JHL CONSTRUCTORS, INC. | B= | C | 10/06/2017 | | MINDY | MINDY | | B= | C | 5647891 |
JHL CONSTRUCTORS, INC. | B= | P | 09/14/2017 | Temp CO: Pending mechanical and Fire finals ( Expires: 10/14/2017 12:00:00 AM) | MINDY | MINDY | | B= | P | 5626093 |
HVAC SOLUTIONS, INC. | BSP | T | 08/28/2017 | PAID (REC#1452905) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouded changes | DALEH | DALEH | | BSP | T | 5608593 |
JHL CONSTRUCTORS, INC. | B= | P | 08/21/2017 | Handrails from B= inspection installed / complete other Finals / need state certificates for Plumbing & Electrical/After further review 8-21-17 Ron brought the state certs to Bert W and are on file ok | RICHB | RICHB | | B= | P | 5601660 |
JHL CONSTRUCTORS, INC. | B= | P | 08/17/2017 | Complete other Finals / need handrail at interior stair 1922 building East side / need handrails on exterior ramps 1922 building / restrooms, egress & exit signage OK throughout -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by CSFIRE is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. ADDED COMMENT 8/18 - Need State certifications for Plumbing & Electrical | RICHB | RICHB | | B= | P | 5598751 |
JHL CONSTRUCTORS, INC. | BLA | P | 07/28/2017 | Stucco lath at new entry (east side) and south portion of 1922 building OK | RICHB | RICHB | | BLA | P | 5578970 |
JHL CONSTRUCTORS, INC. | B= | P | 07/24/2017 | Pre-walk for Final - discussed outstanding inspections including / discussed need for handrail on each side at 1922 Building entry (required per 2015 IBC 1011.11) -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, External Agency Inspection F= by CSFIRE is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, UTE PLUMBING & HEATING, INC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5573641 |
JHL CONSTRUCTORS, INC. | BFR | P | 07/18/2017 | Soffit framing (3 at exterior near entry and 1 interior near office) OK | RICHB | RICHB | | BFR | P | 5567929 |
JHL CONSTRUCTORS, INC. | BIN | P | 07/18/2017 | Rigid at entry OK / plans reviewed on-site | RICHB | RICHB | | BIN | P | 5567916 |
JHL CONSTRUCTORS, INC. | BIN | R | 07/17/2017 | Cancelled by contractor | RICHB | RICHB | | BIN | R | 5565887 |
JHL CONSTRUCTORS, INC. | BFR | P | 07/12/2017 | Soffit framing in new Elementary complete / discussed remaining inspections needed for B= / plans reviewed on-site | RICHB | RICHB | | BFR | P | 5561474 |
JHL CONSTRUCTORS, INC. | BSP | P | 07/05/2017 | Tyvek inspection requested - not required by this jurisdiction - spoke with contractor | RICHB | RICHB | | BSP | P | 5554609 |
JHL CONSTRUCTORS, INC. | BIN | P | 06/30/2017 | Wall insulation in new elementary OK / plans reviewed on-site | RICHB | RICHB | | BIN | P | 5552267 |
JHL CONSTRUCTORS, INC. | BFR | P | 06/26/2017 | Framing in new Elementary section complete pending state electrical / remodel framing in existing Elementary section complete / plans reviewed on-site | RICHB | RICHB | | BFR | P | 5546881 |
JHL CONSTRUCTORS, INC. | BLA | P | 06/20/2017 | 1922 Building - entire west elevation OK, west half of north elevation OK, no other areas ready for inspection | RICHB | RICHB | | BLA | P | 5540766 |
JHL CONSTRUCTORS, INC. | BSP | P | 06/15/2017 | Discussed third-party inspections with JHL / exterior structural framing OK, roughly Grids AA-P including clerestory (field set highlighted in blue) - missing screws added by framer during inspection / welds inspected by third-party / Leffler shop drawings and permit set reviewed in field office | RICHB | RICHB | | BSP | P | 5537423 |
