PINKARD CONSTRUCTION COMPANY | B= | C | 09/16/2005 | | TERRYB | TERRYB | | B= | C | 3028540 |
PINKARD CONSTRUCTION COMPANY | B= | P | 07/01/2005 | OK FOR TCO NEED ALL OTHER FINALS | TERRYB | TERRYB | | B= | P | 3028532 |
PINKARD CONSTRUCTION COMPANY | BLA | C | 06/28/2005 | NEW ENTRYS | TERRYB | TERRYB | | BLA | C | 3028524 |
PINKARD CONSTRUCTION COMPANY | BFR | C | 06/14/2005 | BREAKROOM | TERRYB | TERRYB | | BFR | C | 3028516 |
PINKARD CONSTRUCTION COMPANY | BFR | P | 05/26/2005 | BASEMENT WALLS | TERRYB | TERRYB | | BFR | P | 3028508 |
PINKARD CONSTRUCTION COMPANY | BFR | P | 05/24/2005 | | TERRYB | TERRYB | | BFR | P | 3028500 |
PINKARD CONSTRUCTION COMPANY | BFT | P | 05/23/2005 | TRASH ENCLOSURE | TERRYB | TERRYB | | BFT | P | 3028493 |
PINKARD CONSTRUCTION COMPANY | BFN | P | 05/18/2005 | NEW ENTRY SOUTH WALL | TERRYB | TERRYB | | BFN | P | 3028485 |
QUALTECH ELECTRIC | E= | C | 08/02/2005 | ROOF TOP UNITS OK | GARYL | GARYL | | E= | C | 3028710 |
QUALTECH ELECTRIC | E= | R | 07/11/2005 | 1) DIMMERS/OFFICES IN BASEMENT TOO HOT, 2) MARK PANELS PROPERLY, FEED FROM ETC, 3) HARD WIRE FIXTURES IN BASEMENT, 4) NOTE! 6-RTU'S 2-CORRECT BRKER 4-FUSED DISCONNECT | GARYL | GARYL | | E= | R | 3028702 |
QUALTECH ELECTRIC | E= | P | 06/30/2005 | OK TO OCCUPY, NEED TO SEE BASEMENT, PANELS AND LIGHTING IN OFFICES, WENT OVER WITH RUSS | GARYL | GARYL | | E= | P | 3028694 |
QUALTECH ELECTRIC | ER | P | 06/27/2005 | CEILINGS OK TO COVER | GARYL | GARYL | | ER | P | 3028687 |
QUALTECH ELECTRIC | ESL | C | 06/17/2005 | INTERIOR SLAB | MIKEC | MIKEC | | ESL | C | 3028679 |
QUALTECH ELECTRIC | ER | P | 06/17/2005 | HARDLIDS AND SLAB | MIKEC | MIKEC | | ER | P | 3028671 |
QUALTECH ELECTRIC | ER | P | 06/13/2005 | KITCHEN AREA OK TO COVER | GARYL | GARYL | | ER | P | 3028662 |
QUALTECH ELECTRIC | ES | C | 06/13/2005 | COMMERCIAL SERVICE: 1200A., 4W, U/G, QUALTECH ELECT | GARYL | GARYL | | ES | C | 3028655 |
QUALTECH ELECTRIC | ES | R | 06/10/2005 | 1) RESIZE BOND FROM GRD BUSHINGS, 2) BOND NEUTRAL AND GRD BAR WITH PROPER SIZED WIRE, 3) CHANGE OUT GRD CLAMPS TO APPROVED UNITS | GARYL | GARYL | | ES | R | 3028647 |
QUALTECH ELECTRIC | ER | P | 05/25/2005 | SITE FOREMAN IS RUSS 492-5926 BASEMENT WALLS OK TO COVER | GARYL | GARYL | | ER | P | 3028639 |
QUALTECH ELECTRIC | EUG | P | 05/20/2005 | SITE LIGHTING SOUTH EAST CORNER ONLY OK TO COVER | GARYL | GARYL | | EUG | P | 3028631 |
QUALTECH ELECTRIC | ER | P | 05/20/2005 | WALLS ONLY EXCEPT KITCHEN, OK TO COVER | GARYL | GARYL | | ER | P | 3028622 |
QUALTECH ELECTRIC | EUG | P | 05/12/2005 | SECONDARY CONDUITS | MIKEC | MIKEC | | EUG | P | 3028615 |
QUALTECH ELECTRIC | ES | R | 05/12/2005 | NOT READY FOR SERVICE | MIKEC | MIKEC | | ES | R | 3028607 |
