TURNER CONSTRUCTION COMPANY | B= | C | 11/16/2010 | All other required Final inspections are complete. (This is a computer generated result) | MIKE | MIKE | | B= | C | 4072281 |
TURNER CONSTRUCTION COMPANY | B= | P | 10/25/2010 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-7396), External Agency Inspection Z= by ZONING is not Completed yet (Contact: ngadson@springsgov.com or 385-5982), MURPHY CO MECH CONTRS & ENGNRS Mechanical Final Inspection is not Completed yet. Need fire & mechanical finals | MIKE | MIKE | | B= | P | 4061437 |
TURNER CONSTRUCTION COMPANY | BFR | C | 10/25/2010 | Received Structural Steel Inspection Report from William Armour(34530) | MIKE | MIKE | | BFR | C | 4061435 |
TURNER CONSTRUCTION COMPANY | BBB | C | 10/25/2010 | Received Bond Beam Inspection Report from William Armour(34530) | MIKE | MIKE | | BBB | C | 4061433 |
TURNER CONSTRUCTION COMPANY | BFT | C | 10/25/2010 | Received Footing Inspection Report from William Armour(34530) | MIKE | MIKE | | BFT | C | 4061432 |
TURNER CONSTRUCTION COMPANY | BFR | P | 09/16/2010 | Complete fire barrier wall at boiler room, Need engineer inspection report for footing/foundation/bond beam/structural steel inspections | MIKE | MIKE | | BFR | P | 4041029 |
TURNER CONSTRUCTION COMPANY | BFR | P | 09/09/2010 | 2hr fire barrier wall for Storage Rm #152 ok | MIKE | MIKE | | BFR | P | 4037528 |
TURNER CONSTRUCTION COMPANY | BFR | P | 09/08/2010 | Soffit framing in boiler room rated wall ok | MIKE | MIKE | | BFR | P | 4036783 |
TURNER CONSTRUCTION COMPANY | BFR | P | 08/30/2010 | Shaft wall framing at beam in storage room against stairwell - Need to fire caulk through penetrations | MIKE | MIKE | | BFR | P | 4032203 |
TURNER CONSTRUCTION COMPANY | BSP | P | 08/25/2010 | Reviewed required fire barrier walls - Need to complete and recall inspection | MIKE | MIKE | | BSP | P | 4029840 |
TURNER CONSTRUCTION COMPANY | BSP | P | 08/19/2010 | WALK THROUGH WITH MIKE, SUPER RE RATED WALL FIRECAULKING MISSING AND EGRESS NEEDS; NEED FRAMING COMPLETED | DANF | DANF | | BSP | P | 4026934 |
TURNER CONSTRUCTION COMPANY | BSP | P | 07/22/2010 | Transport "A" Rm #275 & Transport "B" Rm #277 - Inspected UL Listed through penetration at conduit banks | MIKE | MIKE | | BSP | P | 4013800 |
TURNER CONSTRUCTION COMPANY | BFR | P | 07/14/2010 | Elevator Equipment Room #165 - Shaft wall framing ok | MIKE | MIKE | | BFR | P | 4009716 |
TURNER CONSTRUCTION COMPANY | BFR | P | 07/08/2010 | LEVEL 1, FIRE BARRIER FRAMING WALL AT "J" LINE, 11 THROUGH 9.2 HAVE NONE RATED COLUMN CHASE AT 11 AND J, NEED 2HR RATING; LEVEL 2 ROOM 288A FRAMING OK; NEED ENGINEERING FOR HOLES CUT IN EXTERIOR WALL FOR FRESH AIR, 8'X12' 2 IN THIS AREA AND SEVERAL IN OTHER AREAS OF BUILDING | DANF | DANF | | BFR | P | 4006566 |
TURNER CONSTRUCTION COMPANY | BFR | P | 06/17/2010 | Shaft wall framing on J Ln between 4 & 9 Ln under raised deck/floor ok | MIKE | MIKE | | BFR | P | 3997045 |
TURNER CONSTRUCTION COMPANY | BFR | P | 06/04/2010 | 2nd Floor - partition wall framing for Storage Rm#281 & freight elevator ok | MIKE | MIKE | | BFR | P | 3990965 |
TURNER CONSTRUCTION COMPANY | BSP | T | 06/04/2010 | PAID (REC#913059) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages see clouds | TCRIPPEN | TCRIPPEN | | BSP | T | 3990863 |
TURNER CONSTRUCTION COMPANY | BFR | P | 06/02/2010 | 1st Floor - Partition wall on 9.3 Ln between C & H, 2nd Floor - Shaft wall framing at freight elevator door infill ok | MIKE | MIKE | | BFR | P | 3989695 |
TURNER CONSTRUCTION COMPANY | BFR | R | 06/01/2010 | 2hr fire barrier lower level corridor - Framing not complete, Need electric rough inspection, Need spec sheet for rated electric boxes | MIKE | MIKE | | BFR | R | 3988840 |