JHL CONSTRUCTORS, INC. | BFR | P | 06/15/2017 | Furr-out in 1922 Building classrooms (403, 404, 405, 407, 408, 409 & 410) OK / plans reviewed in field office | RICHB | RICHB | | BFR | P | 5537422 |
JHL CONSTRUCTORS, INC. | BFR | P | 06/08/2017 | Partial 1922 Building interior non-bearing framing (Sheet A2.4) - door & window infills on main level, partition framing in Teacher's Lounge, partition framing for Janitor's Closet / permit set reviewed on-site / discussed requirements for relocated metal building (bus maintenance shed) | RICHB | RICHB | | BFR | P | 5529808 |
JHL CONSTRUCTORS, INC. | BSP | P | 06/08/2017 | Reviewed sheathing and third party inspection requirement with JHL | RICHB | RICHB | | BSP | P | 5529807 |
JHL CONSTRUCTORS, INC. | BSP | P | 05/24/2017 | (6) penetrations in 2-hour wall adjacent to elevator / UL system C-AJ-1421 and product verified with Ron (JHL), electrician and plumber / plans reviewed on-site | RICHB | RICHB | | BSP | P | 5515994 |
JHL CONSTRUCTORS, INC. | BLA | P | 05/17/2017 | Lathe on exterior of Vestibule 225A complete / plans reviewed electronically | RICHB | RICHB | | BLA | P | 5509212 |
JHL CONSTRUCTORS, INC. | BLA | P | 05/05/2017 | lathe on upper vestibule walls at grid 35 ok / above roof at clear story | ERICR | ERICR | | BLA | P | 5497487 |
JHL CONSTRUCTORS, INC. | BIN | P | 05/05/2017 | R13 foam insulation installed grid 35 upper vestibule under lathe | ERICR | ERICR | | BIN | P | 5497486 |
JHL CONSTRUCTORS, INC. | BSP | P | 04/27/2017 | !st row of Heckmann clips (approx elev 107') at 1922 Building OK / plans reviewed electronically | RICHB | RICHB | | BSP | P | 5488885 |
JHL CONSTRUCTORS, INC. | BFI | P | 04/24/2017 | 2" R10 at 24"+ verified adjacent to existing 1922 building / elevator pit waterproofing OK / plans reviewed electronically | RICHB | RICHB | | BFI | P | 5485005 |
JHL CONSTRUCTORS, INC. | BFI | P | 04/21/2017 | Insulation not complete at foundation near new elevator (adjacent to 1922 Building) due to weather - call for re-inspection when complete / portions already installed are acceptable / plans reviewed electronically | RICHB | RICHB | | BFI | P | 5483794 |
JHL CONSTRUCTORS, INC. | B= | P | 04/12/2017 | Temp CO: all partial ( Expires: 8/12/2017 12:00:00 AM) | JANE | JANE | | B= | P | 5472226 |
JHL CONSTRUCTORS, INC. | BT= | P | 04/03/2017 | TCO inspection for Phase 3 area only / smokes & COs observed / verified egress including concrete sidewalks / verified barriers to prevent access into areas still under construction / verified restrooms including accessibility / area complete pending fire inspection later today / plans reviewed electronically | RICHB | RICHB | | BT= | P | 5463485 |
JHL CONSTRUCTORS, INC. | BSP | P | 03/29/2017 | Tyvek on exterior of new vestibule (grid 35) OK / pre-walk for TCO / plans reviewed electronically | RICHB | RICHB | | BSP | P | 5458821 |
JHL CONSTRUCTORS, INC. | BT= | P | 03/14/2017 | Discussed outstanding and required items for TCO on Phase 3 / no inspection done today | RICHB | RICHB | | BT= | P | 5440288 |
JHL CONSTRUCTORS, INC. | BIN | P | 03/10/2017 | Rigid insulation at new vestibule (grid 35) / reviewed phasing plans & inspection sequencing / plans reviewed electronically | RICHB | RICHB | | BIN | P | 5437482 |
JHL CONSTRUCTORS, INC. | BFR | P | 03/02/2017 | partial framing inspection for atrium @ clear story soffit and interior wall/interior framing along 2 hour south fire wall -- Discussed with Ron still needing dampers installed and inspected for smoke partitions and listings for penetrations -- discussed with Ron needing state plumbing/electrical, all 3rd party observations, fire, mechanical, health department partials for phase 1/2 for possible TCO of these areas -- shops still in state electrical review/ kitchen and cafeteria are phase 3/barricading for phase 3 areas as well | SCOTTS | SCOTTS | | BFR | P | 5429558 |
