NUNN CONSTRUCTION, INC. | B= | C | 05/26/2005 | | TERRYB | TERRYB | | B= | C | 2490381 |
NUNN CONSTRUCTION, INC. | BSP | P | 02/25/2005 | IN DISCUSSION WITH ARCHITECT AND ENGINEER, AND IN PERSONAL RESEARCH, THE STEEL BEAM IN THE SHAFT IS THICK ENOUGH AND PROTECTED ENOUGH WITHIN THE SHAFT TO WITHSTAND ANY FORSEEABLE FIRE INCIDENT. NO FURTHER PROTECTION OF THE BEAM REQUIRED. | SEAN | SEAN | | BSP | P | 2490377 |
NUNN CONSTRUCTION, INC. | BE | P | 01/20/2005 | BUILDING EXTENSION | SEAN | SEAN | | BE | P | 2490375 |
NUNN CONSTRUCTION, INC. | B= | P | 07/24/2004 | Temp CO: BUILDING, ELECTRICAL, FIREPREV., ZONING, CITY ENG TEMPS | ROLF | ROLF | | B= | P | 2490245 |
NUNN CONSTRUCTION, INC. | B= | P | 06/23/2004 | NEED ADDRESS ON BUILDING PERMANENT SIGNAGE INSTALLED, NEED ALL OTHER FINALS CLEARED, NEED FIX FOR BEAM IN SHAFT APPROVED,EXTERIOR BALCONY ON SECOND FLOOR OFF BREAKROOM CANNOT HAVE STEP ATAT DOOR, SOUTH STAIRS FROM FIRST LANDING MORE THAN 3/8" VARIANCE, OK FOR TCO | TERRYB | TERRYB | | B= | P | 2490371 |
NUNN CONSTRUCTION, INC. | BSP | P | 05/20/2004 | IN CONVERSATION WITH ARCHITECT ON 4/9/04, STEEL BEAM IN SHAFT TO BE PROTECTED WITH NEW CONSTRUCTION. HAVE YET TO SEE ANY DETAILS. | SEAN | SEAN | | BSP | P | 2490369 |
NUNN CONSTRUCTION, INC. | BSP | P | 03/23/2004 | SHAFT NEEDS TO HAVE STEEL BEAMS PROTECTED AS REQUESTED ON PREVIOUS INSPECTION | TERRYB | TERRYB | | BSP | P | 2490365 |
NUNN CONSTRUCTION, INC. | BSP | P | 03/22/2004 | NEED TO CLARIFY MECHANICAL SHAFT FIREPROOFING AT STEEL BEAMS | TERRYB | TERRYB | | BSP | P | 2490363 |
NUNN CONSTRUCTION, INC. | BFR | P | 02/04/2004 | NORTH BUILDING SECOND FLOOR BATHROOM WALLS FIRECAULKING | TERRYB | TERRYB | | BFR | P | 2490359 |
NUNN CONSTRUCTION, INC. | BSP | R | 01/23/2004 | CORE BOARD ASSEMBLY TO ROOF PENTHOUSE, WRAP I-BEAMS PARRALLELL TO WALLS FILL ALL PENETRATIONS ,PROVIDE SPECIAL DETAILS FOR PIPING <16" AT PENTHOUSE OUTLET | RICH | RICH | | BSP | R | 2490357 |
NUNN CONSTRUCTION, INC. | BSP | P | 01/08/2004 | FIRECAULKING OVER BATHROOM DROP CEILINGS NORTH FIRST FLOOR | TERRYB | TERRYB | | BSP | P | 2490353 |
NUNN CONSTRUCTION, INC. | BSP | P | 12/23/2003 | OK FIRE SEPERATION WALL ; UPPER LEVEL , SOUTH WING. | BOBB | BOBB | | BSP | P | 2490351 |
NUNN CONSTRUCTION, INC. | BFR | P | 12/23/2003 | OK FRAMING FOR UPPER LEVEL AT NORTH WING. | BOBB | BOBB | | BFR | P | 2490347 |
NUNN CONSTRUCTION, INC. | BFR | P | 12/08/2003 | MAIN LEVEL NORTH BUILDING | TERRYB | TERRYB | | BFR | P | 2490345 |
NUNN CONSTRUCTION, INC. | BFT | P | 11/25/2003 | MECHANICAL SCREEN WALL SOUTH OF SOUTH BUILDING | TERRYB | TERRYB | | BFT | P | 2490341 |