COLORADO SHEET METAL CO., INC. | H= | C | 07/08/2005 | | JIMV | JIMV | | H= | C | 3028599 |
MESA PLUMBING & HEATING INC. | H= | C | 07/01/2005 | GAS CONTRACTOR | JIMV | JIMV | | H= | C | 3028419 |
MESA PLUMBING & HEATING INC. | HI | C | 07/01/2005 | LOW PRESSURE TEST COMPLETE | JIMV | JIMV | | HI | C | 3028411 |
MESA PLUMBING & HEATING INC. | H= | P | 06/30/2005 | STILL NEED 10 # TEST FOR ALL THREADED PIPE. | JIMV | JIMV | | H= | P | 3028403 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/28/2005 | OK TCO MAIN FLOOR, LAST NOTES STILL OPEN. | JIMV | JIMV | | H= | P | 3028590 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/22/2005 | RTU 1 MISSING. NEED TO FINISH HRP INSPECTION AND BASEMENT DUCT INSPECTIONS FOR RTU 4. RTU 2,3,5,6 ROUGH DUCT COMPLETE. | JON | JON | | HD | P | 3028582 |
COLORADO SHEET METAL CO., INC. | HRP | R | 06/22/2005 | BASEMENT FLOODED NO ACCESS. | JON | JON | | HRP | R | 3028574 |
MESA PLUMBING & HEATING INC. | HI | R | 06/21/2005 | NEED TEST. NEED PIPING FINISHED TO WATER HEATER. NEED SUPPORTED TO CODE THROUGH OUT. FINISH PIPING TO EXISITNG RTU'S TO PLANS. MISSING 1 ROOF TOP UNIT FROM DAMAGE. WILL DO PARTIAL FINAL FOR GAS AND HVAC CONTRACTORS WITH GAS LINE CAPPED OFF UNDER ROOF LINE UNTIL MISSING RTU INSTALLED. ONCE INSTALLED RECALL INSPECTION WITH NEW TEST. ALSO WILL NEED PROPER WATER HEATER AND VENT PERMITS WITH INSPECTIONS. | JON | JON | | HI | R | 3028469 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/07/2005 | RTU 4, RTU 3, RTU 6 ROUGH DUCT COMPLETE. ALSO SUPPLY TRUNK LINES AND EXHAUST OVER HARD LIDS. SMOKE SHUT DOWN BY FINAL. INSPECT ROOF WHEN READY. | JON | JON | | HD | P | 3028566 |
MESA PLUMBING & HEATING INC. | HI | P | 05/23/2005 | 60 LB TEST ON WELDED 4'' WITH 7 WELD-O-LETS AND THREE 1 1/4'' LATERIALS. STILL NEED THREADED PIPE INSPECTION WITH 10 LB TEST TO ALL EQUIPMENT CALLED IN WHEN READY. | JON | JON | | HI | P | 3028395 |
MESA PLUMBING & HEATING INC. | P= | C | 07/08/2005 | | JIMV | JIMV | | P= | C | 3028477 |
MESA PLUMBING & HEATING INC. | P= | P | 06/30/2005 | TCO, NEED TOILET PARTITIONS, CHECK BACKGRADE ON OUTSIDE FAUCET, WATER HAMMER DEVICE AT K SINK FOR DW. | JIMV | JIMV | | P= | P | 3028457 |
MESA PLUMBING & HEATING INC. | PTO | C | 06/16/2005 | CHECK WATER ENTRY AND BREAK SINK WASTE TIE IN AT FINAL | JEFF | JEFF | | PTO | C | 3028451 |
MESA PLUMBING & HEATING INC. | PTO | P | 05/25/2005 | RESTROOM GROUPS COMPLETE | JACK | JACK | | PTO | P | 3028442 |
MESA PLUMBING & HEATING INC. | PTO | P | 05/23/2005 | PLUMBING WALL BETWEEN RESTROOMS 106 AND 107 OK | JACK | JACK | | PTO | P | 3028435 |
MESA PLUMBING & HEATING INC. | PB | C | 05/05/2005 | | JACK | JACK | | PB | C | 3028427 |