J. E. DUNN CONSTRUCTION COMPANY | B= | C | 11/20/2018 | zoning complete | JANE | JANE | | B= | C | 6031670 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 10/26/2018 | Temp CO: per Bert W. Zach confirmed they ware waiting for bonding. ( Expires: 11/25/2018 12:00:00 AM) | RITA | RITA | | B= | P | 6007956 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 10/22/2018 | . Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 6001285 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 09/26/2018 | Temp CO: Temp CO: pending electrical, building and zoning finals ( Expires: 10/26/2018 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5977855 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 08/30/2018 | Temp CO: pending electrical, building and zoning finals ( Expires: 9/29/2018 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5951148 |
J. E. DUNN CONSTRUCTION COMPANY | B= | P | 08/30/2018 | items corrected, plans completed with splice, transfer shower okay . Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), DYNALECTRIC COMPANY Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5950977 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/16/2018 | need holes in elevator shaft walls caulked to stairs, splice penthouse framing in plan, transfer shower size not per 2003 ANSI requirements. | NATHAN | NATHAN | | BSP | P | 5937084 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | C | 08/09/2018 | Engineers observation Letter on file / | NATHAN | NATHAN | | BFN | C | 5928642 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/09/2018 | =======penthouse framing for elevator stairs and new canopy framing at entry not spliced.========= | NATHAN | NATHAN | | BSP | P | 5928641 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 05/09/2018 | shaft wall at upper level elevator lobby CMU wall okay with plan splice. | NATHAN | NATHAN | | BFR | P | 5840257 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 05/04/2018 | exterior canopy at entry frame okay with completed required inspections and splice of engineer stamped plan. | NATHAN | NATHAN | | BFR | P | 5836499 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 04/19/2018 | outstanding items to be corrected prior to final inspection, engineer stamped letter addressing soils, compaction and bearing, footer, foundation, including reinforcement, structural components of walls, concrete and CMU, welding, structural roof connections and observations, steel beams,posts and connections. splice for penthouse framing, complete all required rated wall and penetration inspections, post address per RBC 312.11.1 and 312.11.2 . Talked with Andy and Dale for final inspection requirements and visits. | NATHAN | NATHAN | | BSP | P | 5822214 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 04/05/2018 | above ceiling inspection at Data Halls 1-4, exit sign placement and orientation with server cabinets installed exit signs cannot be seen, marking and firecaulking above ceiling at all Data halls okay. | NATHAN | NATHAN | | BSP | P | 5809177 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 03/07/2018 | Met with Andy and Dale about outstanding frame and structural items all letters for structural observation of foundation, structure and details for roof penthouse frame, discussed use of fire rated material in regards to type 3 building elements. | NATHAN | NATHAN | | BSP | P | 5782209 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 01/26/2018 | remaining soffit framing at Area A and remaining hall soffit completed, rated wall marking is being installed throughout area A, | NATHAN | NATHAN | | BFR | P | 5749330 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 12/29/2017 | NEED ALL ABOVE CEILING RATED WALL PENETRATIONS INSPECTED AND MARKED PER IBC 703.6 suggested wording is fire and/ or smoke barrier protect all openings, with specific letter size and spacing, remaining wall framing at Data hall 4 and drywall, airlock and corridors A1.00J, A109.A,B okay. goods in/out office A1.17 okay with completed required inspections. Hardlid and soffits at A.5-E east to west side of corridor A1.06A,B, and all of 1.00C okay. | NATHAN | NATHAN | | BFR | P | 5725680 