NUNN CONSTRUCTION, INC. | BSP | P | 10/21/2003 | SOUTH BUILDING BASEMENT CORRIDOR FIRECAULKING OK | TERRYB | TERRYB | | BSP | P | 2490339 |
NUNN CONSTRUCTION, INC. | BFR | P | 10/16/2003 | SOUTH BUILDING,ELEVATOR SHAFT,WALLS TO DECK MIDDLE AND UPPER FLOORS, NORTH BUILDING, ELEVATOR SHAFT, BASEMENT CORRIDOR AND BATHROOM AND ELECTRIC ROOM WALLS | TERRYB | TERRYB | | BFR | P | 2490335 |
NUNN CONSTRUCTION, INC. | BFR | P | 09/10/2003 | PARTITION WALLS IB BASEMENT SOUTH BUILDING | TERRYB | TERRYB | | BFR | P | 2490333 |
NUNN CONSTRUCTION, INC. | BFR | P | 08/29/2003 | HARD LID FRAMING IN ROOMS S004 AND 2015, PONY WALLS OVER BLOCK WALLS IN BASEMENT OF SOUTH BUILDING | TERRYB | TERRYB | | BFR | P | 2490329 |
NUNN CONSTRUCTION, INC. | BFR | R | 08/28/2003 | COULDN'T FIND ANYONE FOR FRAMING, DIDN'T GIVE ME ANY DIRECTIONS FOR INSPECTIONS | JIMP | JIMP | | BFR | R | 2490327 |
NUNN CONSTRUCTION, INC. | BFT | P | 08/26/2003 | FOOTERS AND PADS AT LOBBY AND PILASTERS AT SOUTH SIDE OF NORTH BUILDING | TERRYB | TERRYB | | BFT | P | 2490323 |
NUNN CONSTRUCTION, INC. | BFR | P | 08/20/2003 | WENT OVER COLUMN FRAMING WITH SUPERVISER FOR FRAMING COMPANY | TERRYB | TERRYB | | BFR | P | 2490321 |
NUNN CONSTRUCTION, INC. | BFD | C | 08/20/2003 | | TERRYB | TERRYB | | BFD | C | 2490317 |
NUNN CONSTRUCTION, INC. | BFD | P | 08/12/2003 | SOUTH BUILDING COMPLETE | RICK | RICK | | BFD | P | 2490315 |
NUNN CONSTRUCTION, INC. | BFD | P | 08/07/2003 | WEST SIDE OF NORTH BUILDING | TERRYB | TERRYB | | BFD | P | 2490311 |
NUNN CONSTRUCTION, INC. | BFN | P | 07/18/2003 | NORTH BUILDING STAIRWAY | TERRYB | TERRYB | | BFN | P | 2490309 |
NUNN CONSTRUCTION, INC. | BFN | P | 07/03/2003 | SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFN | P | 2490305 |
NUNN CONSTRUCTION, INC. | BFN | P | 07/02/2003 | STAIRWELL SOUTH BUILDING, SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFN | P | 2490297 |
NUNN CONSTRUCTION, INC. | BFD | P | 07/02/2003 | SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFD | P | 2490293 |
NUNN CONSTRUCTION, INC. | BFT | P | 07/02/2003 | NORTH SECTION OF SOUTH BUILDING, SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFT | P | 2490299 |
NUNN CONSTRUCTION, INC. | BFT | P | 07/02/2003 | SOUTH BUILDING SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFT | P | 2490303 |
NUNN CONSTRUCTION, INC. | BFN | P | 06/26/2003 | OK TO POUR NEED OPEN HOLE LETTER | TERRYB | TERRYB | | BFN | P | 2490287 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/26/2003 | THREE INTERIOR PADS NORTH BUILDING SEE PLANS | TERRYB | TERRYB | | BFT | P | 2490291 |