JHL CONSTRUCTORS, INC. | BSP | P | 03/02/2017 | Job walk with Scott S - introduced to Ron and Hector (JHL) | RICHB | RICHB | | BSP | P | 5429510 |
JHL CONSTRUCTORS, INC. | BIN | P | 02/21/2017 | partial insulation inspection for clear story above atrium for batts/still need to see continuous rigid insulation on exterior walls per ComCheck at this location and others based on wall type | SCOTTS | SCOTTS | | BIN | P | 5419780 |
JHL CONSTRUCTORS, INC. | BFR | P | 02/21/2017 | partial framing inspection for soffit in cafeteria per detail 22 on A11.1 -- framing ok | SCOTTS | SCOTTS | | BFR | P | 5419779 |
JHL CONSTRUCTORS, INC. | BFR | P | 02/16/2017 | partial framing for hard lids in east bathroom group and closets/framing ok | SCOTTS | SCOTTS | | BFR | P | 5416958 |
JHL CONSTRUCTORS, INC. | BIN | P | 02/16/2017 | partial inspection for batt insulation for 1st story of vestibule and corridor west to weight room/R19 batts ok -- clear story not yet insulated | SCOTTS | SCOTTS | | BIN | P | 5416957 |
JHL CONSTRUCTORS, INC. | BSP | R | 02/16/2017 | not ready -- smoke dampners not installed/need inspected by mechanical -- only one section of joint was sealed/ provide details on sealing all penetrations and joints per 2015 IBC 710 | SCOTTS | SCOTTS | | BSP | R | 5416956 |
JHL CONSTRUCTORS, INC. | B= | P | 02/14/2017 | partial for gymnasium only -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, UTE PLUMBING & HEATING, INC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 5415289 |
JHL CONSTRUCTORS, INC. | BSP | P | 02/14/2017 | received State plumbing inspection for gymnasium with approved to occupy // update 3:59 p.m. -- received letter from Edison Fire Chief | SCOTTS | SCOTTS | | BSP | P | 5415130 |
JHL CONSTRUCTORS, INC. | BSP | P | 02/14/2017 | discussed with Hector w/JHL via phone about remaining items needed to get a partial final for gymnasium only -- still need state plumbing and electrical ok for gymnasium/ need fire approval for partial/boiler signed off/ mechanical sign off for gymnasium -- bathroom facilities are not operational in the building/facilities in existing buildings will be used | SCOTTS | SCOTTS | | BSP | P | 5414338 |
JHL CONSTRUCTORS, INC. | BSP | P | 02/13/2017 | safety walk for protection of pedestrians/walkways meet minimum of 4 feet in width/ exit signs in place/back up lighting for pathways/8' height barriers in place/ temporary handrail placed for ramp | SCOTTS | SCOTTS | | BSP | P | 5413312 |
JHL CONSTRUCTORS, INC. | BIN | R | 02/13/2017 | field cancelled by Ron/not ready | SCOTTS | SCOTTS | | BIN | R | 5413311 |
JHL CONSTRUCTORS, INC. | BSP | P | 02/09/2017 | Heckman clips ok at fire wall by elementary school -- letter on file for spacing of clips at less than but no more than 24" O.C. -- discussed with Ron still needing insulation inspection for corridor north of gym and atrium/ discussed egress plan for event/handrail at ramp needs to be installed as part of egress path | SCOTTS | SCOTTS | | BSP | P | 5411098 |
JHL CONSTRUCTORS, INC. | BIN | P | 02/02/2017 | partial insulation inspection for exterior wall batt insulation from south corridor to cafeteria along east side of building -- R19 placed ok | SCOTTS | SCOTTS | | BIN | P | 5405206 |
JHL CONSTRUCTORS, INC. | BFR | P | 02/02/2017 | partial framing inspection for interior wall framing kitchen/cafeteria/computer lab/south corridor/hard lid framing for hallway outside of library -- spoke with Hector w/JHL about mechanical contractor scheduling hood wall inspection with mechanical inspector prior to covering | SCOTTS | SCOTTS | | BFR | P | 5405205 |
