | P | 08/29/2017 | water leak under right master lav, rest ok, note: unfinished basement, 3/4'' pvb installed | TED | TED | | P= | P | 5609960 |
PRECISION PLUMBING | PTO | C | 07/11/2017 | correction made | TED | TED | | PTO | C | 5560881 |
PRECISION PLUMBING | PTO | R | 07/10/2017 | frame under trap in garage ceiling, note: unfinished basement, tempering valve master closet, | TED | TED | | PTO | R | 5559113 |
PRECISION PLUMBING | PB | C | 06/13/2017 | ok,H20 under footer. | CRADE | CRADE | | PB | C | 5533470 |