NUNN CONSTRUCTION, INC. | BFN | P | 06/19/2003 | SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFN | P | 2490281 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/19/2003 | SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFT | P | 2490285 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/17/2003 | SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFT | P | 2490280 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/13/2003 | SEE PLANS | RICK | RICK | | BFT | P | 2490276 |
NUNN CONSTRUCTION, INC. | BFT | R | 06/12/2003 | CANCELLED BY CONTRACTOR | RICK | RICK | | BFT | R | 2490273 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/11/2003 | SEE PLANS FOR AREA INSPECTED | TERRYB | TERRYB | | BFT | P | 2490269 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/10/2003 | SEE PLANS | TERRYB | TERRYB | | BFT | P | 2490265 |
NUNN CONSTRUCTION, INC. | BFN | P | 06/06/2003 | FROM E LINE EAST AND SOUTH TO LINE 1.5 | TERRYB | TERRYB | | BFN | P | 2490256 |
NUNN CONSTRUCTION, INC. | BFN | P | 06/04/2003 | FROM E LINE WEST TO 3.5 LINE | TERRYB | TERRYB | | BFN | P | 2490254 |
NUNN CONSTRUCTION, INC. | BFT | P | 06/03/2003 | BALANCE OF INTERIOR PADS, BALANCE OF 9' FOOTER AT EAST WALL LINE 3.5 THRU 1.5 | TERRYB | TERRYB | | BFT | P | 2490250 |
NUNN CONSTRUCTION, INC. | BFT | P | 05/23/2003 | WALL LINE 4 'A THRU H' | TERRYB | TERRYB | | BFT | P | 2490249 |
DYNALECTRIC COMPANY | E= | C | 07/07/2004 | | JOSEPH | JOSEPH | | E= | C | 2490667 |
DYNALECTRIC COMPANY | E= | P | 07/01/2004 | GATE CONTROLLER; ROMEX IN PANEL FOR TEMP WIRING; SIGN ; SEPERATION BARRIER FLOOR BOXES | JOSEPH | JOSEPH | | E= | P | 2490665 |
DYNALECTRIC COMPANY | E= | P | 06/10/2004 | 1. S. MAIN ELEC ROOM 1ST FL COVER PLATE FIRE ALARM BOX. 2. COVER PLATE OUTSIDE SECURITY ROOM IN CEILING 3. MEN'S LOCKER ROOM LIGHT FIXTURE 4. FINISH WIRING GATE CONTROLLER 5.PANEL SRS IN BASEMENT KO SEAL MISSING 6.BLANK COVERS MISSING SW CORNER 2ND LEVEL 7.2ND FL OUTLETS IN UPS RM NOT FINISHED 8.DOOR FOR PANEL M2S1 REPAIR OR REPLACE 9. SEPERATION BARRIERS FOR ALL FL BOXES 10 FINISH DIMMING CONTROLS FOR BOARD HEARING ROOM | JOSEPH | JOSEPH | | E= | P | 2490662 |
DYNALECTRIC COMPANY | ER | P | 04/12/2004 | NORTH WING CEILINGS OK TO CLOSE | GARYL | GARYL | | ER | P | 2490660 |
DYNALECTRIC COMPANY | ER | P | 03/22/2004 | UPPER AND LOWER CEILINGS SOUTH SIDE,ELECTRIC ROOM BASEMENT NORTH | BRET | BRET | | ER | P | 2490656 |
DYNALECTRIC COMPANY | ER | P | 03/08/2004 | EXTERROR WALLS NORTH BASEMENT OK TO COVER | GARYL | GARYL | | ER | P | 2490654 |