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 12/07/2017 | PAID (REC#1469978) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 12 7 2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5705939 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 12/05/2017 | PAID (REC#1469404) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Clarify ceiling details | MICHAELA | MICHAELA | | BSP | T | 5702288 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 11/14/2017 | ========store front area A need completed, airlock area A1.09, area A1.17 goods in/out and A1.00J, splice plan for roof top penthouse framing, need soils and all structural reports for foundation,walls, and steel ========== | NATHAN | NATHAN | | BFR | P | 5685260 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 10/24/2017 | rooftop penthouse framing not on plans, need plans spliced for as built, last of shaft and 3rd layer drywall completed over UPS rooms 1-4, backing at restrooms in A1.25 and 1.26 okay, rear framing completed at beam rooms B1.03, B1.06, B1.15, C1.03, C1.10. | NATHAN | NATHAN | | BFR | P | 5665733 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 10/18/2017 | ADDITIONAL PLAN REVIEW TIME: | JUSTINC | JUSTINC | | BSP | P | 5659218 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | BSP | T | 10/18/2017 | PAID (REC#1461036) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: approved for most recent deltas on each sheet | JUSTINC | JUSTINC | | BSP | T | 5659195 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 10/03/2017 | PAID (REC#1457096) PLAN SPLICE FEE: $75 by: TCRIPPEN for Plumbing: plumbing splice 10-3-2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5644095 |
DYNALECTRIC COMPANY | BSP | T | 09/27/2017 | PAID (REC#1456117) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added load bank, cable tray and associated feeders. Removed U.G. feeder to/from UPS. Various lighting and power revisions. Revised one-lines. Revised schedules. | BERTHA | BERTHA | | BSP | T | 5638195 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | T | 09/22/2017 | PAID (REC#1455256) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revised details - some added rated walls | MICHAELA | MICHAELA | | BSP | T | 5634580 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 09/12/2017 | =======need backing at all accessible restrooms, rooms not done are goods in/out office, facilities storage air lock and A1.00J.A area A okay otherwise with completed MEP's, all walls at area B okay with completed MEP's =========except last of Data Hall 4 for equipment and vehicle access ======== 3rd layer horizontal shaft drywall and 2nd layer sides are okay and completed. | NATHAN | NATHAN | | BFR | P | 5623545 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 09/06/2017 | soffit 3rd layer over UPS 3 room okay, walls at UPS 3 okay, framing at beam for 1 hr at rear wall okay from UPS 1-UPS 3 okay, provide ES report for intumescent thermal barrier to cover foam at roof and columns. | NATHAN | NATHAN | | BFR | P | 5617707 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 08/30/2017 | discussed use of Bayseal CCX at steel columns and roof around columns, use of spray foam material will be driven by IMC 602.2.1.5 in the plenum and 2009 IBC section 2603, check possibility of air flow issues with possible new plenum framing at lids, frame at rooms, walls rated other than IBC. B1.09,B1.07,B1.14,B1.11, need completed required inspections | NATHAN | NATHAN | | BFR | P | 5611817 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 08/25/2017 | Area A walls marked in pink with completed required inspections okay =========no rated walls in area A have been inspected until trades are installed======== horizontal shaft at UPS1 room bottom 3rd layer okay, UPS2 room bottom 2nd layer okay, exterior rock at DATA HALL 1&2 rated wall attachment okay==== need penetrations at DATA HALL walls on fire caulked, address how sprayfoam insulation can be used and protected in a rated assembly at DATA HALL plenum provide ES REPORT. | NATHAN | NATHAN | | BFR | P | 5607507 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 08/24/2017 | ----frame at horizontal shaft with completed MEP's along UPS rooms 1-4 okay, 