GERALD H PHIPPS INC | B= | C | 05/13/2002 | | DANF | DANF | | B= | C | 2204108 |
GERALD H PHIPPS INC | B= | P | 04/26/2002 | INSTALL HANDRAIL BOTH SIDES OF STEPS NORTH EXITS | DANF | DANF | | B= | P | 2204087 |
GERALD H PHIPPS INC | BFR | C | 04/26/2002 | | DANF | DANF | | BFR | C | 2204094 |
GERALD H PHIPPS INC | BSP | P | 04/26/2002 | FIRECAULKING OK | DANF | DANF | | BSP | P | 2204102 |
GERALD H PHIPPS INC | BSP | P | 04/24/2002 | FIRECAULKING OK EXCEPT AREA ABOVE CORRIDOR HALL DOOR; RECALL | DANF | DANF | | BSP | P | 2204080 |
GERALD H PHIPPS INC | BSP | R | 04/19/2002 | FIRECAULKING ABOVE GRID NOT COMPLETED | DANF | DANF | | BSP | R | 2204073 |
GERALD H PHIPPS INC | BFR | P | 04/08/2002 | NORTH OF GRID "D" OK; STILL NEED FIRECAULKING INSPECTION | DANF | DANF | | BFR | P | 2204067 |
GERALD H PHIPPS INC | BFR | P | 03/26/2002 | DEMOUNTABLE FRAMING OK SOUTH SIDE | DANF | DANF | | BFR | P | 2204059 |
GERALD H PHIPPS INC | BFR | P | 03/22/2002 | GRID "D" TO SOUTH OK TO ROCK; NEED FIRECAULKING INSPECTION AT CORRIDOR | DANF | DANF | | BFR | P | 2204052 |
GERALD H PHIPPS INC | BFR | P | 03/14/2002 | 2ND FLOOR WALLS OK | DANF | DANF | | BFR | P | 2204045 |
GERALD H PHIPPS INC | BFR | R | 03/12/2002 | CONTRACTOR LEFT SITE; RECALL | DANF | DANF | | BFR | R | 2204038 |
GERALD H PHIPPS INC | BFR | P | 02/28/2002 | SECOND FLOOR AREA 9 FRAMING TO DECK, FIRECAULK PENATRATIONS | PHIL | PHIL | | BFR | P | 2204032 |
GERALD H PHIPPS INC | BFR | P | 02/22/2002 | SOUTH SKYLITE SOFFET FRAMING OK; COLUMN FRAMING OK | DANF | DANF | | BFR | P | 2204023 |
ENCOMPASS ELEC. TECHNOLOGIES | E= | C | 04/25/2002 | | MIKEC | MIKEC | | E= | C | 2204250 |
ENCOMPASS ELEC. TECHNOLOGIES | E= | P | 04/23/2002 | 2nd floor | MIKEC | MIKEC | | E= | P | 2204243 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 04/22/2002 | ceilings | MIKEC | MIKEC | | ER | P | 2204235 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 04/18/2002 | main entry and clouds | MIKEC | MIKEC | | ER | P | 2204225 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 04/15/2002 | 2nd floor ceiling and area c | MIKEC | MIKEC | | ER | P | 2204220 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 04/09/2002 | rest of walls | MIKEC | MIKEC | | ER | P | 2204206 |
ENCOMPASS ELEC. TECHNOLOGIES | ES | P | 04/09/2002 | transformer and panels | MIKEC | MIKEC | | ES | P | 2204214 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 04/01/2002 | 2nd floor office walls | MIKEC | MIKEC | | ER | P | 2204199 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 03/27/2002 | 1ST FLOOR SOUTH ARE A AND C-BATHE CEILINGS 1ST FLOOR | RED | RED | | ER | P | 2204260 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 03/21/2002 | walls see highlighted area on prints | MIKEC | MIKEC | | ER | P | 2204192 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 03/13/2002 | see highlighted area on prints | MIKEC | MIKEC | | ER | P | 2204185 |
ENCOMPASS ELEC. TECHNOLOGIES | ER | P | 02/28/2002 | 2ND FLOOR SHEET ROCK WALLS | RED | RED | | ER | P | 2204253 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 04/25/2002 | | JOHNW | JOHNW | | H= | C | 2204178 |
HEATING & PLUMBING ENGINEERS, INC | HD | C | 04/11/2002 | need to complete registers also duct detectors / need to be located on duct before any outlets also sampling tubes must run thru the larger duct and be supported on the other side | JOHNW | JOHNW | | HD | C | 2204158 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/22/2002 | 2nd floor areas A and C complete. | LYNNS | LYNNS | | HD | P | 2204143 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/12/2002 | 1st floor west end "C" above ceiling rough | JOHNW | JOHNW | | HD | P | 2204129 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 04/25/2002 | | LEE | LEE | | P= | C | 2204172 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 04/24/2002 | Expansion tank too small, complete D/F hook up | LEE | LEE | | P= | P | 2204165 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 03/27/2002 | | LEE | LEE | | PTO | C | 2204151 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/21/2002 | Restrooms and two breakroom sinks ok, need lower breakroom sink (west side) | LEE | LEE | | PTO | P | 2204136 |
HEATING & PLUMBING ENGINEERS, INC | PB | C | 03/06/2002 | | LEE | LEE | | PB | C | 2204123 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 03/01/2002 | Trunk line risers and latterals ok up to coloum 2 ok, also break room sink and d/f ok | LEE | LEE | | PB | P | 2204115 |