DYNALECTRIC COMPANY | ER | P | 02/23/2004 | WALLS OK TO COVER, IN NORTH AREA, MAIN LEVEL, WITH DEMOUNTABLE WALLS | GARYL | GARYL | | ER | P | 2490650 |
DYNALECTRIC COMPANY | ER | P | 02/12/2004 | UPPER LEVEL SOUTH WALLS ONLY, MAIN LEVEL, NORTHWEST WALLS ONLY, NOTE! NOT MIDDLE SECTION | GARYL | GARYL | | ER | P | 2490648 |
DYNALECTRIC COMPANY | ESL | P | 02/02/2004 | 1ST FLOOR--SOUTH SIDE WALLS F THROUGH H,2ND FLOOR--SOUTH SIDE WALLS A THROUGH F | JERRY | JERRY | | ESL | P | 2490644 |
DYNALECTRIC COMPANY | ER | P | 01/26/2004 | HARD LIDS IN BATHROOMS N213,N214 & HEARING ROOM HARD SOFFITS | TIMA | TIMA | | ER | P | 2490640 |
DYNALECTRIC COMPANY | ER | P | 01/23/2004 | SOUTH MAIN LEVEL COLUMN LINES A-F WALLS OK | TIMA | TIMA | | ER | P | 2490638 |
DYNALECTRIC COMPANY | ER | P | 01/07/2004 | FIRST FLOOR RESTROOM HARDLID CEILING. | RON | RON | | ER | P | 2490634 |
DYNALECTRIC COMPANY | ER | P | 12/22/2003 | N UPPER WALLS, HARD LIDS UPPER BATHROOMS, PARAPET ROOF LIGHTING. | DAVID | DAVID | | ER | P | 2490628 |
DYNALECTRIC COMPANY | ES | C | 12/22/2003 | REST OF PANELS AND TRANSFORMERS ALL OK!! | DAVID | DAVID | | ES | C | 2490632 |
DYNALECTRIC COMPANY | ER | P | 12/08/2003 | COLUMNS (7 TOTAL) LOWER LEVEL OK TO CLOSE | GARYL | GARYL | | ER | P | 2490624 |
DYNALECTRIC COMPANY | ES | P | 12/05/2003 | 2500 A 3 PHASE 4 WIRE CT METER BY DYNAELECTRIC. NEED PERMANENT POWER. MAIN SWITCHGEAR ONLY!! | DAVID | DAVID | | ES | P | 2490622 |
DYNALECTRIC COMPANY | ES | R | 12/04/2003 | ALL PVC NEED BUSHINGS. | IKE | IKE | | ES | R | 2490618 |
DYNALECTRIC COMPANY | ER | P | 12/01/2003 | WALLS FIRST FLOOR NORTH END | RED | RED | | ER | P | 2490616 |
DYNALECTRIC COMPANY | ESL | P | 11/19/2003 | ATRIUM SLAB | RED | RED | | ESL | P | 2490612 |
DYNALECTRIC COMPANY | ER | P | 11/05/2003 | ATRIUM DECK ROUGH | MIKEC | MIKEC | | ER | P | 2490610 |
DYNALECTRIC COMPANY | ER | P | 10/16/2003 | UPPER FLOOR EXTERIOR WALLS AND FLOOR HEARING ROOM | RED | RED | | ER | P | 2490606 |
DYNALECTRIC COMPANY | ER | P | 10/10/2003 | SEE HIGHLIGHTED PRINTS | MIKEC | MIKEC | | ER | P | 2490604 |
DYNALECTRIC COMPANY | EUG | P | 09/25/2003 | SITE LIGHTING EAST | RED | RED | | EUG | P | 2490599 |
DYNALECTRIC COMPANY | ER | R | 09/24/2003 | CALLED NO ANSWER SO DID NOT GO-4:30 | RED | RED | | ER | R | 2490572 |
DYNALECTRIC COMPANY | EUG | P | 09/19/2003 | EAST SIDE SITE LIGHTING OK | TIMA | TIMA | | EUG | P | 2490568 |
DYNALECTRIC COMPANY | EUG | P | 09/18/2003 | SECONDARYS TO TRANSFORMER FROM BUILDING OK | TIMA | TIMA | | EUG | P | 2490565 |