1st layer bottom of UPS1 okay 2 layers sides of shaft UPS 1-2 okay, print and keep all rated listing for inspections, | NATHAN | NATHAN | | BFR | P | 5605976 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 08/07/2017 | PLAN SPLICE: (No Fee) by: DANM for Construction: Listed assembly for duct - 24" o.c. framing; listed assembly for beam rating at exterior wall - other than IBC | DANM | DANM | | BSP | P | 5588058 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | BSP | T | 08/07/2017 | PAID (REC#1444637) ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH splice to add damper framing detail | DALEH | DALEH | | BSP | T | 5587966 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 07/27/2017 | see page A101B for walls framed in specific detail / discussed damper framing and engineering requirement if details cannot be provided, with approved required inspections data hall 3, data hall 1-4 at J line 1 line J-H, H line 1-6 okay also grid E-J between 8 and 9 grid, changes to A900 sheet partition type H note 10,11 and 12 need spliced, #11 head of wall detail has been clarified as option. | NATHAN | NATHAN | | BFR | P | 5578385 |
J. E. DUNN CONSTRUCTION COMPANY | BFR | P | 07/10/2017 | frame of walls at rooms DATA HALL 1&2, SPRINKLER ROOM, and UPS R1 only with completed required inspections | NATHAN | NATHAN | | BFR | P | 5559277 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 06/30/2017 | NEW POINT OF CONTACT ANTHONY CORY 1-303-919-5863 / DAMPER FRAMING NEEDED IT WAS DISCUSSED WITH ANTHONY AND WILL NEED MECHANICAL INSPECTION | NATHAN | NATHAN | | BSP | P | 5552901 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 06/05/2017 | exterior precast installed A-J, 1-10 / store front not installed at 1-6,A-E. | NATHAN | NATHAN | | BSP | P | 5526001 |
J. E. DUNN CONSTRUCTION COMPANY | BSP | P | 04/17/2017 | progress report superstructure for area B steel columns and beams E-J 1-9. cast concrete wall being placed at south, east and north sides. | NATHAN | NATHAN | | BSP | P | 5477804 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 03/27/2017 | meet and greet for POC Andy Taylor / 3rd party inspections to happen on CMU and steel structure and foundations | NATHAN | NATHAN | | BFT | P | 5456883 |
J. E. DUNN CONSTRUCTION COMPANY | BFN | P | 11/18/2016 | AUTHORIZED THIRD PARTY INSPECTIONS // Engineer stamped letters to follow // CTL THOMPSON | JEREMYA | JEREMYA | | BFN | P | 5348211 |
J. E. DUNN CONSTRUCTION COMPANY | BFT | P | 11/18/2016 | AUTHORIZED THIRD PARTY INSPECTIONS // Engineer stamped letters to follow // CTL THOMPSON | JEREMYA | JEREMYA | | BFT | P | 5348210 |
DYNALECTRIC COMPANY | E= | C | 10/01/2018 | | BRIAN | BRIAN | | E= | C | 5982247 |
DYNALECTRIC COMPANY | E= | P | 09/21/2018 | NEED TO LABEL THE VOLTAGE OF EACH PANEL ON THAT PANEL----STILL NEED THE ARC FLASH REDUCTION METHOD PLAQUE ON ANY BREAKER 1200 AMPS OR GREATER----------------AIC --OK | BRIAN | BRIAN | | E= | P | 5973489 |
DYNALECTRIC COMPANY | E= | P | 08/22/2018 | GFCI TEST REPORTS FOR---GENERATOR R1--1--2---SWITCH GEAR--MSBR1--MSB2--MSB1--MSB4--MSB3--OK | BRIAN | BRIAN | | E= | P | 5941752 |
DYNALECTRIC COMPANY | E= | P | 08/20/2018 | LOUNGE OK----POLE LIGHTS OK-----NEED CORRECT AIC RATING AT EACH PANEL---NEED PERMANENT PLATFORM FOR RTU'S ----NEED GFCI TEST REPORTS UPLOADED ON GENERATORS AND MDP'S----NEED ARC FLASH REDUCTION PLAQUE ON ALL BREAKERS 1200 AMP OR GREATER--- | BRIAN | BRIAN | | E= | P | 5939873 |
DYNALECTRIC COMPANY | E= | R | 07/24/2018 | no test reports on site | SHELBY | SHELBY | | E= | R | 5912837 |
DYNALECTRIC COMPANY | ER | R | 07/24/2018 | no test reports on site | SHELBY | SHELBY | | ER | R | 5912830 |
DYNALECTRIC COMPANY | E= | P | 07/23/2018 | DATA HALLS --OK--ROOF OK--------NEED ARC FLASH/ AIC RATINGS--CAN NOT HAVE GFCI DEVICES BEHIND THE COOLERS---SHOWER TRIMS IN SHOWERS--2 SCREWS IN THE INDUSTRIAL COVERS---PANEL SCH---GFCI TEST REPORTS ON ALL MAINS------NEED OUTSIDE | BRIAN | BRIAN | | E= | P | 5910512 |
DYNALECTRIC COMPANY | E= | R | 07/20/2018 | | BRIAN | BRIAN | | E= | R | 5910181 |
DYNALECTRIC COMPANY | ER | R | 07/20/2018 | NO ONE ON SITE AT 6:15-- | BRIAN | BRIAN | | ER | R | 5910180 |
