GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 03/10/2016 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 5151818 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 03/02/2016 | PAID (REC#1315975) PLAN SPLICE FEE: $50 by: JIMA for Construction: splice changed wall types at shaft | JIMA | JIMA | | BSP | T | 5146130 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 03/01/2016 | | BERTW | BERTW | | BFR | C | 5145044 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/01/2016 | detail for shaft construction on file. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), MECH ONE, INC. Mechanical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 5145042 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/08/2016 | shaft liner corebaord ok 4th floor | BERTW | BERTW | | BFR | P | 5130092 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/03/2016 | Shaftliner assembly OK at 3rd and 5th floors / 4th floor to be inspected after damper framing has been verified by mech inspector. | JEREMYA | JEREMYA | | BSP | P | 5127393 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/29/2016 | only inspected the system layers of sheetrock on the side and back wall of shaft through 3rd,4th,floors 5th floors. Need revised design for firebarrier to be built on floors and how to support enclosure at bottom of shaft not on plans/need damper framing and added damper possibly @ branch duct line below 5th floor/need all mech inspections | BERTW | BERTW | | BSP | P | 5126525 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/19/2016 | smoke barrier through penetrations firecaulked ok above ceiling 7th floor | BERTW | BERTW | | BSP | P | 5118420 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/04/2016 | Above ceiling penetrations at 4th floor rated assemblies OK in all but Med Room 4351. Will need to reinspect this room / 7th floor not ready | JEREMYA | JEREMYA | | BFR | P | 5108917 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/23/2015 | 4th and 7th floor smoke barrier electric boxes putty packed ok/need to get dampers inspected and mech contractor attached to permit/room # 4538 is storage room needs framing completed for fire barriers and dampers inspected | BERTW | BERTW | | BSP | P | 5085148 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 03/09/2016 | FIRE ALARM INSPECTION: Red FA card signed off by Craig S. | DEAN | DEAN | | E= | C | 5150856 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 02/23/2016 | 4th and 7th floor nurses station and panels | CRAIGS | CRAIGS | | E= | C | 5139888 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 02/16/2016 | 7th floor patient care rooms OK | CRAIGS | CRAIGS | | E= | P | 5134300 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 02/12/2016 | 4th floor patient rooms OK | CRAIGS | CRAIGS | | E= | P | 5133285 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/05/2016 | FIRE ALARM INSPECTION: F/A above ceiling in the hall ways OK | CRAIGS | CRAIGS | | ER | P | 5128867 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/05/2016 | above ceiling in the halls | CRAIGS | CRAIGS | | ER | P | 5128860 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/19/2016 | 4th floor head walls and above ceiling -------- see approved drawings | CRAIGS | CRAIGS | | ER | P | 5117967 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/19/2016 | FIRE ALARM INSPECTION: 4th floor ------ see approved drawings | CRAIGS | CRAIGS | | ER | P | 5117966 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/13/2016 | FIRE ALARM INSPECTION: above ceiling , see approved drawings | CRAIGS | CRAIGS | | ER | P | 5115206 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/13/2016 | above ceiling see approved drawings | CRAIGS | CRAIGS | | ER | P | 5115202 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/07/2016 | FIRE ALARM INSPECTION: high lighted in red | CRAIGS | CRAIGS | | ER | P | 5111845 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 01/07/2016 | high lighted in red | CRAIGS | CRAIGS | | ER | P | 5111844 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/30/2015 | 4th and 7th floor head walls ----OK | CRAIGS | CRAIGS | | ER | P | 5107501 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/17/2015 | high lighted in pink , see approve drawings | CRAIGS | CRAIGS | | ER | P | 5100574 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/15/2015 | 4th and 7th floor bathroom hard lids - see plans | CRAIGS | CRAIGS | | ER | P | 5098906 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/11/2015 | 4th and 7th door holders OK ----- 4th floor 7 trauma room east | CRAIGS | CRAIGS | | ER | P | 5096813 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/08/2015 | BATH ROOM HARD LID--4TH AND 6TH SEE LIGHTING PLANS | BRIAN | BRIAN | | ER | P | 5093916 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/30/2015 | 4th and 7th floor north 6 rooms walls OK------ see approved plans | CRAIGS | CRAIGS | | ER | P | 5088042 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/24/2015 | 4 th and 7 th floor south and west walls see plans for locations. | BRET | BRET | | ER | P | 5086359 |
MECHONE, INC. | H= | C | 03/10/2016 | G.C WILL EMAIL REVISED TAB OR ENGINEER LETTER ON 3/11 | JERRYF | JERRYF | | H= | C | 5151817 |
MECHONE, INC. | H= | P | 03/09/2016 | TAB REPORT RECEIVED / SEVERAL READINGS OUTSIDE +/- 10% - NEED REVISED TAB REPORT OR LETTER FROM ENGINEER APPROVING THIS TAB REPORT | JERRYF | JERRYF | | H= | P | 5150775 |
MECHONE, INC. | H= | P | 03/09/2016 | PARTIAL PENDING TAB REPORT - REST OK | JERRYF | JERRYF | | H= | P | 5150768 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 02/29/2016 | PIPING FOR 2 FAN COILS AND DRAINS | JON | JON | | H= | C | 5144636 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/23/2016 | OK FOR INSULATION SEE AGAIN AT FINAL AT 4TH AND 7TH FLOOR. | JON | JON | | HWP | P | 5140355 |
MECHONE, INC. | HD | P | 02/16/2016 | 4TH FLOOR EXHAUST F/SD DAMPER ACCESS AND RETAINAGE OK | JERRYF | JERRYF | | HD | P | 5134350 |
MECHONE, INC. | HD | P | 02/04/2016 | 4TH FLOOR EXHAUST F/SD FRAMING AND DAMPER OK - NEED TO VERIFY RETAINAGE | JERRYF | JERRYF | | HD | P | 5128250 |
MECHONE, INC. | H= | L | 01/28/2016 | CANCELED AT CALL AHEAD | JERRYF | JERRYF | | H= | L | 5125317 |
MECHONE, INC. | H= | P | 01/22/2016 | PARTIAL PENDING TAB REPORT - 4TH AND 7TH FLOORS ABOVE CEILING OK - ALL SA/RA / EXHAUST AND TRANSFER GRILLES COMPLETE - ALL F/SD DAMPER RETAINAGE AND DUCT ACCESS DOORS COMPLETE | JERRYF | JERRYF | | H= | P | 5121675 |
MECHONE, INC. | HD | P | 01/14/2016 | NEED THE FOLLOWING ON 4TH FLOOR - FIRE TAPE DAMPER OPENING BOTH SIDES OF WALL AT EAST CORRIDOR - 4TH AND 7TH FLOORS VERIFY ALL DUCT ACCESS DOORS | JERRYF | JERRYF | | HD | P | 5116292 |
MECHONE, INC. | HD | P | 01/04/2016 | NEED THE FOLLOWING TO COMPLETE F/SD ON 4TH AND 7TH FLOORS - 7TH FLOOR - NEED 2 F/SD FRAMING AND INSTALL AT 2 LIVE CONNECTIONS / F/SD SHEET ROCK COMPLETED AT REHAB GYM / COMPLETE SCREWS AT LARGE DAMPER AT CORRIDOR AND ALL ACCESS DOORS - 4TH FLOOR - SHEET ROCK COMPLETED AT EAST CORRIDORS X 2 / ALL ACCESS DOORS - ALL DUCT CONNECTIONS AT BOTH FLOORS | JERRYF | JERRYF | | HD | P | 5109264 |
MECHONE, INC. | HD | P | 12/31/2015 | 2 F/SD DAMPER FRAMING OK AT REHAB GYM ON 7TH FLOOR OK | JERRYF | JERRYF | | HD | P | 5108227 |
MECHONE, INC. | HD | P | 12/17/2015 | ALL F/SD FRAMING OK ON 7TH FLOOR - STILL NEED ALL DAMPERS AND RETAINAGE COMPLETED | JERRYF | JERRYF | | HD | P | 5100912 |
MECHONE, INC. | HD | P | 12/15/2015 | NEED BOTTOM TRACK TO EXTEND FROM KING STUD TO KING STUD AT CORRIDOR DOOR OPENING ON 7TH FLOOR - REST OK | JERRYF | JERRYF | | HD | P | 5099042 |
MECHONE, INC. | HD | P | 12/09/2015 | NEED 6 F/SD FRAMING ON 7TH FLOOR - REST OK -ALL F/SD FRAMING COMPLETED ON 4TH FLOOR - STILL NEED TO VERIFY GAP ON ALL DAMPERS THROUGH OUT | JERRYF | JERRYF | | HD | P | 5095157 |
MECHONE, INC. | H16 | C | 12/07/2015 | CHANGED INSPECTION TO CONSULT NEED SEVERAL DAMPERS REFRAMED TALKED TO CRAIG AND HE WILL CALL INSPECTION WHEN ALL DAMPERS ARE READY | JERRYF | JERRYF | | H16 | C | 5093440 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 02/17/2016 | 4th and 7th floors complete | TED | TED | | P= | C | 5135758 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 12/15/2015 | 4th floor rooms 4534, 4536, 4540 ok, 7th floor rooms 7534 - 7540 ok. | TAYLOR | TAYLOR | | PTO | C | 5098889 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/03/2015 | 4th floor rooms 4520 - 4532 ok, 7th floor rooms 7520 -7532 ok. | TAYLOR | TAYLOR | | PTO | P | 5090835 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/24/2015 | 4th floor rooms 4502 - 4518 ok, 7th floor rooms 7502 - 7518 ok, see plans. | TAYLOR | TAYLOR | | PTO | P | 5086261 |