TURNER CONSTRUCTION COMPANY | BFR | P | 05/27/2010 | Partition wall framing on 9.4 Ln between E & J Ln ok | MIKE | MIKE | | BFR | P | 3987477 |
TURNER CONSTRUCTION COMPANY | BSP | T | 05/26/2010 | PAID (REC#911593) PLAN SPLICE FEE: $50 by: MICHAEL for Construction: New wall types provided - wall ratings modified | MICHAELA | MICHAELA | | BSP | T | 3986436 |
TURNER CONSTRUCTION COMPANY | BFR | R | 05/24/2010 | Partition wall framing on 9.4 Ln between E & J Ln - Work not complete, Need electric rough inspection | MIKE | MIKE | | BFR | R | 3985667 |
TURNER CONSTRUCTION COMPANY | BFR | P | 05/20/2010 | Shaft wall framing in POP Rm #124 ok, Partition wall framing POP Rm #162 ok, Shaft wall framing on J Ln between 8 & 9 ok | MIKE | MIKE | | BFR | P | 3984370 |
TURNER CONSTRUCTION COMPANY | BFR | P | 05/19/2010 | 2hr Fire Barrier wall - Reviewed new/revised plans, Still wall supported on 2hr floor ceiling assembly | MIKE | MIKE | | BFR | P | 3983695 |
TURNER CONSTRUCTION COMPANY | BFR | R | 05/18/2010 | 2nd Floor Transport room #275 & 277 - Need top of wall UL listed design, 2hr fire barrier walls supported on nonrated floor, 1st Floor Room #122 & 123 partion wall between rooms - Need UL listed top of wall design | MIKE | MIKE | | BFR | R | 3983088 |
TURNER CONSTRUCTION COMPANY | BFR | R | 05/14/2010 | Reviewed rated wall construction - 2hr Fire Barrier wall must be supported on 2hr floor/ceiling assembly (floor as competed is not rated), Need to protect back to back boxes in rated walls, Complete framing at top slip track per approved design | MIKE | MIKE | | BFR | R | 3981784 |
TURNER CONSTRUCTION COMPANY | BFR | P | 05/12/2010 | CONTRACTOR IS TO PROVIDE AN ENGINEERING JUDGEMENT FOR HEADWALL DETAIL OF SHAFTWALL WITH SLIPTRACK; ALSO NEED UL 2HR HEAD WALL DETAIL; ROOM 124 2HR COLUMN OK AND OK TO ROCK HALL WALL AND COMMON WALL TO ROOM 124, PUTTY PACK INSTALLED ON THAT WALL; COMMON WALL BETWEEN 123 AND 122 NEED PUTTY PACK IN 2 AREAS | DANF | DANF | | BFR | P | 3980142 |
TURNER CONSTRUCTION COMPANY | BFR | R | 05/07/2010 | Reviewed rated wall framing - Wall framing not complete, need to complete electric conduit, putty pack back to back boxes, complete framing | MIKE | MIKE | | BFR | R | 3978469 |
TURNER CONSTRUCTION COMPANY | BFR | P | 05/05/2010 | ROOM #290 WALL FRAMING OK; NOTED ON APPROVED PLANS SHEET "A114" ; NEED INSPECTION LOG AT NEXT INSPECTION | DANF | DANF | | BFR | P | 3976813 |
TURNER CONSTRUCTION COMPANY | BBB | R | 04/29/2010 | Grouted without RBD inspection, Need engineer inspection report | MIKE | MIKE | | BBB | R | 3974381 |
TURNER CONSTRUCTION COMPANY | BFT | P | 04/16/2010 | Continues footing for CMU wall poured, Need inspection report from Terricon | MIKE | MIKE | | BFT | P | 3968552 |
TURNER CONSTRUCTION COMPANY | BFT | P | 04/15/2010 | ok for terracon to do inspection | BLAKE | BLAKE | | BFT | P | 3967632 |
WESTFIRE, INC | E= | C | 09/07/2010 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | E= | C | 4035530 |
LUDVIK ELECTRIC CO. | E= | C | 08/27/2010 | need gfi test results | MIKEC | MIKEC | | E= | C | 4031516 |
LUDVIK ELECTRIC CO. | E= | P | 08/26/2010 | panels 2nd floor | MIKEC | MIKEC | | E= | P | 4030748 |
LUDVIK ELECTRIC CO. | E= | P | 08/25/2010 | need to open up gear.energized before inspections | MIKEC | MIKEC | | E= | P | 4030158 |
LUDVIK ELECTRIC CO. | E= | P | 08/19/2010 | hallways and 2 mech rooms | MIKEC | MIKEC | | E= | P | 4027209 |
WESTFIRE, INC | ER | P | 08/06/2010 | FIRE ALARM INSPECTION: SEE PLANS | MIKEC | MIKEC | | ER | P | 4020984 |
WESTFIRE, INC | ER | P | 07/19/2010 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | ER | P | 4011641 |
