BISON BUILDERS & ASSOCIATES, INC. | B= | C | 03/31/2015 | All other required Final inspections are complete. (This is a computer generated result) | DALE | DALE | | B= | C | 4926521 |
BISON BUILDERS & ASSOCIATES, INC. | B= | P | 03/05/2015 | need permenant address at street / permenant front stairs / return handrails to wall / tape edges on plastic at crawl space | DALE | DALE | | B= | P | 4912111 |
BISON BUILDERS & ASSOCIATES, INC. | BLA | C | 01/26/2015 | | DALE | DALE | | BLA | C | 4890512 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | C | 12/29/2014 | | DALE | DALE | | BFR | C | 4878480 |
BISON BUILDERS & ASSOCIATES, INC. | BIN | C | 12/29/2014 | | DALE | DALE | | BIN | C | 4878477 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | T | 12/26/2014 | PAID (REC#1238910) 3" oc on studs and 3" grid pattern on header for narrow wall not done / draft stop on wall by B vent not done / install roof jacks for plumbing vents | BOBF | BOBF | | BFR | T | 4878059 |
BISON BUILDERS & ASSOCIATES, INC. | BIN | R | 12/26/2014 | not complete on main level / rim joists in basement not completed, some with batt, some need blown in | BOBF | BOBF | | BIN | R | 4878053 |
BISON BUILDERS & ASSOCIATES, INC. | BSP | C | 12/22/2014 | rear deck piers OK | DAN | DAN | | BSP | C | 4877959 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | P | 12/22/2014 | OK to insulate; 1) narrow braced walls at garage need nailing and strap installed 2) restraint ends of lateral bracing 3) roll block end trusses above dining area and master bedroom at deck 4) missing crush block under dining header, entry door, and master bedroom headers 5) isolate t-posts from slab 6) missing beam at rear master deck for truss ends | DAN | DAN | | BFR | P | 4876700 |
BISON BUILDERS & ASSOCIATES, INC. | BFI | C | 09/23/2014 | | DALE | DALE | | BFI | C | 4821160 |
BISON BUILDERS & ASSOCIATES, INC. | BFD | C | 09/23/2014 | | DALE | DALE | | BFD | C | 4821150 |
BISON BUILDERS & ASSOCIATES, INC. | BFN | C | 09/18/2014 | all paperwork on file / float / ufer in | DALE | DALE | | BFN | C | 4818874 |
BISON BUILDERS & ASSOCIATES, INC. | BFT | C | 09/09/2014 | including interior pads | DALE | DALE | | BFT | C | 4812424 |
DILLER ELECTRIC LLC | E= | C | 03/03/2015 | a/c per wire in unfinished basement | CRAIG | CRAIG | | E= | C | 4911084 |
DILLER ELECTRIC LLC | E= | R | 03/02/2015 | not ready | MATTHEW | MATTHEW | | E= | R | 4910466 |
DILLER ELECTRIC LLC | E= | L | 02/27/2015 | canceled at time of call ahead | MATTHEW | MATTHEW | | E= | L | 4909860 |
DILLER ELECTRIC LLC | ER | C | 12/26/2014 | 8/3 nmb ran for well | TOMC | TOMC | | ER | C | 4878126 |
DILLER ELECTRIC LLC | ES | C | 12/23/2014 | Residential Overhead: 200 amp 3/w: new res---- meter is set; need seal | MATTHEW | MATTHEW | | ES | C | 4877326 |
DILLER ELECTRIC LLC | ES | R | 12/22/2014 | bond LB, install bushings on risers, land service lateral in meter can | MATTHEW | MATTHEW | | ES | R | 4876455 |
DILLER ELECTRIC LLC | EUG | C | 12/19/2014 | service lat from pole to home | MATTHEW | MATTHEW | | EUG | C | 4875669 |
DILLER ELECTRIC LLC | ER | R | 12/18/2014 | need well wire installed------- unfinished basement, #6al to cooking in insulation | MATTHEW | MATTHEW | | ER | R | 4874745 |
BROWN'S HEATING & COOLING, INC | H= | C | 02/27/2015 | unfinished basement (framing only), no a/c (rough only), performance test to scanning | TED | TED | | H= | C | 4909538 |
J & J MECHANICAL, INC | HC | C | 12/22/2014 | RELEASE METER | TED | TED | | HC | C | 4876145 |
J & J MECHANICAL, INC | HO | C | 12/22/2014 | 10lb test on 2'' p.e. line from meter at road to house (no 2lb system needed, house piping sized for meter at road) | TED | TED | | HO | C | 4876138 |
BROWN'S HEATING & COOLING, INC | HRR | C | 12/18/2014 | by final need performance test | TED | TED | | HRR | C | 4874294 |
J & J MECHANICAL, INC | HI | C | 12/17/2014 | 1 1/4'' furnace, w/h, range | TED | TED | | HI | C | 4873539 |
BROWN'S HEATING & COOLING, INC | HRR | R | 12/17/2014 | need 2nd bath fan and vent in master bathroom over tub/shower area, need basement return, need performance test, note: unfinished basement, a/c rough, outside air to return, conditioned crawlspace | TED | TED | | HRR | R | 4873534 |
BROWN'S HEATING & COOLING, INC | HRR | R | 12/16/2014 | Unable to locate plans. Need to place plans on equipment or with permit card.
| MARK | MARK | | HRR | R | 4872499 |
JOLLY PLUMBING & HEATING INC. | P= | C | 03/05/2015 | correction made | TED | TED | | P= | C | 4911695 |
JOLLY PLUMBING & HEATING INC. | P= | P | 03/02/2015 | CORRECTIONS MADE , POTABLE WATER CERT TO SCANNING | GABE | GABE | | P= | P | 4910524 |
JOLLY PLUMBING & HEATING INC. | P= | R | 02/27/2015 | remove test plugs on vent outlets above roof, need to complete master bathroom shower tile work for test, need certificate of potable water, note: unfinished basement (framing only), 3/4'' pvb installed | TED | TED | | P= | R | 4909537 |
HOMEOWNER | PWO | C | 01/30/2015 | need certificate of potable water by final | TED | TED | | PWO | C | 4893786 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 12/19/2014 | CORRECTIONS MADE , POTABLE WATER CERT BY FINAL | GABE | GABE | | PTO | C | 4875280 |
JOLLY PLUMBING & HEATING INC. | PTO | P | 12/17/2014 | LOW TEST AT POWDER DWV , NEED VALVES FOR WALL MOUNTED FAUCETS , NEED WATERLINE FROM WELL INSPECTED (PWO) . POTABLE WATER CERT BY FINAL . NOTE : UNFINISHED BASEMENT , IRRIGATION STUB | GABE | GABE | | PTO | P | 4873360 |
JOLLY PLUMBING & HEATING INC. | PB | C | 10/14/2014 | no water under slab | TED | TED | | PB | C | 4834208 |