JHL CONSTRUCTORS, INC. | BSP | R | 02/02/2017 | Heckman clip reinspect field cancelled by Hector w/JHL | SCOTTS | SCOTTS | | BSP | R | 5405204 |
JHL CONSTRUCTORS, INC. | BSP | R | 01/31/2017 | inspection for 2 hour wall at elementary side -- masonry wall installed and Hector w/JHL stated wall was observed full time by 3rd party/ observation to be listed in summary of 3rd party observations -- Heckman clips were installed but exceeded 24" O.C. and will need to be reinspected/detail on file for Heckman Clip and 2 hilti fastners per 14 on S3.2 ok -- door not yet installed on 2 hour wall/refer to door schedule for 90 min door/backing still to be installed at perpendicular wall for magnetic release/discussed with Ron w/JHL drying in door openings on remainder of building prior to insulation | SCOTTS | SCOTTS | | BSP | R | 5402643 |
JHL CONSTRUCTORS, INC. | BIN | P | 01/30/2017 | partial insulation inspection for weight room/shipping and receiving rooms -- R19 batts in place at exterior walls of these areas per ComCheck | SCOTTS | SCOTTS | | BIN | P | 5401412 |
JHL CONSTRUCTORS, INC. | BIN | P | 01/26/2017 | insulation was not ready to be observed yet -- discussed with Ron and Mario Com Check and previous notes from pre con involving wall types and the clarification provided by the architect on insulation at each wall type/documentation for spray applied foam/documentation for roof insulation | SCOTTS | SCOTTS | | BIN | P | 5399481 |
JHL CONSTRUCTORS, INC. | BFR | P | 01/11/2017 | partial framing inspection for balance of area A exterior walls -- ceiling framing for boys/girls locker rooms/ gym bathrooms/ gym office -- discussed with Ron possible temporary use of gym/ Ron will need to set up meeting concerning use and to provide exit pathway plan -- also discussed detail with Heckman clips on fire wall/clip calls for 2 screws on detail and is discrepancy from clip design/RFI from engineer needed --- need fire inspection on areas looked at for ceiling framing prior to hanging drywall | SCOTTS | SCOTTS | | BFR | P | 5386571 |
JHL CONSTRUCTORS, INC. | BSP | P | 01/03/2017 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: AMM application to State for daylighting. | SHELLEY | SHELLEY | | BSP | P | 5380852 |
JHL CONSTRUCTORS, INC. | BFR | P | 12/14/2016 | partial exterior wall framing from cafeteria to south up to vestibule | SCOTTS | SCOTTS | | BFR | P | 5367831 |
JHL CONSTRUCTORS, INC. | BFR | P | 11/16/2016 | partial framing inspection for exterior walls of weight room/storage/receiving room | SCOTTS | SCOTTS | | BFR | P | 5346128 |
JHL CONSTRUCTORS, INC. | BFN | P | 11/10/2016 | partial slab on grade inspection of vapor barrier and mesh for locker rooms and mechanical/electrical room | SCOTTS | SCOTTS | | BFN | P | 5341430 |
JHL CONSTRUCTORS, INC. | BFR | P | 11/10/2016 | partial framing inspection for parapet wall above weight room and mechanical/electrical rooms | SCOTTS | SCOTTS | | BFR | P | 5341420 |
JHL CONSTRUCTORS, INC. | BFR | P | 11/01/2016 | partial framing for parapet wall above locker rooms | SCOTTS | SCOTTS | | BFR | P | 5332920 |
JHL CONSTRUCTORS, INC. | BFT | P | 11/01/2016 | partial slab on grade for vapor barrier at gym and slab reinforcing ok | SCOTTS | SCOTTS | | BFT | P | 5332919 |
JHL CONSTRUCTORS, INC. | BFI | P | 10/28/2016 | partial foundation insulation for remainder of foundation wall placed as of this date/2" R10 24"-32" ok | SCOTTS | SCOTTS | | BFI | P | 5330573 |