LUDVIK ELECTRIC CO. | ER | P | 07/12/2010 | STORAGE OOM | MIKEC | MIKEC | | ER | P | 4008251 |
WESTFIRE, INC | ER | P | 07/06/2010 | FIRE ALARM INSPECTION: 2nd floor | MIKEC | MIKEC | | ER | P | 4005563 |
WESTFIRE, INC | ER | P | 06/30/2010 | FIRE ALARM INSPECTION: surface conduit lower level | MIKEC | MIKEC | | ER | P | 4003556 |
LUDVIK ELECTRIC CO. | ER | P | 06/16/2010 | QUESTIONS | MIKEC | MIKEC | | ER | P | 3996327 |
LUDVIK ELECTRIC CO. | ER | P | 05/25/2010 | SEE PLANS | MIKEC | MIKEC | | ER | P | 3986369 |
LUDVIK ELECTRIC CO. | ER | P | 05/20/2010 | ROOM 162 | MIKEC | MIKEC | | ER | P | 3984377 |
LUDVIK ELECTRIC CO. | ER | P | 05/13/2010 | WALLS SEE PLANS | MIKEC | MIKEC | | ER | P | 3981090 |
LUDVIK ELECTRIC CO. | EUG | C | 05/10/2010 | CONDUITS FROM GENERATOR | MIKEC | MIKEC | | EUG | C | 3979026 |
LUDVIK ELECTRIC CO. | ER | P | 05/07/2010 | WALLS SEE PLANS | MIKEC | MIKEC | | ER | P | 3978351 |
LUDVIK ELECTRIC CO. | EUG | P | 05/04/2010 | ug inspection not required for communication conduits | MATTHEW | MATTHEW | | EUG | P | 3976187 |
LUDVIK ELECTRIC CO. | ER | P | 05/04/2010 | walls marked on e113 and e114 | MATTHEW | MATTHEW | | ER | P | 3976184 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | C | 11/09/2010 | RECEIVED BALANCE REPORT, SENT TO SCANNING. | LYNNS | LYNNS | | H= | C | 4068665 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 08/26/2010 | 60# TEST ON HOT WATER SUPPLY AND RETURN OK. HWP FINAL. | LYNNS | LYNNS | | H= | P | 4030436 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 08/19/2010 | HVAC FINAL PENDING BALANCE REPORT. | LYNNS | LYNNS | | H= | P | 4026834 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 08/11/2010 | SEE SHEETS M-112 AND 115 FOR DUCT AND DATE. | LYNNS | LYNNS | | HD | P | 4023044 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HWP | P | 08/10/2010 | 62 LB TEST OK ON ALL CHILLED WATER PIPING IN BUILDING. HANGERS OK. | NANCY | NANCY | | HWP | P | 4022085 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HRR | P | 08/06/2010 | ROUGH DUCT ON PLENUMS ON SHHETS M112 AND 115 OK TO INSULATE. | LYNNS | LYNNS | | HRR | P | 4020663 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 08/03/2010 | ROUGH DUCT ON FRESH AIR PLENUM ON SHEET M-112 OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 4018776 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/28/2010 | ROUGH DUCT ON SHEET M-112 AND 114. SEE SHEET FOR DUCT AND DATE. | LYNNS | LYNNS | | HD | P | 4015867 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/26/2010 | ROUGH DUCT ON SHEET M-114. SEE SHEET FOR DATE AND DUCT. | LYNNS | LYNNS | | HD | P | 4014614 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/22/2010 | FIRE/SMOKE DAMPER FRAMING ON SHEET M-114 OK. SEE SHEET FOR DATE AND DAMPERS. | LYNNS | LYNNS | | HD | P | 4013220 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/21/2010 | ROUG DUCT ON SHEETS M-111 AND 112. SEE SHEETS FOR DATE AND DUCT. | LYNNS | LYNNS | | HD | P | 4012526 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/19/2010 | ROUGH DUCT ON SHEETS M-111,112 AND 114. SEE SHEETS FOR DATE AND DUCT. | LYNNS | LYNNS | | HD | P | 4011459 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/08/2010 | FIRE/SMOKE DAMPERS ON SHEET M112. SEE SHEET FOR DATE. | LYNNS | LYNNS | | HD | P | 4006399 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 07/06/2010 | PARTIAL HVAC FINAL ON SHEETS M-111 AND 112. SEE SHEETSW FOR DATE AND AREAS. | LYNNS | LYNNS | | H= | P | 4005187 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 07/06/2010 | ROUGH DUCT ON SHEET M-112. SEE SHEET FOR DATE. | LYNNS | LYNNS | | HD | P | 4005181 