DUSTON CONSTRUCTION INC | B= | C | 07/05/2017 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5554749 |
DUSTON CONSTRUCTION INC | B= | P | 06/30/2017 | . Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | NATHAN | NATHAN | | B= | P | 5552038 |
DUSTON CONSTRUCTION INC | BFR | C | 06/30/2017 | stamped observation letter for SFRM patch on file. plans revised. | NATHAN | NATHAN | | BFR | C | 5551812 |
DUSTON CONSTRUCTION INC | BFR | P | 06/12/2017 | After review of UL ER report for fireproofing material. An engineer inspection letter will need to be provided for type, thickness, and application of Cafco Fiber-patch at bottom side of roof deck around penetrations. | NATHAN | NATHAN | | BFR | P | 5531872 |
DUSTON CONSTRUCTION INC | BSP | P | 06/09/2017 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revise WH breaker | SHELBY | SHELBY | | BSP | P | 5531456 |
DUSTON CONSTRUCTION INC | BSP | T | 06/09/2017 | PAID (REC#1430983) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 6-9-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5531325 |
DUSTON CONSTRUCTION INC | BFR | P | 06/07/2017 | frame okay need inspection on spray applied fire barrier repair and drywall attachment / ul listing for material being used on file. | NATHAN | NATHAN | | BFR | P | 5528171 |
DUSTON CONSTRUCTION INC | BSP | T | 06/01/2017 | PAID (REC#1429954) PLAN SPLICE FEE: $50 by: DANM for Construction: Structural letter to address duct enclosure support and hole thru existing metal deck; architectural listed assembly for replacement of monocoat | DANM | DANM | | BSP | T | 5522529 |
DUSTON CONSTRUCTION INC | BSP | P | 05/31/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Reapproved for removal of circ pump. | BERTHA | BERTHA | | BSP | P | 5520975 |
DUSTON CONSTRUCTION INC | BSP | T | 05/31/2017 | PAID (REC#1429954) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: splice to remove circ pump and new design professional stamps | JUSTINC | JUSTINC | | BSP | T | 5520955 |
DUSTON CONSTRUCTION INC | BSP | P | 05/30/2017 | site visit to review pizza oven flue through roof assembly 2 hour rated/no shaft required however need plans to show chase support using unistruts from beams/also need structural letter for roof deck cutout-also need mono coat repair observation letter for areas where removed/upon further review on site this roof assembly is for structure and no firestopping is required | BERTW | BERTW | | BSP | P | 5520552 |
DUSTON CONSTRUCTION INC | BSP | P | 05/26/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: New engineer, re-design of entire scope. | BERTHA | BERTHA | | BSP | P | 5518160 |
DUSTON CONSTRUCTION INC | BSP | T | 05/26/2017 | PAID (REC#1429954) PLAN SPLICE FEE: $75 by: DALEH for Mechanical: entire sheets replaced with new design professional splice is for complete new design, changes to duct design and added two new Fire Dampers
| DALEH | DALEH | | BSP | T | 5517962 |
DUSTON CONSTRUCTION INC | BSP | P | 04/11/2017 | monocoat spray applied protection at beam okay / splice removing door in prep area and shaft enclosure framing and inspection needed still | NATHAN | NATHAN | | BSP | P | 5471065 |
DUSTON CONSTRUCTION INC | BFR | P | 03/08/2017 | provide construction details for pizza oven venting through roof, support and penetrating rated assembly / need scraped off mono coat fire material repaired over new store front ceiling attachment / rear door in kitchen is not being installed plans must be revised and spliced with changes. | NATHAN | NATHAN | | BFR | P | 5434710 |
DUSTON CONSTRUCTION INC | BSP | T | 11/15/2016 | PAID (REC#1407734) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised notes, floor plan layout | JUSTINC | JUSTINC | | BSP | T | 5344257 |
DUSTON CONSTRUCTION INC | B16 | C | 09/14/2016 | CONSULTED WITH PROPOSED MECHANICAL CONTRACTOR AND BUILDING INSPECTOR. PENETRATION IN RATED ROOF CEILING ASSEMBLY WITH SOLID FUEL VENT ASSEMBLY WILL HAVE TO BE ADDRESSED BY ARCHITECT FOR PROTECTION AND HAVE PLANS REVISED FOR THAT DETAIL. ANY CHANGES TO VENT MATERIALS OTHER THEN WHAT IS STATED ON APPROVED PLANS WILL REQUIRE A SPLICE FOR CHANGES. DELETION OF FIRE DAMPERS AND/OR ANY NEW WALLS THAT MAY REQUIRE FIRE DAMPERS WILL ALSO REQUIRE PLAN REVISIONS.