JHL CONSTRUCTORS, INC. | BFI | P | 10/27/2016 | partial foundation insulation inspection at east of gym foundation walls 2" R10 24+" ok | SCOTTS | SCOTTS | | BFI | P | 5329424 |
JHL CONSTRUCTORS, INC. | BFR | P | 10/27/2016 | non structural parapet cap around gym perimeter does not need observation | SCOTTS | SCOTTS | | BFR | P | 5329402 |
JHL CONSTRUCTORS, INC. | BFT | P | 10/21/2016 | partial inspection for foundation walls/reinforcing -- infills along A-- foundation walls along B from 5- 7.1/ along 7.1 from B to C/along 15 from K to P -- locker room roof slab reinforcement | SCOTTS | SCOTTS | | BFT | P | 5324814 |
JHL CONSTRUCTORS, INC. | BFN | P | 09/29/2016 | missing vertical bar out of footing for pilaster on F@13/provide engineer letter for correction -- foundation walls phase 2 at following: on H from 6-7/ 7 from L to M/ L from 7-35/ 35 from JJ.3 to GG.9/ C from 8-8.2/ 10 from PP -D/ D from 10-12/ 12 from D-F/ F from 12-13/ 13 from F -H/ H from 13-14/ 14 from H to L | SCOTTS | SCOTTS | | BFN | P | 5306324 |
JHL CONSTRUCTORS, INC. | BFT | P | 09/09/2016 | ok to use engineer for inspection | SCOTTS | SCOTTS | | BFT | P | 5289032 |
JHL CONSTRUCTORS, INC. | BSP | P | 09/07/2016 | pre con meeting with sub contractors/ Mario, Rod, and Hector with JHL-- discussed break away hardware for fire walls/ok to use 3rd party -- discussed penetrations in fire walls/fire barriers and UL details/ framing for fire walls and fire barriers and correct hardware for system/ pre insulation of kings and headers/ manufacturer info for rigid insulation and R value/ accessibility for bathrooms and review of splice/ temporary egress to have plan review/ 2015 IBC with no local amendments site wide/ all state and 3rd party inspections prior to final and per phase if planning on turning over | SCOTTS | SCOTTS | | BSP | P | 5286810 |
JHL CONSTRUCTORS, INC. | BFT | P | 09/06/2016 | partial footing inspection (2500 psf) for Phase 2 Gym/locker rooms/shops --- A to E along 1/ 1 to 2 along E/ E to M along 2/ 2 to 6 along M/ M to N along 6/ 6 to 7 along N/ 6 to 7.1 along C/ C to J along 6/ 6 to 8 along J/ D to J along 8 -- reinforcing ok for these areas -- received School Fire Inspection Report | SCOTTS | SCOTTS | | BFT | P | 5285773 |
JHL CONSTRUCTORS, INC. | BSP | P | 08/24/2016 | met on site with Mario PM JHL(303)-587-6058 concerning project schedule/foundation/phasing -- job site trailer to be located at rear of school -- plans will be located in trailer with code study once trailer is set up -- discussed 3rd party excavation observations previous to footing inspections/ process for state inspector's inspections during projects/ 3rd party weld inspections for precast walls/ quality assurance report for precast panels/precon with subs at later date | SCOTTS | SCOTTS | | BSP | P | 5276815 |
HVAC SOLUTIONS, INC. | H= | C | 10/05/2017 | All complete | JON | JON | | H= | C | 5646452 |
HVAC SOLUTIONS, INC. | H= | P | 09/26/2017 | CONSULTED SKUTT SUPPORT AND RECEIVED INSTALLATION INSTRUCTIONS FOR THE KILN. APPEARS EXHAUST DUCT SYSTEM DOES NOT COMPLY WITH THE UL TESTING OF THIS KILN. ALSO HAVE BEEN IN CONTACT THROUGH EMAIL WITH HVAC SOLUTIONS PROJECT MANAGER. | JON | JON | | H= | P | 5636953 |
HVAC SOLUTIONS, INC. | H= | P | 09/22/2017 | Did not see picture of Kiln installed on job site. Still need Corrected balance report. rest ok | JON | JON | | H= | P | 5633693 |