DYNALECTRIC COMPANY | ESL | P | 09/15/2003 | 2ND FLOOR NORTH END OK TO COVER, LOBBY/CENTER BLDG OK TO COVER AS TO WORK DONE TO 9/15 TO GET BACK HOE BACK IN TO COMPLETE DITCH. | GARYL | GARYL | | ESL | P | 2490561 |
DYNALECTRIC COMPANY | ER | P | 09/04/2003 | NORTH SIDE SLAB AND SOUTH BASEMENT WALLS. | DAVID | DAVID | | ER | P | 2490558 |
DYNALECTRIC COMPANY | ESL | P | 08/13/2003 | 2ND FLOOR SLAB OK. LAST INSPECTION SAID 2ND FLOOR SLAB ALSO BUT IT SHOULD HAVE BEEN 1ST FLOOR. | DAVID | DAVID | | ESL | P | 2490555 |
DYNALECTRIC COMPANY | ESL | P | 08/01/2003 | 2ND FLOOR SLAB OK | TIMA | TIMA | | ESL | P | 2490552 |
DYNALECTRIC COMPANY | EUG | P | 07/08/2003 | ELECTRIC ROOM SLAB OK | TIMA | TIMA | | EUG | P | 2490550 |
COBB MECHANICAL CONTRACTORS, INC. | H= | C | 05/20/2004 | HVAC FINAL COMPLETE. | LYNNS | LYNNS | | H= | C | 2490478 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 04/23/2004 | NORTH WING, BASEMENT/WEST, OK TO DROP TILE CEILING. | LYNNS | LYNNS | | H= | P | 2490476 |
COBB MECHANICAL CONTRACTORS, INC. | HC | C | 04/15/2004 | OK TO RELEASE METER. | LYNNS | LYNNS | | HC | C | 2490470 |
COBB MECHANICAL CONTRACTORS, INC. | HV | P | 04/15/2004 | 3- BOILER VENTS AND COMBUSTION AIR COMPLETE. NEED TO SEE WATER HEATER VENT YET. | LYNNS | LYNNS | | HV | P | 2490472 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 04/09/2004 | NORTH WING MAIN LEVEL FINAL ON HVAC. | LYNNS | LYNNS | | H= | P | 2490466 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | C | 04/06/2004 | 60# TEST ON ENTIRE HWP SYSTEM INCLUDING MECH ROOMS OK. | LYNNS | LYNNS | | HWP | C | 2490464 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 04/02/2004 | COULD NOT FIND CONTACT PERSON FOR TESTS IN MECH. ROOMS. RECALL INSPECTION. | LYNNS | LYNNS | | H= | P | 2490460 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 03/31/2004 | SOUTH WING: MAIN AND UPPER LEVELS, NORTH WING: UPPER LEVEL, ALL REGISTERS, GRILLES AND DIFFUSERS COMPLETE. | LYNNS | LYNNS | | H= | P | 2490458 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | P | 03/30/2004 | NORTH WING BASEMENT 2- 100# TESTS ON HEATING SUPPLY AND RETURN LINES OK. | LYNNS | LYNNS | | HWP | P | 2490454 |
COBB MECHANICAL CONTRACTORS, INC. | HRP | C | 03/23/2004 | 4- 250# TESTS ON REFRIGERATION LINES TO #6 AND #7 CONDENSERS OK. | LYNNS | LYNNS | | HRP | C | 2490452 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 03/23/2004 | NEED TO SEAL ALL VAPOR BARRIERS ON FLEXS, NEED TO REMOVE CEILING TILES FOR REGISTER HOOK UP INSPECTION, CORRECT TOO TIGHT RADIUS ON FLEXS TO REGISTERS. | LYNNS | LYNNS | | H= | P | 2490446 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 03/23/2004 | OK TO INSULATE DUCT IN PENTHOUSE AND BASEMENT ON NORTH WING. OK TO INSULATE SOUTH PENTHOUSE DUCT. | LYNNS | LYNNS | | HD | P | 2490448 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 03/05/2004 | ROUG ABOVE CEILING IN BATH ROOM AREA, NORTH WING, BASEMENT OK TO COVER. | LYNNS | LYNNS | | HD | P | 2490442 |