DYNALECTRIC COMPANY | ER | P | 05/16/2018 | REST OF THE GRID CEILINGS--OK | BRIAN | BRIAN | | ER | P | 5847041 |
DYNALECTRIC COMPANY | ER | P | 04/30/2018 | ADMIN CEILINGS--OK | BRIAN | BRIAN | | ER | P | 5831670 |
DYNALECTRIC COMPANY | ER | P | 04/23/2018 | CEILINGS--SEE PLANS----NOTE CAN NOT HAVE MORE THAN 6" OF CORD ABOVE THE CEILING FOR ADMIN CEILING LIGHTS----- | BRIAN | BRIAN | | ER | P | 5824765 |
SIEMENS INDUSTRY, INC. | E= | C | 04/18/2018 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 5820749 |
SIEMENS INDUSTRY, INC. | E= | C | 04/18/2018 | FIRE ALARM INSPECTION: ABOVE CEILING--OK | BRIAN | BRIAN | | E= | C | 5820748 |
SIEMENS INDUSTRY, INC. | ER | C | 04/18/2018 | FIRE ALARM INSPECTION: ABOVE CEILING--OK | BRIAN | BRIAN | | ER | C | 5820747 |
DYNALECTRIC COMPANY | ER | P | 03/19/2018 | CEILING IN DATA HALL 4---OK | BRIAN | BRIAN | | ER | P | 5793038 |
DYNALECTRIC COMPANY | EP | P | 03/12/2018 | PP1-4 --TBRT----OK | BRIAN | BRIAN | | EP | P | 5786601 |
DYNALECTRIC COMPANY | EP | P | 02/27/2018 | WINDOW WALL IN ADMIN | BRIAN | BRIAN | | EP | P | 5775622 |
DYNALECTRIC COMPANY | ER | P | 02/27/2018 | TRP2-3 --PP2-3--RP2-3---TRP1-3--TRMUP4--RPMU4-4---PP1-2--TLP1-2--LP1-2--TRP1-2--TRP1-2--RP1-2--LP1-2--PP2-1--TLP2-1--TLP2-1--LP2-1--PP2-1--TRP2-1---TRP2--RPP2-1--TRP2-1--RP2-1--TRPMU1-3--RPMU1-3--TRPMU1-3--RPMU1-3--- | BRIAN | BRIAN | | ER | P | 5775614 |
DYNALECTRIC COMPANY | ER | P | 02/21/2018 | CEILING IN DATA HALL 3----WEST WALL IN PENTHOUSE --- | BRIAN | BRIAN | | ER | P | 5770316 |
DYNALECTRIC COMPANY | ER | P | 02/15/2018 | REST OF WALLS AND HARD LID IN ADMIN--- | BRIAN | BRIAN | | ER | P | 5766888 |
DYNALECTRIC COMPANY | EUG | P | 02/15/2018 | ADMIN --OK | BRIAN | BRIAN | | EUG | P | 5766861 |
DYNALECTRIC COMPANY | EP | P | 01/29/2018 | DG3- TO DG4 ---MSB4- TO DG6---DP4-1 TO DG4---OK | BRIAN | BRIAN | | EP | P | 5750848 |
SIEMENS INDUSTRY, INC. | E= | P | 01/25/2018 | FIRE ALARM INSPECTION: ALL AREAS -- EXCEPT ADMIN -------NEED GRID CEILINGS IN ADMIN------ | BRIAN | BRIAN | | E= | P | 5747797 |
SIEMENS INDUSTRY, INC. | ER | P | 01/25/2018 | FIRE ALARM INSPECTION: ALL AREAS EXCEPT ADMIN OK ------ | BRIAN | BRIAN | | ER | P | 5747792 |
DYNALECTRIC COMPANY | EP | P | 01/23/2018 | TLP4-1 -- TLP3-1 -- TRP4-1 -- STS--LP3-1 -- PP4-1 --RP4-1 -- LP4-1 --OK | BRIAN | BRIAN | | EP | P | 5745548 |
DYNALECTRIC COMPANY | EP | P | 01/16/2018 | MSB-UPS4---TLP1-1 --TRP1-1 ---TLP2-1 ----TRP2-1 ---PP1-1---PP2-1 --RP1-1 ---PP2-2 --LP2-1--- | BRIAN | BRIAN | | EP | P | 5738994 |
DYNALECTRIC COMPANY | ER | P | 01/16/2018 | BATHROOM HARDLIDS--OK | BRIAN | BRIAN | | ER | P | 5738983 |
DYNALECTRIC COMPANY | EP | P | 01/11/2018 | DP1-1 TO GEN---DP2-1 TO GEN--DPR1-1 TO GEN---STS / PUU 4 -- | BRIAN | BRIAN | | EP | P | 5736224 |
DYNALECTRIC COMPANY | EP | P | 01/10/2018 | GEN R--GEN 1 & 2 ---OK -----DATA 4 BUSS DUCT---VFD/ PUMPS FOR COOLING TOWERS---- | BRIAN | BRIAN | | EP | P | 5734988 |
DYNALECTRIC COMPANY | EP | P | 01/08/2018 | STS / PDU 3---OK -----BUSS DUCT IN DATA 3---OK | BRIAN | BRIAN | | EP | P | 5732005 |
DYNALECTRIC COMPANY | ER | P | 01/08/2018 | CEILINGS IN DATA HALL 1 AND 2---OK | BRIAN | BRIAN | | ER | P | 5731991 |
DYNALECTRIC COMPANY | EUG | P | 01/02/2018 | POLE LIGHTS SOUTH AND WEST--OK | BRIAN | BRIAN | | EUG | P | 5726955 |
DYNALECTRIC COMPANY | EP | P | 01/02/2018 | TRANSFORMER--TRPMUI-1` --TRPMU2-2 ----OK PANELS--RPMU1-1 AND RPMU2-1--OK | BRIAN | BRIAN | | EP | P | 5726953 |
DYNALECTRIC COMPANY | ER | P | 12/29/2017 | HARD LIDS IN ADMIN----SEE PLANS | BRIAN | BRIAN | | ER | P | 5725859 |
DYNALECTRIC COMPANY | EP | P | 12/29/2017 | UPS40S- RESERVE ---DPMU4-2 ---DPMU41-2----REST OF THE ROOF DECK UNITS--- | BRIAN | BRIAN | | EP | P | 5725858 |
DYNALECTRIC COMPANY | EP | P | 12/26/2017 | BUS DUCT IN DATA 1 AND 2--SEE PLANS | BRIAN | BRIAN | | EP | P | 5722636 |
DYNALECTRIC COMPANY | ER | P | 12/20/2017 | WALLS IN ADMIN---- | BRIAN | BRIAN | | ER | P | 5719401 |
DYNALECTRIC COMPANY | ES | C | 12/20/2017 | Commercial Service: 3200 AMP 4-W ---OK TO SET METER AND POWER UTILITY TRANSFORMER #5 ---3CDCW-5 ------ | BRIAN | BRIAN | | ES | C | 5719400 |
DYNALECTRIC COMPANY | EP | P | 12/20/2017 | DPMU 4-1 ---DPMU4-2---RESERVE DPMUR1-2 ---NORMAL -DPMU3-1 ----DH3-1 DH3-2 DH3-3 DH3-4 DH3-5 ER2-1 -----OK | BRIAN | BRIAN | | EP | P | 5719399 |