HVAC SOLUTIONS, INC. | H= | P | 09/20/2017 | REVIEWED BALANCE REPORT AND ALL OK EXCEPT THERE WAS NO TEST DATA ON EF-7.. CALLED PROJECT MANAGER, STILL NEED PICTURES SENT FOR MOVING CONDENSING UNIT ON ROOF AND THE KILN INSTALLATION, MAY NEED INSTRUCTIONS FOR KILN.. | JON | JON | | H= | P | 5631452 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 08/21/2017 | COMPLETED | ROBERTV | ROBERTV | | HE= | C | 5601833 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 08/18/2017 | NEED ELEVATOR CONTRACTOR TO SUPPLY MAINTENANCE CONTROL PROGRAM AND MAINTENANCE TASK MANUALS ONSITE AS REQUIRED FOR ACCEPTANCE, ALL OTHER ITEMS ADDRESSED. OK FOR PUBLIC USE NOTE: SEE IMAGES FOR LETTER REGARDING REMOVAL OF ELEVATOR FROM GENERATOR EMERGENCY POWER BY ENGINEERS AND ARCHITECT | ROBERTV | ROBERTV | | HE= | P | 5600753 |
HVAC SOLUTIONS, INC. | H= | P | 08/16/2017 | 1- NEED GUARD RAIL AT ROOF TOP CONDENSER WITHIN 10 FET OF 30" DROP. 2- NEED BALANCE REPORT. PLEASE REVIEW REPORT FOR MINIMUM CODE REQUIREMENTS BEFORE REPORT IS SUBMITTED. REPORT CAN BE ATTACHED TO AN INSPECTION REQUEST. 3- NEED ALL PLAN SPLICES COMPLETED AND APPROVED. 4- KILN IS NOT INSTALLED AT THIS TIME AND ENSURE KILN IS PART OF THE PLAN SPLICE FOR CHANGES.
| JON | JON | | H= | P | 5598150 |
MAUI MECHANICAL, INC. | H= | C | 08/16/2017 | WALK IN COOLERS | JON | JON | | H= | C | 5598123 |
MAUI MECHANICAL, INC. | HRP | C | 08/16/2017 | | JON | JON | | HRP | C | 5598122 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 08/11/2017 | NEED ADEQUATE LIGHTING IN ELEVATOR PIT AND CONTROLLER SPACE, LABEL MAIN AND CAB CIRCUIT BREAKERS, NEED VERIFICATION OF SUMP PUMP OPERATION, PROTECT OR CUT ROOF FASTENERS IN OVERHEAD, NEED "DO NOT USE ELEVATOR IN CASE OF EMERGENCY" SIGNS, HOISTWAY RESTRICTOR PLATE INSTALLED IN WRONG LOCATION, TOP OF CAR EMERGENCY EXIT CHAIN NEEDS CONNECTED, NEED MAINTENANCE CONTROL PROGRAM AND TASKS MANUALS ONSITE. ELEVATOR SHOW TO OPERATE ON EMERGENCY POWER - NO REQUIRED FULL LOAD TESTING OR FIRE RECALL TESTING HAS BEEN PERFORMED BECAUSE ELEVATOR IS INCAPABLE OF OPERATING WITH GENERATOR. ONCE CORRECTED, REQUIRED TESTING WILL NEED TO RESUME. ELEVATOR SHALL NOT BE AVAILABLE FOR PUBLIC USE UNTIL COMPLETED. | ROBERTV | ROBERTV | | HE= | P | 5592795 |
UTE PLUMBING & HEATING, INC | H= | C | 08/09/2017 | BOILERS WATER HEATERS AND PIPING. GAS PIPING INSPECTED BY THE STATE. | JON | JON | | H= | C | 5591153 |
HVAC SOLUTIONS, INC. | HSP | P | 08/07/2017 | ADDED INSPECTION NOTE FROM OFFICE. HAD PHONE CONVERSATION WITH CAMERON FROM HVAC SOLUTIONS AND RON FROM JHL. NEED PLANS BROUGHT UP DATE FOR ALL CHANGES INCLUDING GREASE DUCT AND KILN. PROJECT MANAGER SENDING CONSTRUCTION CHANGE DOCUMENTS TO INSPECTOR FOR REVIEW. NEED GREASE DUCT ACCESS DOOR INSTRUCTIONS AND TO BE LISTED FOR GREASE. ALSO NEED INSTRUCTIONS FROM WRAP MANUFACTURE FOR PROPER APPLICATION OF WRAP. ALSO DISCUSSED GREASE FAN DISCHARGE, INTERLOCKS AND TEMPERATURE SENSORS. SEE ALL INSPECTION HISTORY FOR FINAL INSPECTION. | JON | JON | | HSP | P | 5587576 |
HVAC SOLUTIONS, INC. | H= | P | 08/02/2017 | CORRIDOR AREA AROUND PRINCIPALS OFFICE AND AREA AROUND STAIRWELL ABOVE CEILINGS COMPLETE. BATH ROOMS AT STAIR WELL AREA COMPLETE. SEE ALL INSPECTION HISTORY FOR FINAL. NEED TO MAKE SURE ALL WALL COVERING IS SEALED AROUND HOOD. WHILE WALKING ROOF TOP FOR WATER HEATER VENTS, NOTICED THAT GREASE EXHAUST IS WITHIN 10 FEET OF PARAPET WALL. STILL NEED TO SEE UNDER GREASE FAN AS WELL. | JON | JON | | H= | P | 5584248 |
UTE PLUMBING & HEATING, INC | H= | P | 08/02/2017 | NEED PICTURE OF DOMESTIC WATER HEATER DRAIN REPAIRS NEED TO USE IMAGE UPLOAD ON A INSPECTION REQUEST. REST OK | JON | JON | | H= | P | 5584219 |
UTE PLUMBING & HEATING, INC | HV | C | 08/02/2017 | 1- KITCHEN WATER HEATER AND 2 DOMESTIC WATER HEATERS FOR SCHOOL. | JON | JON | | HV | C | 5584218 |