| JON | JON | | B16 | C | 5292720 |
DENHAM ELECTRIC | E= | C | 06/09/2017 | water heater | BRET | BRET | | E= | C | 5530499 |
DENHAM ELECTRIC | E= | R | 06/08/2017 | NO ONE ON SITE AFTER CALL AHEAD--- | BRIAN | BRIAN | | E= | R | 5529481 |
DENHAM ELECTRIC | E= | P | 05/10/2017 | ------------------------Final changed to partial by Dean. Splice came in for additional work.--------------- | BRET | BRET | | E= | P | 5501358 |
DENHAM ELECTRIC | E= | P | 05/08/2017 | gfci receptacle west of pizza ovens. verify disconnect for cooler fan motor. will need access to roof condenser | BRET | BRET | | E= | P | 5498726 |
DENHAM ELECTRIC | E= | R | 05/02/2017 | not ready gfci protect all receptacles in kitchen, see notes red cloud on approved plans, mc on grid cooler area. light fixture hanging by flex in front of restaurant. complete re-inspect. | BRET | BRET | | E= | R | 5492854 |
DENHAM ELECTRIC | E= | R | 05/01/2017 | Framing and hard plumbing need to be complete---Ground all light boxes.---Fan and light switch legs need to be reversed in master bath---Complete re inspect-- | ROB | ROB | | E= | R | 5494083 |
DENHAM ELECTRIC | ER | P | 02/16/2017 | PARTIAL HARD LID AND WALLS ---SEE PLANS--- | BRIAN | BRIAN | | ER | P | 5417064 |
MD SERVICE PLUMBING, INC. | H= | C | 06/13/2017 | AFTER FURTHER REVIEW, INSTALL INSTRUCTIONS DO NOT SAY A RELIEF VALVE NEEDS TO BE INSTALLED, ELECTRICAL LOOKED AT CURRENT WATER HEATER AND HEALTH DEPARTMENT WILL SIZE THE WATER HEATER FOR ITS APPLICATION | MARKB | MARKB | | H= | C | 5533235 |
MD SERVICE PLUMBING, INC. | H= | P | 06/09/2017 | Plans call for a 36kw and a 32 kw tankless water heater was installed. How does this change electrical protection. Further research required on weather or not a relief needs to be installed. Note: Electric tankless - no vent to water heater | MARKB | MARKB | | H= | P | 5530593 |
COLORADO COMMERCIAL SYSTEMS, LLC | H= | C | 05/12/2017 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5504009 |
COLORADO COMMERCIAL SYSTEMS, LLC | H= | C | 05/11/2017 | TAB REPORT RECEIVED - ALL DUCT ACCESS DOORS AT FIRE DAMPERS AND ALL GRILLES ARE COMPLETE - BUILDING INSPECTOR TO INSPECT SOLID FUEL OVENS | JERRYF | JERRYF | | H= | C | 5502815 |
COLORADO COMMERCIAL SYSTEMS, LLC | HD | P | 01/30/2017 | FIRE DAMPER FRAMING OK - BY FINAL NEED TAB REPORT / VERIFY DUCT ACCESS DOORS AND RETAINING ANGLES ((((NOTES BUILDING INSPECTOR TO INSPECT SOLID FUEL PIZZA OVEN FLUE AND SHAFT))))) | JERRYF | JERRYF | | HD | P | 5401212 |
COLORADO COMMERCIAL SYSTEMS, LLC | HD | P | 12/08/2016 | NEED FIRE DAMPER INSTALL MANUAL TO VERIFY FRAMING - NEED GREASE DUCT - REST OF ABOVE CEILING OK | JERRYF | JERRYF | | HD | P | 5363211 |
MD SERVICE PLUMBING, INC. | P= | C | 06/09/2017 | | TAYLOR | TAYLOR | | P= | C | 5530582 |
MD SERVICE PLUMBING, INC. | P= | P | 06/08/2017 | need trap guard at floor drain, add water heater to scope of work, need hammer arrestor and backflow at ice machine, rest ok. | TAYLOR | TAYLOR | | P= | P | 5529156 |
MD SERVICE PLUMBING, INC. | PTO | C | 06/06/2017 | aav at 2 inch hub drain under hot table, add water heater to scope of work by final. | TAYLOR | TAYLOR | | PTO | C | 5526578 |
MD SERVICE PLUMBING, INC. | PTO | L | 03/14/2017 | wrong permit for inspection. | TAYLOR | TAYLOR | | PTO | L | 5440176 |
MD SERVICE PLUMBING, INC. | PTO | P | 03/06/2017 | above ceiling H2O and DWV ok. | TAYLOR | TAYLOR | | PTO | P | 5431880 |
MD SERVICE PLUMBING, INC. | PTO | P | 03/03/2017 | in walls H2O and DWV ok, aav's at hand sink and in wall for floor sink at ice machine. | TAYLOR | TAYLOR | | PTO | P | 5430636 |