DYNALECTRIC COMPANY | EP | P | 12/18/2017 | SEE PLANS---DPMU1-1 --DH1-1 --DH1-2 --DH1-3--DH1-4--DH1-5--ERI-1 ----DPMU1-2--DH2-1--DH2-2--DH2-3--DH2-4--DH2-5--ER1-2------STS/PDU --1A-1 --1A-2 --1B-1--1B-2--2A-1---2A-2---2B-1---2B-2--------MSB3--UPS OUTBOARD --DP3-1---DPMU3-1 --DPMU3-2---DPR1-1---UPSR10S1---UPSR10S2---DPR1-1---MGBR1----- | BRIAN | BRIAN | | EP | P | 5716428 |
DYNALECTRIC COMPANY | ES | P | 12/13/2017 | Commercial Service: 3200 AMP 4-W ----UTILITY TRANSFORMER # 3CDCW-4 ----OK TO SET METER -----MSB3 --OK TO MAIN -- | BRIAN | BRIAN | | ES | P | 5712262 |
DYNALECTRIC COMPANY | EP | P | 12/12/2017 | SEE PLANS---UPS20S--PP2-1 --DPMU2-1 ---ROTARY---DPMU1-1---OK ------------NOTE --NEED TO SPLICE THE PLANS FOR DPMU2-2 DROP FROM 800 AMP TO 400 AMP --- | BRIAN | BRIAN | | EP | P | 5710332 |
DYNALECTRIC COMPANY | ES | P | 12/12/2017 | Commercial Service: 3200 amp 4-w --utility transformer # 3CDCW-3 ----ok to set meter and energize | BRIAN | BRIAN | | ES | P | 5709498 |
DYNALECTRIC COMPANY | EP | P | 12/08/2017 | DP-1 , PP-1 , DPMU1-2 , MSB-1 , UPS10S, ---OK --- | BRIAN | BRIAN | | EP | P | 5708036 |
DYNALECTRIC COMPANY | ES | C | 12/08/2017 | Commercial Service: 3200 AMP 4-W ---TRANSFORMER T-2 ----MSB --OK TO SET METER----- | BRIAN | BRIAN | | ES | C | 5708027 |
DYNALECTRIC COMPANY | EP | P | 12/07/2017 | SEE PLANS---- FEEDERS FOR ----UPS RESERVE 1 ---UPS10S1---DPR1 ----UPSR10S2 ---DPURM1-2 ---DPURM1-1 ---- | BRIAN | BRIAN | | EP | P | 5706948 |
DYNALECTRIC COMPANY | ES | P | 12/07/2017 | Commercial Service: 3200 AMP 4-W --TRANSFORMER T-1---OK TO MSB1 | BRIAN | BRIAN | | ES | P | 5706934 |
DYNALECTRIC COMPANY | ES | P | 12/04/2017 | Commercial Service: 3200 AMP 4-W ---1 OF 5 --MSBR1----OK TO SET METER----- | BRIAN | BRIAN | | ES | P | 5702108 |
DYNALECTRIC COMPANY | ER | P | 11/14/2017 | data room 4 walls---ok | BRIAN | BRIAN | | ER | P | 5684002 |
DYNALECTRIC COMPANY | ER | P | 10/24/2017 | REST OF WALLS IN ADMIN ---OK | BRIAN | BRIAN | | ER | P | 5665948 |
SIEMENS INDUSTRY, INC. | ER | P | 10/20/2017 | FIRE ALARM INSPECTION: WALLS ---PIPE AND BOXES--- | BRIAN | BRIAN | | ER | P | 5662885 |
DYNALECTRIC COMPANY | ER | P | 09/21/2017 | WALLS --SEE PLANS---WALLS COMPLETE---- | BRIAN | BRIAN | | ER | P | 5633462 |
SIEMENS INDUSTRY, INC. | ER | P | 09/20/2017 | FIRE ALARM INSPECTION: SEE PLANS-- | BRIAN | BRIAN | | ER | P | 5631991 |
SIEMENS INDUSTRY, INC. | ER | P | 09/12/2017 | FIRE ALARM INSPECTION: WALLS --SEE PLANS ---PIPE AND BOXES ONLY------ | BRIAN | BRIAN | | ER | P | 5623877 |
DYNALECTRIC COMPANY | ER | P | 09/12/2017 | WALLS --SEE PLANS --OK | BRIAN | BRIAN | | ER | P | 5623872 |
DYNALECTRIC COMPANY | ER | P | 09/07/2017 | WALLS --SEE PLANS | BRIAN | BRIAN | | ER | P | 5619411 |
SIEMENS INDUSTRY, INC. | ER | P | 09/05/2017 | FIRE ALARM INSPECTION: SEE PLANS-- | BRIAN | BRIAN | | ER | P | 5616021 |
DYNALECTRIC COMPANY | ER | P | 08/31/2017 | WALLS ---SEE PLANS--OK | BRIAN | BRIAN | | ER | P | 5613417 |
SIEMENS INDUSTRY, INC. | ER | P | 08/29/2017 | FIRE ALARM INSPECTION: SHAFT WALLS --SEE PLANS ---HIGHLIGHTED IN PINK--- | BRIAN | BRIAN | | ER | P | 5610142 |
DYNALECTRIC COMPANY | ER | P | 08/28/2017 | WALLS SEE PLANS AND HARD LID/ SHAFT--OK | BRIAN | BRIAN | | ER | P | 5609418 |
SIEMENS INDUSTRY, INC. | ER | P | 08/23/2017 | FIRE ALARM INSPECTION: FIRE ALARM----SEE PLANS IN JOB TRAILER--- | BRIAN | BRIAN | | ER | P | 5605100 |
DYNALECTRIC COMPANY | ER | P | 08/21/2017 | SDS HARD LID --SEE PLANS -- | BRIAN | BRIAN | | ER | P | 5602429 |
DYNALECTRIC COMPANY | EUG | P | 08/16/2017 | soffit walls UPS 1 & 2 , 2 ufer per genpac x 5 | TOMC | TOMC | | EUG | P | 5597602 |
DYNALECTRIC COMPANY | EUG | R | 08/15/2017 | not ready | TOMC | TOMC | | EUG | R | 5596292 |
SIEMENS INDUSTRY, INC. | ER | P | 08/07/2017 | FIRE ALARM INSPECTION: WALLS SEE PLANS---PIPE AND BOXES ONLY NO WIRE---- | BRIAN | BRIAN | | ER | P | 5588387 |
DYNALECTRIC COMPANY | ER | P | 08/07/2017 | WALLS SEE PLANS ---- | BRIAN | BRIAN | | ER | P | 5588386 |
DYNALECTRIC COMPANY | EUG | P | 07/25/2017 | REST OF GENERATORS ---- | BRIAN | BRIAN | | EUG | P | 5575816 |