COBB MECHANICAL CONTRACTORS, INC. | HRP | P | 01/29/2004 | 8- 250# TESTS ON LIQUID AND SUCTION LINES TO LEIBERT UNITS 1, 2, 3 AND 5 OK. | LYNNS | LYNNS | | HRP | P | 2490440 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 01/22/2004 | REMAINDER OF THE HIGH PRESSURE AND FIRESMOKE DAMPERS UPPER NORTH AREA ALSO UPPER NORTH PENTHOUSE / SOUTH BASEMENT AHU 1 AND 2 DUCT TIE-INS / ALSO SOUTH PENTHOUSE FIRESMOKE DAMPERS | JOHNW | JOHNW | | HD | P | 2490436 |
COBB MECHANICAL CONTRACTORS, INC. | HRP | P | 01/16/2004 | 2- 250# TESTS ON LIQUID AND SUCTION LINES TO LEIBERT UNIT # 4 SOUTH WING MAIN. | LYNNS | LYNNS | | HRP | P | 2490434 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | P | 01/14/2004 | 2- 100# TESTS ON HEATING AND COOLING SUPPLY AND RETURN LINES IN NORTH UPPER LEVEL OK. | LYNNS | LYNNS | | HWP | P | 2490430 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 01/12/2004 | NORTH WING RISER DUCTS TO PENTHOUSE OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 2490428 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 12/09/2003 | MAIN LEVEL SOUTH WING, AHU-3 SUPPLY, MAIN LEVEL NORTH WING, AHU-4 RELOCATION OF SUPPLY, SOUTH WING: PENTHOUSE RISER DUCTS, UPPER LEVEL 3-BATH SUPPLY AND EXHAUST DUCTS. | LYNNS | LYNNS | | HD | P | 2490424 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | P | 12/04/2003 | 100# TEST ON HEATING WATER SUPPLY AND RETURN MAIN LINES ON UPPER LEVEL SOUTH WING OK. | LYNNS | LYNNS | | HWP | P | 2490422 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | P | 11/20/2003 | 100# TEST ON SUPPLY AND RETURN HEATING LINES, MAIN LEVEL OK. NEED TO SEE COMPLETED SYSTEM TO RADIANT HEATERS ON PERIMETER WHEN INSTALLED. | LYNNS | LYNNS | | HWP | P | 2490418 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 11/20/2003 | MAIN TRUNKS FOR SUPPLY AND RETURN ON UPPER LEVEL COMPLETED AND OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 2490416 |
COBB MECHANICAL CONTRACTORS, INC. | H16 | C | 11/07/2003 | HAD CONVERSATION WITH BOB CROFT, COBB MECHANICAL AND CHRIS MILLER FROM CSPU, CONCERNING TEMPORARY HEAT. GAS LINE ALREADY HAS 60 LB TEST. THERE WILL BE A THREAD-O-LET INSTALLED WITH SHUT OFF VALVE AND TEMPORARY MANIFOLD TO FEED TEMPORARY HEATERS. WHEN GAS IS LIVE THERE WILL NEED TO BE A INSPECTION TO TIFF FOR LEAKS WHEN READY. CHRIS MILLER IS TO BE CONTACTED WHEN PERMANENT APPLIANCES ARE BEING CONNECTED TO REDUCE BACK TO LOW PRESURE. | JON | JON | | H16 | C | 2490412 |