HVAC SOLUTIONS, INC. | HSP | P | 08/01/2017 | ADDED NOTES FROM LAST ON SITE INSPECTION. DISCUSSED ALL THE FOLLOWING THAT SAME DAY WITH BUILDING CONTRACTOR AND HVAC SUPERINTENDENT. THE WALK IN COOLERS THAT WERE RELOCATED NEED PERMITS AND INSPECTIONS. BOTH CONTRACTORS WERE TO REVIEW THE PLANS FOR ANY REFRIGERANT QUANTITIES AND ALARMS IF NEEDED AT THE WALK IN COOLERS. tHIS INSPECTOR WILL ALSO REVIEW THE PLANS FOR THAT INFORMATION. ALSO DID NOT SEE VENT INSPECTIONS FOR WATER HEATER. IT APPEARS BOILER VENTS WERE INSPECTED ON 2-09-17. | JON | JON | | HSP | P | 5582258 |
HVAC SOLUTIONS, INC. | HSP | P | 07/27/2017 | DISCUSSED TYPE ONE HOOD IN KITCHEN. INSPECTION PROCEDURE FOR ADDING NON COMBUSTIBLE NON ABSORBENT CLEANABLE SURFACE 18" OUT ON DRYWALL ALL AROUND HOOD. CALL INSPECTION WHEN READY. ALSO NEED ALL WORK ON GREASE DUCT WRAP AND CLEAN OUTS COMPLETED ABOVE CEILING BEFORE COVER. ALSO DISCUSSED TEMPERATURE SENSOR'S AND INTERLOCKS. | JON | JON | | HSP | P | 5578559 |
HVAC SOLUTIONS, INC. | H= | P | 07/27/2017 | CHANGED REQUESTED INSPECTION FROM HD TO H= HEAT FINAL INSPECTION. WILL NEED SPLICE FOR CHANGES AND INSPECTION FOR KILN FOR ART ROOM AREA C BEFORE FINAL AREA C ABOVE CEILING COMPLETE EXCEPT WHERE THE 3 HEAT PUMPS ARE LOCATED, STILL NEED DRAINS ADDRESSED PER LAST INSPECTION NOTES AND INSPECTED. AREA A ABOVE CEILING COMPLETE EXCEPT CORRIDOR 202. ABOVE CEILING IN ALL ROOMS FROM PRINCIPAL'S OFFICE THROUGH TO MUSIC ROOM. BATHROOMS NOT READY IN AREA A. WILL NEED BALANCE REPORT AND ROOF INSPECTION BEFORE FINAL. SEE HSP INSPECTION FOR NOTES ON KITCHEN | JON | JON | | H= | P | 5578472 |
HVAC SOLUTIONS, INC. | HD | P | 07/18/2017 | NORTH STAIRWAY 10" X 10" ABOVE CEILING DUCT OK TO WRAP. ABOVE CEILING DUCT IN ATTIC ABOVE "C" AREA FOR 3 HEAT PUMPS OK TO WRAP. Need to see primary/secondary protection for heat pumps 13, 14 & 15 Will need manufacturer instructions on site for kiln when ready for inspection. GREASE HOOD - Spoke with GC and mechanical contractor about FRP and combustible clearance for left side hood wall to FRP and above hood to ceiling tiles. Will need 18" metal to left of hood and on wall above/behind hood - All to be properly sealed. Will need 6" clearance on sides of equipment under hood. No temperature sensor found installed in hood. | MARKB | MARKB | | HD | P | 5568144 |
HVAC SOLUTIONS, INC. | HD | P | 06/29/2017 | AREA A - ABOVE CEILING LOW PRESSURE RUN OUTS / VAV'S / RESTROOM EXHAUST AND ALL MEDIUM PRESSURE TIE INS OK TO WRAP FROM GRID LINES P THROUGH AA | JERRYF | JERRYF | | HD | P | 5550703 |
UTE PLUMBING & HEATING, INC | HWP | P | 06/29/2017 | ALL HWP MAINS AND TIE INS AT ALL VAV'S AND PRESSURE TEST OK TO WRAP | JERRYF | JERRYF | | HWP | P | 5550702 |
HVAC SOLUTIONS, INC. | HD | P | 06/27/2017 | ABOVE CEILING IN THE FOLLOWING AREA'S OK TO WRAP - BUILDING 1922 1ST FLOOR EXHAUST / SUPPLY AND 2ND FLOOR EXHAUST - AREA A ALL MEDIUM PRESSURE MAINS AND LOW PRESSURE RUN OUTS OK FOR WRAP FROM GRID LINES P THROUGH AA - STILL NEED ALL EXHAUST | JERRYF | JERRYF | | HD | P | 5547872 |
HVAC SOLUTIONS, INC. | HD | P | 06/09/2017 | GREASE DUCT OK FOR 2 LAYERS OF GREASE WRAP | JERRYF | JERRYF | | HD | P | 5531375 |
HVAC SOLUTIONS, INC. | HD | P | 04/19/2017 | ALL SA / RA GRILLES IN CAFETERIA OK - GREASE DUCT DROP FOR FAN OK FOR 2 LAYERS NEED PICTURES OF 1ST LAYER AT FUTURE INSPECTION | JERRYF | JERRYF | | HD | P | 5480079 |
HVAC SOLUTIONS, INC. | H= | P | 03/29/2017 | PARTIAL HEAT FINAL ON AREA'S A AND B OK - MINUS SCIENCE CLASSROOMS / KITCHEN AND CAFETERIA - TAB REPORT | JERRYF | JERRYF | | H= | P | 5459017 |