DYNALECTRIC COMPANY | EUG | P | 07/18/2017 | GEN 1 & 2 --RI AND LOAD BANK--OK---COULD NOT FIND PLANS TO HIGH LIGHT --- | BRIAN | BRIAN | | EUG | P | 5568467 |
DYNALECTRIC COMPANY | EUG | P | 06/21/2017 | SECONDARIES FROM TRANS TO GEAR --OK X 5 -- SEE PLANS-- | BRIAN | BRIAN | | EUG | P | 5542894 |
DYNALECTRIC COMPANY | ESL | P | 06/14/2017 | PVC IN ADMIN AREA--OK | BRIAN | BRIAN | | ESL | P | 5536126 |
DYNALECTRIC COMPANY | ESL | P | 06/07/2017 | ADMIN AREA---OK | BRIAN | BRIAN | | ESL | P | 5528816 |
DYNALECTRIC COMPANY | EUG | P | 06/01/2017 | REST OF SLAB--- | BRIAN | BRIAN | | EUG | P | 5523254 |
DYNALECTRIC COMPANY | EUG | P | 05/11/2017 | FEEDS FOR CONDENSER PUMPS--OK----N WEST CORNER OF BUILDING | BRIAN | BRIAN | | EUG | P | 5503757 |
DYNALECTRIC COMPANY | EUG | P | 05/08/2017 | pvc only marked on page E201B in blue | TOMC | TOMC | | EUG | P | 5498879 |
DYNALECTRIC COMPANY | EUG | P | 04/27/2017 | SEE PLANS--BLUE HIGH LIGHT---OK | BRIAN | BRIAN | | EUG | P | 5489566 |
DYNALECTRIC COMPANY | ESL | P | 04/14/2017 | SEE PLANS---PVC ONLY --NO WIRE | BRIAN | BRIAN | | ESL | P | 5476237 |
DYNALECTRIC COMPANY | EUG | P | 04/07/2017 | FEEDER CONDUITS----SEE PLANS IN OFFICE TRAILER-- | BRIAN | BRIAN | | EUG | P | 5468150 |
DYNALECTRIC COMPANY | EUG | P | 02/28/2017 | PARTIAL ---FEEDER CONDUITS FOR RTU---1 1/4" WITH GRC 90'S---- | BRIAN | BRIAN | | EUG | P | 5427511 |
DYNALECTRIC COMPANY | EUG | P | 02/09/2017 | LOW VOLT CONDUITS FOR DATA----OK | BRIAN | BRIAN | | EUG | P | 5411525 |
DYNALECTRIC COMPANY | EUG | P | 01/31/2017 | FOOTER GROUNDING RING----NORTH WALL--OK | BRIAN | BRIAN | | EUG | P | 5403291 |
DYNALECTRIC COMPANY | EUG | P | 01/18/2017 | PIER GROUNDING--4/0 COOPER---- | BRIAN | BRIAN | | EUG | P | 5392042 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 08/09/2018 | ELEVATOR COMPLETE | ERIC | ERIC | | HE= | C | 5929958 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | C | 07/27/2018 | CORRECTIONS MADE - SEE IMAGES | JERRYF | JERRYF | | H= | C | 5915719 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 07/26/2018 | PARTIAL FINAL PENDING PICTURES OF SECURED RETAINING ANGLE AT FLOOR MOUNTED DAMPERS AT ELEVATOR EQUIPMENT AREA NOTES: ROOF OK - ALL OTHER FIRE DAMPER RETAINAGE OK | JERRYF | JERRYF | | H= | P | 5914554 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 07/26/2018 | TAB REPORT LETTER RECEIVED | JERRYF | JERRYF | | HSP | P | 5914382 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 07/25/2018 | NEED LETTER FROM ENGINEER APPROVING ALL READINGS / SOME READINGS OUTSIDE +/- 10% - STILL TO TO INSPECT DAMPER RETAINAGE IN ADMIN AREA | JERRYF | JERRYF | | H= | P | 5912956 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 03/28/2018 | ABOVE CEILING SA / RA AND EXHAUST GRILLES OK IN ADMIN AREA / STILL NEED ALL GRID LABELED AT FIRE SMOKE DAMPERS - PENT HOUSE DUCT OK TO WRAP AND PENT HOUSE FIRE SMOKE DAMPER GAP OK AT FLOOR / STILL NEED RETAINING ANGLES INSTALLED | JERRYF | JERRYF | | HD | P | 5801029 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/26/2018 | M101A. ENTRY/WAITING: VRF1.23 AND SUPPLY TRUNK LINES AND LATERALS OK, OK TO WRAP. NO FLEX OR DIFFUSERS YET. STORAGE A1.06 AND A1.05: DAMPER IN TWO HOUR WALL OK, OK FOR ANGLES. M101B. GAS ROOM: VAV1.15 AND SUPPLY DUCT OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5748762 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/17/2018 | LOW PRESSURE TIE AND BOXES OK AT THE FOLLOWING CORRIDORS C1.00E AND B1.03 - NEED TO REINSPECT ALL F/SD RETAINAGE AND GAPS AT ADMIN AREA | JERRYF | JERRYF | | HD | P | 5739569 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/10/2018 | THIS INSPECTION WAS FOR THE FOLLOWING - ADMIN AREA SHOWER ROOMS A1.27 A1.28 ABOVE HARD LID OK | JERRYF | JERRYF | | HD | P | 5733846 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HRP | P | 01/03/2018 | REFRIGERATION PRESSURE TESTS AND ALL FINAL CONNECTIONS AT VRF 1 - 2 AND 3 OK | JERRYF | JERRYF | | HRP | P | 5727371 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/28/2017 | MEDIUM AND LOW PRESSURE MAINS AND RUN OUTS OK TO WRAP AT THE FOLLOWING VAV BOXES - C.100 -B AND C.100 - F | JERRYF | JERRYF | | HD | P | 5724522 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/18/2017 | 3 PRESSURE TESTS OK AND PIPING RAN PER PLAN