COBB MECHANICAL CONTRACTORS, INC. | HI | P | 10/29/2003 | 60# TEST ON WELDED GAS LINE TO PENTHOUSE OK. | LYNNS | LYNNS | | HI | P | 2490410 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 10/24/2003 | SOUTH MAIN- RISER SHAFT (BASEMENT AND FIRST) OK TO INSULATE, NORTH MAIN- MAIN TRUCK SUPPLY OK TO INSULATE, NORTH BASEMENT COMPLETE EXHAUST AND SUPPLY OK. | LYNNS | LYNNS | | HD | P | 2490406 |
COBB MECHANICAL CONTRACTORS, INC. | HD | R | 10/15/2003 | SUPPLY DUCTS A1S AND A2S AREA"B" OK TO COVER, RETURN DUCT TO RISER SHAFT OK. SEE HIGH LIGHTED PLANS ON SITE FOR DUCT INSPECTED. | LYNNS | LYNNS | | HD | R | 2490405 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | P | 10/03/2003 | 2- 100# TESTS ON HEATING AND COOLING LINES IN CORR. S001-J2 OK TO COVER. | LYNNS | LYNNS | | HWP | P | 2490401 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 09/19/2003 | SOUTH BASEMENT: EF-12 DUCT, FRESH AIR TO LOUVER, AHU-9 EXHAUST FROM LOCKER ROOMS, SUPPLY DUCT, (SEE FIELD SET FOR HIGH-LIGHTED DUCTS INSPECTED), MAIN LEVEL SOUTH: SUPPLY AND RETURN ( SEE FIELD SET FOR HIGH-LIGHTED DUCTS INSPECTED). NEED TO REVISE AND RE-SUBMIT TO RBD, PROPOSED CHANGES IN DESIGN. | LYNNS | LYNNS | | HD | P | 2490399 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 09/03/2003 | EF-13 DUCT IN CORRIDOR- S0001,EAST PORTION OK, FRESH AIR DUCT FROM COL.F-1 THROUGH G-3 OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 2490395 |
COBB MECHANICAL CONTRACTORS, INC. | P= | C | 06/22/2004 | | JACK | JACK | | P= | C | 2490545 |
COBB MECHANICAL CONTRACTORS, INC. | P= | P | 06/18/2004 | NEED APPROVED MISSION BANDS AT ALL STUDOR VENTS, AIR GAP AT WATER HEATER T&P DRIP LEG AND DRAIN PAN, PROVIDE ACCESS TO ALL 3 FLOOR SINKS AND REMOVE DEBRIS FROM THEM | JEFF | JEFF | | P= | P | 2490543 |
COBB MECHANICAL CONTRACTORS, INC. | P= | P | 05/05/2004 | COFFEE BAR IN CENTER OF BUILDING INCOMPLETE, REST OK, 13 BACK FLOW DEVICES | JACK | JACK | | P= | P | 2490534 |
COBB MECHANICAL CONTRACTORS, INC. | PB | C | 05/05/2004 | | JACK | JACK | | PB | C | 2490537 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | C | 05/05/2004 | | JACK | JACK | | PTO | C | 2490540 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 03/15/2004 | ALL COMPLETE EXCEPT REVISIONS | JACK | JACK | | PTO | P | 2490530 |
COBB MECHANICAL CONTRACTORS, INC. | PB | P | 12/18/2003 | CENTER COFFEE BAR AREA OK | JACK | JACK | | PB | P | 2490528 |
COBB MECHANICAL CONTRACTORS, INC. | PRD | C | 12/11/2003 | | JACK | JACK | | PRD | C | 2490524 |