HVAC SOLUTIONS, INC. | HD | P | 03/21/2017 | INSPECTION WAS FOR PHASE 3 - ALL SA / RA / EXHAUST GRILLES COMPLETE IN THE FOLLOWING AREA'S - CONCESSIONS / STORAGE / MEN'S AND WOMEN'S RESTROOMS / ATHLETIC STORAGE / COMPUTER LAB / LIBRARY / CORRIDOR 256 AND 257 - GREASE DUCT INSPECTION FOR 8' OF DUCT AND TRANSITION AT END OK - 2 SMOKE DAMPER FRAMING AND DAMPERS OK | JERRYF | JERRYF | | HD | P | 5451299 |
HVAC SOLUTIONS, INC. | HD | P | 03/09/2017 | SEVERAL HOLES IN GREASE DUCT STOPPED INSPECTION - SMOKE DAMPERS AT METAL SHOP FRAMED INCORRECTLY AT AREA B AREA A - ABOVE CEILING SA RUN OUTS AND GRILLES OK AT THE FOLLOWING VAV BOXES VAV 16 AND VAV 15 | JERRYF | JERRYF | | HD | P | 5436175 |
HVAC SOLUTIONS, INC. | HD | P | 03/07/2017 | NEED ALL WELDS GROUND SMOOTH ON OFFSET AND RE INSPECT - NEED ALL FINAL CONNECTIONS INSPECTED - REST OK ON ALL OTHER GREASE DUCT INSPECTED ON GROUND - VAV BOXES 18A - 14 - AND 16 AND ALL FINAL CONNECTIONS OK | JERRYF | JERRYF | | HD | P | 5433379 |
HVAC SOLUTIONS, INC. | H= | P | 03/01/2017 | PARTIAL HEAT FINAL FOR AREA B WORK SHOPS / LOCKER ROOMS / LOCKER ROOM OFFICES -PENDING 2 SMOKE DAMPERS IN METAL SHOP / TAB REPORT AND ROOF INSPECTION - ALL APPROVED AREA'S ARE HIGH LIGHTED IN YELLOW DATED 3/1/2017 ON HVAC SOLUTIONS PLANS | JERRYF | JERRYF | | H= | P | 5427994 |
HVAC SOLUTIONS, INC. | H= | P | 02/14/2017 | PARTIAL HEATING FINAL FOR GYMNASIUM ONLY | JERRYF | JERRYF | | H= | P | 5414320 |
UTE PLUMBING & HEATING, INC | HWP+ | P | 02/09/2017 | PRESSURE TEST OK - PIPING PER PLAN IN BOILER ROOM | JERRYF | JERRYF | | HWP+ | P | 5410855 |
HVAC SOLUTIONS, INC. | HD | P | 02/09/2017 | ABOVE CEILING MEDIUM PRESSURE AND LOW PRESSURE IN AREA A OK - HOOD WALL FRAMING OK - NEED TO VERIFY MANUFACTURES SUPPORT STRAPS ON BOILER VENTS REST OF VENTS OK - MUA DUCT AT KITCHEN OK - ALL INSPECTED WORK HIGH LIGHTED IN GREEN DATED 2/9/2017 - NEED BOILER VENTS AND ALL VAV BOXES AND SUPPLIED EQUIPMENT ADDED TO PERMIT - ((((( PERMIT FEE DOES NOT MATCH WORK SCOPE)))))) | JERRYF | JERRYF | | HD | P | 5410854 |
HVAC SOLUTIONS, INC. | HD | P | 01/31/2017 | ABOVE CEILING OK ON ALL MEDIUM AND LOW PRESSURE DUCT AND RUN OUTS FROM GRID LINE K TO 2 HOUR WALL - STILL MEDIUM PRESSURE MAIN LINES / ALL EXHAUST AND KITCHEN AREA | JERRYF | JERRYF | | HD | P | 5402515 |
UTE PLUMBING & HEATING, INC | HWP+ | P | 01/31/2017 | PRESSURE TEST OK ON ALL VAV LINES AT THE FOLLOWING BOXES 10 THROUGH 16 - FROM GRID LINES K TO 2 HOUR WALL | JERRYF | JERRYF | | HWP+ | P | 5402514 |
HVAC SOLUTIONS, INC. | HD | P | 01/09/2017 | ABOVE CEILING OK IN AREA B - ALL VAV BOXES OK - STILL NEED 2 SMOKE DAMPERS AT WOOD SHOP | JERRYF | JERRYF | | HD | P | 5384476 |
UTE PLUMBING & HEATING, INC | HWP+ | P | 01/09/2017 | BEFORE NEXT INSPECTION NEED ALL CONTRACTOR SUPPLIED EQUIPMENT ADDED TO PERMIT NOTES: PRESSURE TEST AND PIPING OK AT AREA B - PIPING PER PLAN - ALL CABINET HEATERS OK | JERRYF | JERRYF | | HWP+ | P | 5384459 |
HVAC SOLUTIONS, INC. | HD | P | 12/14/2016 | ABOVE CEILING OK ON THE FOLLOWING - VAV BOXS 4 AND 5 IN LOCKER ROOMS - SA HIGH PRESSURE / LOW PRESSURE IN CORRIDOR ALL HIGH LIGHTED IN PINK DATED 12/13 | JERRYF | JERRYF | | HD | P | 5367738 |
HVAC SOLUTIONS, INC. | HD | P | 12/06/2016 | LOW PRESSURE DUCT AND RUN OUTS ABOVE CEILING FOR LOCKER ROOM AND GYM OK - MINUS EQUIPMENT - DRYER VENT IN WALL AT LAUNDRY OK | JERRYF | JERRYF | | HD | P | 5361193 |
HVAC SOLUTIONS, INC. | H16 | C | 12/06/2016 | NEED UTE PLUMBING ATTACHED ASAP FOR HYDRONICS AND BOILER - ALL HYD. PIPING IN LOCKER ROOMS FOR AREA B OK / PRESSURE TEST OK ON SAME | JERRYF | JERRYF | | H16 | C | 5361192 |
HVAC SOLUTIONS, INC. | HD | P | 11/23/2016 | THIS INSPECTION WAS FOR ERV #2 SA DUCT I N GYM ONLY HIGH LIGHTED ON HVAC SOLUTIONS PLANS IN GREEN- ALL OK | JERRYF | JERRYF | | HD | P | 5352396 |