ON THE FOLLOWING - ALL SOUTH END OF ROOF - CONDENSATE DRAIN / NON POTABLE WATER AND HUMIDIFIER | JERRYF | JERRYF | | HWP | P | 5715394 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HRP | P | 12/15/2017 | PRESSURE TEST AND PIPING OK RAN PER PLAN - ON VRF 2 CIRCUIT 1 - OK TO WRAP | JERRYF | JERRYF | | HRP | P | 5714325 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/12/2017 | ABOVE CEILING SA OK TO WRAP AT B1.00D | JERRYF | JERRYF | | HD | P | 5710373 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HRP | P | 12/12/2017 | PRESSURE TEST AND PIPING OK PER PLAN ON VRF CIRCUT #1 - OK TO INSULATE | JERRYF | JERRYF | | HRP | P | 5710369 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/07/2017 | THIS INSPECTION WAS FOR THE FOLLOWING - PRESSURE TESTS AND PIPING PER PLAN FOR VRF3 REFRIGERATION CIRCUIT OK TO INSULATE - PRESSURE TESTS AND PIPING OK TO INSULATE AT NORTH IDEC UNITS 50% OF ROOF UNITS ON HUMID / NON POTABLE AND CONDENSATE DRAINS | JERRYF | JERRYF | | HWP | P | 5705963 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/04/2017 | THE FOLLOWING ABOVE CEILING IS OK - SA MAIN AT CORRIDOR B1.00D - SA LOW PRESSURE AT CORRIDOR C1.00C - LOW PRESSURE SA / RA AND MEDIUM PRESSURE RA AT CORRIDOR C1.00D - RA / EXHAUST MAINS CORRIDOR C1.00E | JERRYF | JERRYF | | HD | P | 5701186 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/15/2017 | THE FOLLOWING ROOMS ARE OK IN ADMIN. AREA EXCLUDING DAMPER RETAINAGE - A1.04 - A1.02 - A1.03 - A1.01 - A1.35 - A1.34 - A1.33 - A1.00D - A1.25 - A1.26 - A1.22 - A1.21 - A1.18 - A1.20 - STILL NEED ALL DAMPER RETAINAGE | JERRYF | JERRYF | | HD | P | 5685681 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/07/2017 | 1 EXHAUST AND 1 RELIEF ELBOW AT WEST CORRIDOR AT DATA HALLS 3 AND 4 OK TO WRAP | JERRYF | JERRYF | | HD | P | 5678716 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/01/2017 | SPRINKLER ROOM 2: SUPPLY OK, OK TO WRAP. CORRIDOR B1.00C: SUPPLY/RETURN AIR OK, OK TO WRAP. CORRIDOR B1.00G: SUPPLY AIR OK, OK TO WRAP. CORRIDOR B1.00F: SUPPLY/RETURN AIR OK, OK TO WRAP. RETAINING ANGLES ON RETURN R-3 FOR DATA HALL 1 OK. | NANCY | NANCY | | HD | P | 5672965 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/24/2017 | ABOVE CEILING IN THE FOLLOWING AREA'S AND ROOMS OK TO WRAP - ROOMS A1.16 - A1.13 - A1/07 - A1.31 - A1.02 - SECURITY OFFICE - WEST CORRIDOR FOR DATA HALLS 1 AND 2 SUPPLY ELBOWS OK TO WRAP - STILL NEED ALL RETAINAGE AND ACCESS DOORS IN ADMIN AREA - | JERRYF | JERRYF | | HD | P | 5665430 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/11/2017 | ABOVE CEILING SA / RA OK TO WRAP IN THE FOLLOWING AREA'S - ADMIN OPEN AREA VRF A1.42-1 / VRF A1.4.2-2 / VRF A1. 43-3 - ALL ADMIN CORRIDORS - FIRE DAMPER AT CMU WALL TO STORAGE STILL NEED RETAINAGE | JERRYF | JERRYF | | HD | P | 5651306 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/10/2017 | 5 SA ELBOWS AT DATA HALL #4 OK TO WRAP - SA DUCT OK TO WRAP AND 2 F/SD INSTALLATION AND RETAINAGE OK IN DATA HALL 1 | JERRYF | JERRYF | | HD | P | 5650082 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/29/2017 | SA MAIN DUCT FOR DIAKEN RTU AT CORRIDOR AND DATA HALL 3 5 SA MAIN ELBOWS OK FOR WRAP | JERRYF | JERRYF | | HD | P | 5641088 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/22/2017 | ABOVE CEILING SA - EXHAUST AND RELIEF DUCTS OK TO WRAP IN UPS ROOM #4 | JERRYF | JERRYF | | HD | P | 5633746 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/20/2017 | THIS INSPECTION WAS FOR THE FOLLOWING AREA'S - UPS ROOM 3 SA / RELIEF AND EXHAUST ABOVE CEILING OK TO WRAP - CORRIDOR BETWEEN ROOM R1 AND UPS 2 ABOVE CEILING SA OK TO WRAP - RTU RETURN BETWEEN ROOM R1 AND UPS 1 ABOVE CEILING RA OK TO WRAP | JERRYF | JERRYF | | HD | P | 5631347 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/12/2017 | THE FOLLOWING IS OK TO WRAP - SA MAIN IN CORRIDOR OUTSIDE UPS ROOMS 1 AND 2 - RA MAIN IN CORRIDOR FOR UPS ROOMS 1 AND 2 - UPS ROOM 2 SA / RA AND EXHAUST OK TO WRAP - STILL NEED ALL F/D AND F/SD DUCT ACCESS DOORS AT FUTURE INSPECTION | JERRYF | JERRYF | | HD | P | 5622689 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/08/2017 | SA DUCT IN DATA HALL 1 OK FOR WRAP - HAD CONSULT WITH FRAMER AND SCRAPPY ON ADMIN AREA F/D AND