KENNEY KONSTRUCTION LLC | B= | C | 08/16/2024 | All other required Final inspections are complete. (This is a computer generated result) | JASONL | JASONL | | B= | C | 8182726 |
KENNEY KONSTRUCTION LLC | B= | P | 08/16/2024 | Final OK pending completion of outstanding inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JASONL | JASONL | | B= | P | 8181994 |
KENNEY KONSTRUCTION LLC | B= | P | 08/15/2024 | Complete outstanding inspections / Missing accessible sinage at both restrooms / (2) entry doors hardware does not meet requirements for locks and lathes / reviewed items with on site representative / -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JASONL | JASONL | | B= | P | 8180645 |
KENNEY KONSTRUCTION LLC | BEN= | C | 08/15/2024 | Not required for permit | JASONL | JASONL | | BEN= | C | 8180188 |
KENNEY KONSTRUCTION LLC | BFR | P | 06/27/2024 | Attach mechanical to permit and complete outstanding inspections / Observed interior light gauge metal wall framing / Reviewed Accessible Elements / pending other rough inspections | JASONL | JASONL | | BFR | P | 8132191 |
EL PASO ELECTRIC, LLC. | E= | C | 08/05/2024 | Electrical complete / | ROB | ROB | | E= | C | 8169236 |
EL PASO ELECTRIC, LLC. | E= | P | 07/26/2024 | See ER comments / | ROB | ROB | | E= | P | 8160122 |
EL PASO ELECTRIC, LLC. | ER | C | 07/26/2024 | Track support ok / Checked devices -- all ok / Verify 50% IECC Rule / | ROB | ROB | | ER | C | 8160117 |
EL PASO ELECTRIC, LLC. | ER | P | 07/19/2024 | Ceilings ok except will need to see all supports and j-boxes for all track lighting ---- Need to see ceiling above panels / | ROB | ROB | | ER | P | 8153417 |
EL PASO ELECTRIC, LLC. | ER | P | 06/28/2024 | Rough for walls ok / / Discussed TR recpts., ANSI 117, and IECC / | ROB | ROB | | ER | P | 8132860 |
EL PASO ELECTRIC, LLC. | ESL | P | 06/20/2024 | PVC in slab in three areas OK> | AARONR | AARONR | | ESL | P | 8124627 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 08/07/2024 | RTUS OK AND ECONOMIZERS INSTALLED. | NICKE | NICKE | | H= | C | 8171983 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/07/2024 | TAB REPORT RECEIVED AND ACCEPTED | NICKE | NICKE | | H= | P | 8171648 |
WESTERN PEAK PLUMBING LLC | HC | C | 08/06/2024 | OK TO RELEASE METER | JERRYF | JERRYF | | HC | C | 8170410 |
WESTERN PEAK PLUMBING LLC | H= | C | 07/31/2024 | NOTE / CORRECTIONS MADE / LETTER FOR GAS VALVES RECEIVED / SEE IMAGES FOR ALL CORRECTIONS / | JERRYF | JERRYF | | H= | C | 8164364 |
WESTERN PEAK PLUMBING LLC | H= | L | 07/25/2024 | SEE HI NOTES FOR FINAL | JERRYF | JERRYF | | H= | L | 8158768 |
WESTERN PEAK PLUMBING LLC | HI | P | 07/25/2024 | BEFORE METER RELEASE NEED LETTER ON COMPANY LETTER HEAD WITH LICENSE HOLDERS SIGNATURE STATING RTU GAS VALVES ARE IN PROPER WORKING ORDER (10# TEST WAS DONE WITH GAS SHUT OFFS OPEN) - TAG GAS LINE AT METER LOCATION WITH SUITE NUMBER (CONTRACTOR CAN ATTACH PHOTO OF LINE TAG TO LETTER AND SUBMIT WITH NEXT INSPECTION REQUEST - BEFORE FINAL NEED TO ADD 1 GAS STUB TO PERMIT WORK SCOPE NOTE / PRESSURE TEST OK / PIPING PER PLAN | JERRYF | JERRYF | | HI | P | 8158767 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/18/2024 | FINAL PENDING ROOF INSPECTION AND TAB REPORT. | NICKE | NICKE | | HD | P | 8151101 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/12/2024 | STILL NEED RESTROOM EXHAUST COMPLETED (LEAVE TILE OUT TO VERIFY NOTE / ABOVE CEILING SA / RA / MAINS / RUN OUTS / OK / | JERRYF | JERRYF | | HD | P | 8146046 |
MEP INDUSTRIAL LLC | P= | C | 08/06/2024 | | CODYP | CODYP | | P= | C | 8170583 |
MEP INDUSTRIAL LLC | PTO | C | 07/17/2024 | Note: Add 2 floor drains to scope by final / need trap primer access at final / check water heater at final / Need water heater pan drain support by water heater. | DANR | DANR | | PTO | C | 8149508 |
MEP INDUSTRIAL LLC | PTO | P | 07/12/2024 | Cannot install waste receptor in ceiling for water heater pan drain ( 2018 IPC 802.4) - contractor to have engineer address water heater pan drain location / rest ok. Note: Add 2 floor drains to scope by final / need trap primer access at final / check water heater at final. | DANR | DANR | | PTO | P | 8145599 |
MEP INDUSTRIAL LLC | PTO | P | 06/28/2024 | In wall DWV and H2o only Ok. / still need remainder. Note: Add 2 floor drains to scope of work by final. / Need trap primer access at final. | DANR | DANR | | PTO | P | 8132698 |
MEP INDUSTRIAL LLC | PTO | P | 06/27/2024 | In wall DWV and H2o only: Need nail protection / rest ok for in wall. Note: need trap primer access at final. | DANR | DANR | | PTO | P | 8131612 |
MEP INDUSTRIAL LLC | PB | C | 06/21/2024 | Trap primers reviewed via images sent by contractor. Note: Add 2 floor drains to scope of work by final. | DANR | DANR | | PB | C | 8125436 |
MEP INDUSTRIAL LLC | PB | P | 06/20/2024 | Need Trap primers installed, add 2 floor drains to scope of work / Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / rest ok. | DANR | DANR | | PB | P | 8123948 |