GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 12/04/2000 | | DANF | DANF | | B= | C | 1862150 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 12/04/2000 | LISTINGS WITH INSPECTOR | DANF | DANF | | BFR | C | 1862158 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/01/2000 | 80% OF ONE HOUR TENT COMPLETED; NEED COPY OF UL RATED SYSTEM USED FOR GRID CEILING | DANF | DANF | | BFR | P | 1862142 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/22/2000 | One hour wall penetrations okay. | LEEG | LEEG | | BFR | P | 1862134 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/26/2000 | ALCOVE AT NORTH EXIT | DANF | DANF | | BFR | P | 1862126 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/28/2000 | CORRIDOR FRAMING TO NORTH EXIT OK | DANF | DANF | | BFR | P | 1862118 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/22/2000 | 1ST FLOOR BATHROOM FRAMING OK | DANF | DANF | | BFR | P | 1862110 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/21/2000 | 2ND FLOOR BATHROOM, SOUTH STAIRWELL, CORRIDOR OK EXCEPT NORTH CORRIDOR WHERE BEAM IS PART OF RATED WALL | DANF | DANF | | BFR | P | 1862101 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/05/2000 | 2ND FLOOR BREAK ROOM, BATHROOMS OK, TOP OF 1ST FLOOR TUNNEL | DANF | DANF | | BFR | P | 1862094 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/22/2000 | CORRIDOR DOORS AND DOOR FRAMING OK; TOP OF CORRIDOR TAPED AND SEALED; WINDOW PATCH OK; | DANF | DANF | | BFR | P | 1862086 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/15/2000 | CORRIDOR WALLS OK EXCEPT AREAS WITH DOORS; NEED FIRE CAULKING INSPECTION INTERIOR WALLS OK; NEED FIX FOR PATCHED WINDOW AREA 2ND FLOOR; SSING LATERIAL BRACING AT TRUSS "D" 8) CLIP TOP PLATE TO KITCHEN BAY AND GARAGE BAY | DANF | DANF | | BFR | P | 1862078 |
WISE ELECTRIC, INC. | E= | C | 12/01/2000 | | MIKEC | MIKEC | | E= | C | 1862381 |
WISE ELECTRIC, INC. | E= | P | 11/30/2000 | except devo and comp. eng | MIKEC | MIKEC | | E= | P | 1862373 |
WISE ELECTRIC, INC. | E= | P | 11/29/2000 | upper mezz, except back rows of lighting, room 1001 except EPO switch and buss duct | MIKEC | MIKEC | | E= | P | 1862365 |
WISE ELECTRIC, INC. | E= | P | 11/28/2000 | 1st floor areas [ check with electrican ] | MIKEC | MIKEC | | E= | P | 1862357 |
WISE ELECTRIC, INC. | ER | P | 11/27/2000 | test of epo switches | MIKEC | MIKEC | | ER | P | 1862349 |
WISE ELECTRIC, INC. | ER | P | 11/20/2000 | ceilings | MIKEC | MIKEC | | ER | P | 1862341 |
WISE ELECTRIC, INC. | ER | P | 11/13/2000 | ceiling main area mezz. fixtures below grid | MIKEC | MIKEC | | ER | P | 1862334 |
WISE ELECTRIC, INC. | E= | P | 09/26/2000 | lights | MIKEC | MIKEC | | E= | P | 1862325 |
WISE ELECTRIC, INC. | ER | P | 09/11/2000 | transformers | MIKEC | MIKEC | | ER | P | 1862318 |
WISE ELECTRIC, INC. | ER | P | 08/30/2000 | check with electrican for inspected walls | MIKEC | MIKEC | | ER | P | 1862310 |
WISE ELECTRIC, INC. | ER | P | 08/15/2000 | walls rooms 1001,1009,1011,1012,1036 | MIKEC | MIKEC | | ER | P | 1862302 |
WISE ELECTRIC, INC. | ER | P | 07/31/2000 | concrete cut [ slab ] | MIKEC | MIKEC | | ER | P | 1862295 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 11/27/2000 | | JOHNW | JOHNW | | H= | C | 1862275 |
HEATING & PLUMBING ENGINEERS, INC | HRP | C | 11/07/2000 | | JOHNW | JOHNW | | HRP | C | 1862250 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 10/27/2000 | chilled and hot water piping complete | JOHNW | JOHNW | | H= | P | 1862242 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 10/05/2000 | hot water lines complete ok to complete the in insulation wrap | JOHNW | JOHNW | | H= | P | 1862234 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 10/02/2000 | additional heat piping / inspection on aug 22 was a chilled water lines to lebert units was called in wrong | JOHNW | JOHNW | | HWP | P | 1862226 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/31/2000 | above ceiling rough on 1st floor and 2nd floor mezzine area also lab area / [Lebert units not in yet] | JOHNW | JOHNW | | HD | P | 1862209 |
HEATING & PLUMBING ENGINEERS, INC | HWP | C | 08/22/2000 | welded lines | JOHNW | JOHNW | | HWP | C | 1862181 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/16/2000 | radiation dampers in coridor ceiling by the elevator area 10 north end ok | JOHNW | JOHNW | | HD | P | 1862173 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 11/21/2000 | | LEE | LEE | | P= | C | 1862266 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 11/20/2000 | Breakroom sink S-traped and laundry tub in model room needs to be secured, rest ok | LEE | LEE | | P= | P | 1862258 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 09/08/2000 | | JIMV | JIMV | | PTO | C | 1862218 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/30/2000 | Area 10, phase 2, lower-level DWV ( below breakroom ) and partial water, ok, could not locate permit, new plumber on job | LEE | LEE | | PTO | P | 1862200 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/23/2000 | restrooms OK need accesable urinal cleanouts | JIMV | JIMV | | PTO | P | 1862187 |
HEATING & PLUMBING ENGINEERS, INC | PB | C | 07/28/2000 | | JIMV | JIMV | | PB | C | 1862282 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 07/27/2000 | S. side restrooms OK | JIMV | JIMV | | PB | P | 1862165 |