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/28/2010 | ROUGH DUCT ON SHEETS M-111,112 AND 115. SEE SHEET FOR DATE AND DUCT. | LYNNS | LYNNS | | HD | P | 4001659 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/23/2010 | SEE SHEET M-114 FOR FIRE/SMOKE DAMPER FRAMING AND ROUGH DUCT THIS DATE. | LYNNS | LYNNS | | HD | P | 3999539 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 06/21/2010 | PARTINA FINAL ON SHEETS M-112, 114 AND 115. | LYNNS | LYNNS | | H= | P | 3998233 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/21/2010 | ROUGH DUCT ON SHEET M-112, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3998230 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/17/2010 | SEE SHEETS M-111, 112 AND 114 FOR ROUGH DUCT AND FIRE/SMOKE DAMPERS ON THIS DATE. | LYNNS | LYNNS | | HD | P | 3996530 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/15/2010 | ROUGH DUCT AND FIRE/SMOKE DAMPERS OK. SEE SHEETS M-111 AND 112 FOR DATE AND DUCTS. | LYNNS | LYNNS | | HD | P | 3995225 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/04/2010 | FIRE/SMOKE DAMPERS ON SHEETS M-111, 112 AND 114. SEE SHEETS FOR DATE AND INSPECTION. | LYNNS | LYNNS | | HD | P | 3990506 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 06/03/2010 | ROUGH DUCT ON SHEETS M-111 AND 112, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3989776 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 05/26/2010 | FIRE/SMOKE DAMPER FRAMING ON SHEET M111 OK. ROUGH DUCT ON SHEETS: M112, 114 AND 115, OK TO INSULATE, FIRE/DAMPERS ON SHEET M112 OK. | LYNNS | LYNNS | | HD | P | 3986474 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 05/24/2010 | ROUGH DUCT, SEE SHEET M114 AND M115 FOR DATE AND DUCT. | LYNNS | LYNNS | | HD | P | 3985276 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 05/18/2010 | ROUGH DUCT ON SUPPLY SHEET M115, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3982548 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 05/10/2010 | SEE SHEETS M-114 FOR FIRE/SMOKE DAMPER FRAMING AND SHEETS M-111 AND 112 FOR ROUGH DUCT OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3978696 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 05/07/2010 | FIRE/SMOKE DAMPER FRAMING ON SHEETS M-111,112 AND 115 OK. | LYNNS | LYNNS | | HD | P | 3978129 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | P | 05/05/2010 | ROUGH DUCT IN POP A- ROOM 124, OK TO INSULATE. | LYNNS | LYNNS | | HD | P | 3976715 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | P= | C | 08/31/2010 | | LEE | LEE | | P= | C | 4032470 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PTO | P | 08/19/2010 | EAST MECH. ROOM VENTS OK | LEE | LEE | | PTO | P | 4027259 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PTO | P | 05/24/2010 | SPRINKLER ROOM VENT AND TRAP PRIMER O.K | JOEL | JOEL | | PTO | P | 3985253 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PTO | P | 05/12/2010 | 3-F.D I WEST MECH ROOM O.K, VENT AND TRAP PRIMER O.K | JOEL | JOEL | | PTO | P | 3979886 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PB | P | 05/04/2010 | F.D IN LOADING DOCK O.K | JOEL | JOEL | | PB | P | 3976052 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PB | P | 04/29/2010 | 2- DRAINS COLUMN K-J, 3- LINE & 2- DRAINS 5 TO 9 LINE COLUMN K-H | LEE | LEE | | PB | P | 3974030 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PB | R | 04/28/2010 | PROBLEMS AGAIN WITH VENTING, RE-INSP FEE NEXT TRIP OUT IF CORRECTIONS NOT MADE | LEE | LEE | | PB | R | 3973975 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | PB | P | 04/27/2010 | LOOKED AT FOUR FLOOR DRAINS, ALL HAVE HORIZ. DRY VENTS BELOW FLOOD RIMS, NOT ALLOWED PER CODE | LEE | LEE | | PB | P | 3973247 |