GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 12/29/2016 | State plumbing and electrical finals completed ( Paper work on file ) / Guard and hand rail OK | NICK | NICK | | B= | C | 5379438 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/19/2016 | Temp CO: to occupy and move in ( Expires: 1/18/2017 12:00:00 AM) | REBECCA | REBECCA | | B= | P | 5371085 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/16/2016 | Tempered glass south door OK. Items in building OK. North egress ramp has temporary guard rail and handrail installed. Need state plumbing final completed, have partial. Need mechanical completed. Have partial. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 5370877 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/14/2016 | Astricals at 90 minute doors installed. Walked roof for "C" and "D" OK. Colorado State Electrical final inspection completed and on file. Colorado State Plumbing, partial pending back flow and several items. Need PPRBD mechanical finaled have partial. Missing glass in building "C" south doors. Missing guard rail and handrail north side ramp. OK to installed temper guard rail and rail. West and south exit pedestrian protection removed. OK to move in desks and chairs.
| DAN | DAN | | BSP | P | 5368365 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/08/2016 | Ramps slope, hand rails and landing OK. Missing astricals at 90 min doors. Contractor will provide state final inspections reports for Electrical and Plumbing. Kiln canopy framing OK. | DAN | DAN | | BSP | P | 5363326 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/28/2016 | walked with Kellen, reviewed bathrooms accessible requirements. Classroom hardware. | DAN | DAN | | BSP | P | 5354188 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | C | 11/28/2016 | | DAN | DAN | | BLA | C | 5353245 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/21/2016 | Fire wall between building "E" and "D" OK. Bathroom work still in progress. Will need certificate of final inspection from state for electrical and plumbing inspections for buildings "C" and "D". | DAN | DAN | | BSP | P | 5350722 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/17/2016 | 2 hr wall label completed. Single person bathrooms #145 and #144 lav center drain not centered at 15". Bath partitions and sink tops being installed. | DAN | DAN | | BSP | P | 5347573 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 11/16/2016 | Cancelled in field per Kellen, not ready. | DAN | DAN | | BSP | R | 5346451 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 11/08/2016 | Kumar and Associates engineering letter on file from Duane Craft, #37553 for the structural steel and light gauge steel for compliance to the approved plans. | DAN | DAN | | BFR | C | 5338891 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | C | 11/08/2016 | Engineer letter on file from Kumar and Associates, Duane Craft, #37553, for Buildings "C" and "D", to include; Sub-grade, foundation reinforcement steel, and concrete for compliance to approved plans. | DAN | DAN | | BFN | C | 5338874 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 11/07/2016 | Building "B" west side of building north side. | DAN | DAN | | BLA | P | 5338352 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 11/04/2016 | Lath complete C West and North | BERTW | BERTW | | BLA | P | 5336462 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 11/03/2016 | R-19 insulation for pent house walls OK | NICK | NICK | | BIN | P | 5335996 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 10/26/2016 | grid C6, lines CA through BE north end of building "D". Insulation completed but still need enginee's letter for compliance to approved plans for foundation and structural steel. | DAN | DAN | | BFI | P | 5328665 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/26/2016 | Grid D11, lines DA through DD | DAN | DAN | | BLA | P | 5328658 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/24/2016 | West wall of building "D" and south wall at Link OK. | DAN | DAN | | BIN | P | 5326329 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/21/2016 | RTU roof penthouse for building "C" OK. | DAN | DAN | | BLA | P | 5325416 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/20/2016 | Building "C" west exterior wall; grid D-A, D4 through D10. | DAN | DAN | | BIN | P | 5323490 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/20/2016 | West wall of building "C" at grid D-A, lines D-5 through D-10. | DAN | DAN | | BLA | P | 5323481 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/18/2016 | south side of building "C", grid D-D through D-1 through DE OK. Talked with Rob regarding Kumar letter for foundation observation and structural observation. He indicated engineer was on vacation and would send letter when he returned. | DAN | DAN | | BLA | P | 5320960 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/18/2016 | IT room #D130 exterior wall. | DAN | DAN | | BIN | P | 5320952 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/17/2016 | bathroom ceiling framing; Rooms D-144 through D-149 hard lid framing OK | DAN | DAN | | BFR | P | 5320558 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/17/2016 | east wall hall way of Building "D" OK. grid line D-D | DAN | DAN | | BIN | P | 5320550 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/14/2016 | Inspection of roof insulation on Building "C". 6" Iso-guard insulation for R30 and 1/2" Densdeck. Prescriptive method. | DAN | DAN | | BIN | P | 5319643 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/14/2016 | exterior wall insulation for rooms D136, D131, and D135. R19 Per comcheck. | DAN | DAN | | BIN | P | 5319642 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/13/2016 | Building "C" class room and office framing. Wall types PE, PF. And full wall height around mechanical room type PH. Room numbers C100 through C120. | DAN | DAN | | BFR | P | 5317680 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/12/2016 | exterior wall insulation for bathrooms south of D2 line OK. | DAN | DAN | | BIN | P | 5317312 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/12/2016 | lath south wall of building "C" OK. Still need to see class room framing in "C". | DAN | DAN | | BLA | P | 5317236 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/12/2016 | 2hr fire wall top of wall clips and fire stop OK at "D2" line. Through penetrations protected OK | DAN | DAN | | BFR | P | 5317234 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/11/2016 | Walked with Ben, superintend; clips top of 2 hr fire wall OK. Provide UL listing for through penetration. Recall. Pre Ben, Kumar is still to provide letter for foundation and structural steel, welding and bolting. | DAN | DAN | | BSP | P | 5315259 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/04/2016 | Penthouse framing. Need letter to revise hold downs to a weld to the deck angle. Also letter for steel to header off added fresh air openings on east side. Per Kellen will have foundation and structural letter next week for areas D and C. Reviewed 2hr fire wall with dry wall foreman Clips on south wall at top and at 10' OK. Still need north side completed. | DAN | DAN | | BFR | P | 5309403 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/03/2016 | East side of building "D". Grid DD, lines D-1 through D-11 OK. | DAN | DAN | | BLA | P | 5309184 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/03/2016 | Fire wall at "D" extended to exterior walls. Still missing clips at roof and south side. Need listings for penetrations. | DAN | DAN | | BFR | P | 5309183 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/27/2016 | Area "D" office wall framing. Wall types PK and PF. grid D11 to D3.5 and lines DA through CD.5. Numerous top of walls where kicker exceed 4'oc and not alternating sides. Recall. Rooms #102 through #130. | DAN | DAN | | BFR | P | 5303423 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/26/2016 | roof insulation 6" of ISO-guard being installed, equals R30 and complies with IECC. | DAN | DAN | | BSP | P | 5302988 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/20/2016 | Met with Jason, Advantage foreman, Fire