GREAT WEST CONSTRUCTION, LLC | B= | C | 06/06/2012 | All other required Final inspections are complete. (This is a computer generated result) | DANF | DANF | | B= | C | 4321774 |
GREAT WEST CONSTRUCTION, LLC | B= | P | 03/29/2012 | Additional Inspections Required: RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. building OK ; need heating finaled | DANF | DANF | | B= | P | 4289919 |
GREAT WEST CONSTRUCTION, LLC | BSP | C | 03/23/2012 | smoke partition OK | DANF | DANF | | BSP | C | 4287253 |
GREAT WEST CONSTRUCTION, LLC | BFR | C | 02/27/2012 | | DANF | DANF | | BFR | C | 4276083 |
GREAT WEST CONSTRUCTION, LLC | BFR | P | 02/24/2012 | bathroom framing OK; conference soffit cloud missing hanger wires and need dbl screws at stud to wire attachment ; soffit at entry need additional track to roof attachments | DANF | DANF | | BFR | P | 4275240 |
GREAT WEST CONSTRUCTION, LLC | BFR | P | 02/17/2012 | office walls OK pending other rough; still need framing at bathrooms and reception conference area | DANF | DANF | | BFR | P | 4273206 |
FOSTER ELECTRIC CORPORATION | E= | C | 03/29/2012 | fire rough permit pulled | MATTHEW | MATTHEW | | E= | C | 4289328 |
FOSTER ELECTRIC CORPORATION | E= | C | 03/29/2012 | FIRE ALARM INSPECTION: inspected 3-28-12 | MATTHEW | MATTHEW | | E= | C | 4289327 |
FOSTER ELECTRIC CORPORATION | E= | P | 03/28/2012 | need fire alarm permit | MATTHEW | MATTHEW | | E= | P | 4289098 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/23/2012 | fire alarm--above ceilings | GARYL | GARYL | | ER | P | 4287223 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/23/2012 | above ceilings | GARYL | GARYL | | ER | P | 4287221 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/28/2012 | rest of hard lids and installed missing mudring from previous inspection | GARYL | GARYL | | ER | P | 4276611 |
FOSTER ELECTRIC CORPORATION | ESL | C | 02/24/2012 | floor boxes ok-------- additional walls marked on plans ok | MATTHEW | MATTHEW | | ESL | C | 4275229 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/17/2012 | walls marked on plans | MATTHEW | MATTHEW | | ER | P | 4272971 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/06/2012 | NEW BALANCE REPORT RECEIVED. RTU 11 WITHIN 10%. MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 4321773 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/12/2012 | TEST AND BALANCE REPORT RECEIVED. NEED LETTER FROM ENGINEER ACKNOWLEDGING/APPROVING LOW CFM READINGS FOR EXISTING RTU11. REST OK. | NANCY | NANCY | | H= | P | 4295602 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/29/2012 | FINAL PENDING BALANCE REPORT. LEIBERT UNIT, DUCT AND REGISTERS OK. CONSDENSER UNIT OK. | LYNNS | LYNNS | | H= | P | 4289752 |
O.M.A.G.M., INC. | H= | C | 03/27/2012 | gas final | JON | JON | | H= | C | 4288261 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 03/23/2012 | ABOVE CEILING ALL OK, OK FOR TILES PER MECHANICAL ONLY. FOR FINAL NEED TO SEE LEIBERT, ROOF AND PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | C | 4287348 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/09/2012 | OK TO WRAP NEW DUCT | JIMV | JIMV | | HD | P | 4280922 |
O.M.A.G.M., INC. | HC | C | 02/17/2012 | OK TO SET 2 LB METER FOR UNIT 150. FYI: METER STUB IS ON EAST SIDE OF BUILDING BEHIND THE TREES. | NANCY | NANCY | | HC | C | 4272858 |
O.M.A.G.M., INC. | HI | C | 02/17/2012 | 10 LB TEST OK. INSTALLED AS PER PRINTS. FOR FINAL HAVE ADDRESS TAG STAMPED AS 2 LB SYSTEM, WEATHER PROTECT REGULATORS AND HOOK UP ALL ROOF TOP UNITS. | NANCY | NANCY | | HI | C | 4272851 |
HOGAN MECHANICAL, INC. | P= | C | 03/29/2012 | | LEE | LEE | | P= | C | 4289411 |
HOGAN MECHANICAL, INC. | PTO | C | 02/24/2012 | CHECK HAMMER ARRESTORS X-2 AT FINAL (D/W AND ICE-BOX) | LEE | LEE | | PTO | C | 4275426 |
HOGAN MECHANICAL, INC. | PB | C | 02/15/2012 | | LEE | LEE | | PB | C | 4272134 |