COBB MECHANICAL CONTRACTORS, INC. | PB | P | 12/08/2003 | NEW 4'' TO COFFEE BAR IN CENTER OF BUILDING | JACK | JACK | | PB | P | 2490522 |
COBB MECHANICAL CONTRACTORS, INC. | PRD | P | 12/03/2003 | LACKING EAST DRAINS AND SOUTHEAST OVERFLOW ON NORTH BUILDING | JACK | JACK | | PRD | P | 2490515 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 12/03/2003 | NORTH WING OK | JACK | JACK | | PTO | P | 2490519 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 11/21/2003 | UPPER LEVEL NORTH WING DWV ONLY | JACK | JACK | | PTO | P | 2490513 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 10/30/2003 | NORTH WING MAIN LEVEL CENTER RESTROOMS AND HARD LID AREA OK | JACK | JACK | | PTO | P | 2490510 |
COBB MECHANICAL CONTRACTORS, INC. | PRD | P | 10/29/2003 | SOUTH WING ROOF DRAINS COMPLETE | JACK | JACK | | PRD | P | 2490508 |
COBB MECHANICAL CONTRACTORS, INC. | PRD | P | 10/23/2003 | SOUTH WING ONLY LACK SOUTH OVERFLOWS | JACK | JACK | | PRD | P | 2490505 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 10/15/2003 | UPPER LEVEL SOUTH WING OK | JACK | JACK | | PTO | P | 2490502 |
COBB MECHANICAL CONTRACTORS, INC. | PRD | P | 10/09/2003 | SOUTH BASEMENT LEVEL EXCEPT FOR MECH ROOM | JACK | JACK | | PRD | P | 2490500 |
COBB MECHANICAL CONTRACTORS, INC. | PB | P | 09/25/2003 | CENTER BUILDING BASE OK | JACK | JACK | | PB | P | 2490496 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 09/22/2003 | MAIN LEVEL SOUTH BUILDING | JACK | JACK | | PTO | P | 2490494 |
COBB MECHANICAL CONTRACTORS, INC. | PTO | P | 09/08/2003 | BASEMENT LEVEL SOUTH WING DOMESTIC WATER AND DWV | JACK | JACK | | PTO | P | 2490491 |
COBB MECHANICAL CONTRACTORS, INC. | PB | P | 06/27/2003 | BASEMENT LEVEL NORTH WING DWV OK | JACK | JACK | | PB | P | 2490488 |
COBB MECHANICAL CONTRACTORS, INC. | PB | R | 06/26/2003 | FIELD CANCEL TO MUCH RAIN | JACK | JACK | | PB | R | 2490484 |
COBB MECHANICAL CONTRACTORS, INC. | PB | P | 06/18/2003 | BASEMENT LEVEL SOUTH WING OK | JACK | JACK | | PB | P | 2490482 |
NUNN CONSTRUCTION, INC. | V= | P | 05/27/2004 | THYSSENKRUPP--NORTH CAR # 1--M/R PENE--ACCESS PANEL IN MACH RM CEILING--H/W PENE--M/R DOOR SIGN--RELOCATE SENSOR WIRING IN PIT--OPEN JUNCTION BOXES IN PIT--NON-ELEVATOR CONDUIT RUNNING THROUGH MACH RM--EMER LIGHTS IN CAR--NUMBER CONTROLLER # 2--DATE CROSSHEAD TAG | TOM | TOM | | V= | P | 2490387 |
NUNN CONSTRUCTION, INC. | V= | P | 05/27/2004 | THYSSENKRUPP--SOUTH CAR # 2--ACCESS PANEL IN MACH RM CEILING--FIRE CAULK AROUND FLEX CABLE IN H/W--M/R DOOR SIGN--DATE CROSSHEAD TAG--FIRE FINAL | TOM | TOM | | V= | P | 2490389 |