all at Area "E" and area "D"; went over detail UL U336, BXUV.U336 for shaft wall at exterior wall and the 1hr 10' beyond. Also roof termination with "J" runner at roof deck with fire stop. Installation of break way clips on south side of wall. Wall framing rooms D131, D132, D129 and D130 wall types PH, PG, and PO. North wall D142. | DAN | DAN | | BFR | P | 5297570 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/19/2016 | MGA engineering to provide letter for fix on east exterior wall studs at missing window king studs. Hallway wall framing type PH and PG D/C.5 line OK pending door jambs and door offset framing. Extend shaft liner wall to exterior wall at west end. Install break away clips at south side of wall. Recall when framing and door jambs installed in hallway. | DAN | DAN | | BFR | P | 5297053 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/16/2016 | Shaft wall at line . still need installed at hall way and protect penetrations. Using section 706.6 of vertical continuity exception #3, for type 2/B building to terminate wall at roof decking. | DAN | DAN | | BFR | P | 5295736 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/06/2016 | Training with Bert at Cheyenne Mountain High school. Areas "C"; and "D". Type 2/B building. Reviewed key elements; Firewall, exterior wall framing. Foundation and structural steel letter to be provided to PPRBD when completed. Reviewed labeling requirements for use of wood in Type 2/B buildings as per section 1703. Also reviewed section 1109 regarding when an ambulatory accessible compartment is required and compliance to ICC A117.1. | DAN | DAN | | BSP | P | 5285541 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/06/2016 | training with Inspector Dan on E occupancies | BERTW | BERTW | | BSP | P | 5285476 |
US ENGINEERING COMPANY | H= | C | 12/22/2016 | TEST AND BALANCE REPORT OK. HEAT FINAL COMPLETE.. | LUKE | LUKE | | H= | C | 5374389 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 12/22/2016 | TEST AND BALANCE REPORT OK.. HEAT FINAL COMPLETE.. | LUKE | LUKE | | H= | C | 5374388 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 12/13/2016 | HEAT FINAL OK PENDING TEST AND BALANCE REPORT.. | LUKE | LUKE | | H= | P | 5366232 |
US ENGINEERING COMPANY | H= | P | 12/01/2016 | HEAT FINAL OK FOR ID NUMBER 1513 (PENDING TEST AND BALANCE REPORT) | LUKE | LUKE | | H= | P | 5357571 |
US ENGINEERING COMPANY | HD | P | 11/18/2016 | ABOVE CEILING BUILDING (C) AND BUILDING (D) ALL FLEX AND DIFFUSERS ARE INSTALLED. NOTE: FOR FINAL NEED TEST AND BALANCE REPORT, FINAL ROOF INSPECTION AND SMOKE DETECTORS IF REQUIRED.. | LUKE | LUKE | | HD | P | 5348158 |
US ENGINEERING COMPANY | HRP | C | 11/16/2016 | 400 LB AIR TEST GOOD ON ALL THEE LINE SETS BUILDING (C) AND BUILDING (D) JUST NEED TO SEE FINAL CONNECTIONS AND ROOF.. | LUKE | LUKE | | HRP | C | 5345772 |
US ENGINEERING COMPANY | HD | P | 11/15/2016 | ABOVE CEILING OK (C) BUILDING. | LUKE | LUKE | | HD | P | 5344304 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 11/07/2016 | FINAL OK BUILDING (C) AND BUILDING (D) UNDER WORKING PRESSURE. JUST NEED TEST AND BALANCE REPORT AND US ENGINEERING FINAL.. | LUKE | LUKE | | H= | P | 5337524 |
US ENGINEERING COMPANY | HV | P | 11/01/2016 | BUILDING (C) AND (D) ROUGH OK JUST NEED TO START CALLING FINALS AHU-6 AND AHU-7 OK. | LUKE | LUKE | | HV | P | 5332759 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/17/2016 | AIR TEST GOOD ON HOT AND CHILLED WATER PIPING OK TO WRAP RAN PER PLANS. NOTE: NEED TO STILL SEE FINAL CONNECTIONS BUILDING (C) | LUKE | LUKE | | HWP | P | 5319796 |
US ENGINEERING COMPANY | HD | P | 10/12/2016 | BUILDING (C) ROUGH DUCT OK. GOOD TO WRAP STILL NEED TO SEE ROOF. | LUKE | LUKE | | HD | P | 5316439 |
US ENGINEERING COMPANY | HD | P | 10/03/2016 | BUILDING (D) ALL ROUGH DUCT OK GOOD TO WRAP STILL NEED TO SEE ROOF.. | LUKE | LUKE | | HD | P | 5308179 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 09/29/2016 | AIR TEST GOOD FOR HOT AND CHILLED WATER PIPING RAN PER PLANS OK TO WRAP. NOTE: STILL NEED TO SEE CONNECTIONS ON ROOF. | LUKE | LUKE | | HWP | P | 5305680 |