INK CONSTRUCTION LLC | B= | C | 04/07/2016 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 5171925 |
INK CONSTRUCTION LLC | B= | P | 04/04/2016 | thumb turn locks at both restrooms removed / weld letter received / pending other final inspections. Additional Inspections Required (computer generated): 5 STAR ELECTRIC, LLC Electrical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 5168939 |
INK CONSTRUCTION LLC | B= | P | 04/01/2016 | Temp CO: pending building and electrical finals ( Expires: 5/1/2016 12:00:00 AM) | MINDY | MINDY | | B= | P | 5168375 |
INK CONSTRUCTION LLC | BSP | T | 04/01/2016 | PAID (REC#1321713) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 4-1-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5168155 |
INK CONSTRUCTION LLC | B= | P | 04/01/2016 | corrections from previous inspection still incomplete / need to remove thumb turn locks at both restrooms and need letter for welds at RTU to complete the frame inspection / need to complete other final inspections -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 5167991 |
REFRIGERATION PLUS, LLC | BSP | P | 04/01/2016 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: revised to plenum return / wrap all PVC in plenum | DALEH | DALEH | | BSP | P | 5167634 |
INK CONSTRUCTION LLC | B= | P | 03/30/2016 | need to complete other final inspections / need to remove thumb turn locks at both accessible restrooms / need letter for welds at RTU to complete the frame inspection -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, 5 STAR ELECTRIC, LLC Electrical Final Inspection is not Completed yet, NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet, REFRIGERATION PLUS, LLC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 5165968 |
INK CONSTRUCTION LLC | BFR | P | 02/24/2016 | still need to inspect east wall framing in womens restroom / all other light gauge steel framing okay / still need letter for welds at RTU / letter for framing modifications at the CMU wall in cooler area received / pending MEP inspections | BRIANB | BRIANB | | BFR | P | 5141096 |
INK CONSTRUCTION LLC | BFR | P | 02/22/2016 | PARTIAL ONLY / RTU- pending letter for welds at RTU / light gauge steel framing at low walls in dining area okay only - no MEPs in low walls at dining area / need letter for framing modifications at CMU wall at cooler area / need to attach mechanical to permit and need to complete other rough inspections / reviewed accessible elements with site rep Deb / note: verified pizza oven not on exterior | BRIANB | BRIANB | | BFR | P | 5139272 |
5 STAR ELECTRIC, LLC | E= | C | 04/07/2016 | | CRAIGS | CRAIGS | | E= | C | 5171923 |
5 STAR ELECTRIC, LLC | E= | R | 04/06/2016 | use correct breaker lock system --- cat 5 cable in plenum ceiling OK | CRAIGS | CRAIGS | | E= | R | 5171008 |
5 STAR ELECTRIC, LLC | E= | P | 04/04/2016 | need a breaker lock that stays on the breaker --- ko seal 4 square box above the wall between food prep and sales counter -------- verify cat 5 cable to make sure it plenum rated -------cooler corrections completed | CRAIGS | CRAIGS | | E= | P | 5168657 |
5 STAR ELECTRIC, LLC | E= | P | 04/01/2016 | make same correction as noted on inspection on march 30 th --- also need to inspect above drop ceiling as it was changed to plenum rated | CRAIGS | CRAIGS | | E= | P | 5168265 |
5 STAR ELECTRIC, LLC | E= | R | 03/30/2016 | ground rtu disconnects properly ---- gfci protection for receptacles 6' from the sink back by the walk in cooler ----need paper work for walk-in cooler for max over current protection --- needa breaker lock for the mixer | CRAIGS | CRAIGS | | E= | R | 5165693 |
5 STAR ELECTRIC, LLC | ER | P | 03/07/2016 | panel wall OK | CRAIGS | CRAIGS | | ER | P | 5148916 |
5 STAR ELECTRIC, LLC | EUG | C | 02/26/2016 | feeder conduits OK | CRAIGS | CRAIGS | | EUG | C | 5143619 |
5 STAR ELECTRIC, LLC | ER | P | 02/24/2016 | interior walls --------OK | CRAIGS | CRAIGS | | ER | P | 5143247 |
5 STAR ELECTRIC, LLC | ER | P | 02/19/2016 | outside walls only ----- water heater OK to be up at the water heater | CRAIGS | CRAIGS | | ER | P | 5143246 |
REFRIGERATION PLUS, LLC | H= | C | 04/01/2016 | ALL OK ALL DRAINS COMPLETE - NO ALARMS REQUIRED | JERRYF | JERRYF | | H= | C | 5168297 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 04/01/2016 | PLAN REVISION COMPLETE | JERRYF | JERRYF | | H= | C | 5167426 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 03/30/2016 | LETTER FROM PLENUM RETURN RECEIVED STILL NEED PLAN REVISED SHOWING PLENUM RETURN | JERRYF | JERRYF | | H= | P | 5165348 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 03/28/2016 | NEED HD NOTES COMPLETED NOTES TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 5164202 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 03/28/2016 | NEED TRANSFER AIR AND RETURN AIR IN KITCHEN AREA COMPLETED OR REVISE PLAN TO PLENUM RETURN AND PROTECT ALL PVC TO 25/50 FLAME SPREAD | JERRYF | JERRYF | | HD | P | 5164161 |
DRUMMOND PLUMBING LLC | H= | C | 03/18/2016 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5157920 |
DRUMMOND PLUMBING LLC | H= | P | 03/16/2016 | NEED REFRIGERATION CONTRACTOR ATTACHED TO PERMIT. PROPERLY SUPPORT GAS LINES, MUST USE PRESSURE TREATED OR REDWOOD ON ROOF. REST OK. | NANCY | NANCY | | H= | P | 5156443 |
DRUMMOND PLUMBING LLC | HC | C | 02/26/2016 | RELEASE METER | JON | JON | | HC | C | 5143597 |
DRUMMOND PLUMBING LLC | HI | C | 02/26/2016 | GAS TO PLANS. NEED CONNECTIONS TO UNITS AND PROPER GAS LINE SUPPORTS BY HVAC FINAL. | JON | JON | | HI | C | 5143595 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 02/26/2016 | HARD LIDS OK ONLY | JON | JON | | HD | P | 5143591 |
DRUMMOND PLUMBING LLC | P= | C | 03/29/2016 | correction made | TED | TED | | P= | C | 5164427 |
DRUMMOND PLUMBING LLC | P= | P | 03/24/2016 | need back flow protection on water to ice maker, rest ok | TED | TED | | P= | P | 5161393 |
DRUMMOND PLUMBING LLC | P= | P | 03/23/2016 | field cancel | TED | TED | | P= | P | 5160843 |
DRUMMOND PLUMBING LLC | PTO | C | 02/16/2016 | to plan | TED | TED | | PTO | C | 5134543 |
DRUMMOND PLUMBING LLC | PB | C | 01/27/2016 | to plan | TED | TED | | PB | C | 5124086 |