F/SD FRAMING REQUIREMENTS | JERRYF | JERRYF | | HD | P | 5619659 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/07/2017 | SA / RA AND TRANSFER DUCT OK FOR WRAP IN UPS ROOM 1 - NEED ALL F/D FRAMED PER INSTALLED MANUAL IN ADMIN AREA / INSTRUCTED JACOB WITH M TECH ON PROPER FRAMING AND PROTECTION OF SPRAY FOAM IN DATA ROOM SUPPLY PLENUMS AND HOW PROTECTING | JERRYF | JERRYF | | HD | P | 5618345 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/30/2017 | SUPPLY AIR DUCTS IN THE FOLLOWING ROOMS ARE OK TO WRAP - R1 - UPS 1 AND 2 | JERRYF | JERRYF | | HD | P | 5611329 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/25/2017 | ABOVE CEILING OK TO WRAP ON DATA ROOM 2 ON 5 SUPPLY ELBOWS | JERRYF | JERRYF | | HD | P | 5606681 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/24/2017 | THE FOLLOWING IS OK - UPS ROOMS 1 - 2 - 3 AND 4 HORIZONTAL F/SD RETAINAGE - R1 F/SD FRAMING AT DOUBLE DOOR - DATA HALL 1 SUPPLY ELBOWS X 5 OK FOR WRAP | JERRYF | JERRYF | | HD | P | 5605440 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/22/2017 | R1 FRAMING STILL NEED HOLES IN STUDS PATCHED - NEED TO RE INSPECT ALL RETAINAGE AT ALL UPS ROOMS AT HORIZONTAL DAMPERS | JERRYF | JERRYF | | HD | P | 5602774 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/21/2017 | NEED R1 FRAMING CORRECTED ABOVE DOOR AT KING STUD - UPS 3 NEED HORIZONTAL SHAFT DAMPER ANGLES CORRECTED - THE FOLLOWING ARE OK - UPS ROOM 4 HORIZONTAL FRAMING AND RETAINAGE - UPS ROOMS 3 AND 4 VERTICAL FRAMING AT DAMPERS OK | JERRYF | JERRYF | | HD | P | 5601469 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/15/2017 | HORIZONTAL AND VERTICAL F/SD FRAMING AT UPS ROOMS 1 AND 2 AND R 1 OK HIGH LIGHTED IN RED ON PLANS INSPECTION DATED 8/15 - STILL NEED DAMPER CLOUDED IN RED ON PLANS | JERRYF | JERRYF | | HD | P | 5595963 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 08/10/2017 | HAD CONSULT WITH DESIGN TEAM AND JE DUNN ON FRAMING AT HORIZONTAL / VERTICAL AND DOUBLE DOOR FIRE SMOKE DAMPERS - DESIGN TEAM TO PROVIDE DETAIL NOTES ON DRAWINGS TO SHOW HOW HORIZONTAL / VERTICAL DAMPERS ARE SUPPORTED - FRAMING CAN CONTINUE AT CONTRACTORS ON RISK | JERRYF | JERRYF | | HSP | P | 5591579 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/08/2017 | HAD CONSULT WITH NANCY , ANDY FROM JE DUNN AND SCRAPPY FROM M TECH ON FIRE SMOKE DAMPER FRAMING - NEED ENGINEER TO PROVIDE DETAILS ON THE FOLLOWING - SPECIFIC DETAILS FOR F/SD FRAMING IN HORIZONTAL AT ELECTRIC ROOM - SPECIFIC DETAILS FOR VERTICAL SHAFT WALL FRAMING - SPECIFIC DETAILS FOR FRAMING ABOVE DOUBLE DOORS - ADDED NOTES ON 8/10 EXISTING FRAMING HAS BEEN REJECTED DUE TO NEEDING FURTHER CLARIFICATION ON DAMPER FRAMING FOR HORIZONTAL AND VERTICAL AND SHAFT WALL CONSTRUCTION AND SUPPORT ABOVE DOUBLE DOORS | JERRYF | JERRYF | | HD | P | 5588882 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/06/2017 | HAD CONSULT WITH MECH AND FRAMING CONTRACTORS ON F/SD FRAMING | JERRYF | JERRYF | | HD | P | 5556258 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/29/2017 | ABOVE CEILING SA DROPS OK TO WRAP IN THE FOLLOWING ELECTRIC ROOMS 1 THROUGH 4 - NEED SA SIDE WALL DUCT FIRE SMOKE DAMPERS FRAMED PER RUSKIN SHAFT WALL FRAMING SUPPLEMENT | JERRYF | JERRYF | | HD | P | 5550995 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/27/2017 | ABOVE CEILING SA / RA MAINS OK TO WRAP IN UPS ROOMS 3 AND 4 - STILL NEED ALL BRANCH LINES AND F/SD INSTALLED | JERRYF | JERRYF | | HD | P | 5547940 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/21/2017 | ABOVE CEILING RETURN AIR MAIN AT ELECTRIC ROOM #2 OK TO WRAP HIGH LIGHTED IN PINK ON M TECH PLANS - STILL NEED ALL F/SD | JERRYF | JERRYF | | HD | P | 5542215 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/19/2017 | ABOVE CEILING OK FOR WRAP ON THE FOLLOWING - UPS ROOM #1 RETURN AIR MAIN - UPS ROOMS #1 AND 2 SUPPLY MAIN - HIGH LIGHTED IN YELLOW ON PAGE MTM101-B ON M TECH PLANS DATED 6/19 - STILL NEED F/SD FRAMING AND DAMPER INSPECTION | JERRYF | JERRYF | | HD | P | 5539947 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/02/2017 | PRESSURE TEST OK ON ALL ROOF MAIN LINES OK TO INSULATE ALL HIGH LIGHTED IN ORANGE ON PAGE M202B ON JE DUNN CONSTRUCTION PLANS- STILL NEED ALL FINAL CONNECTIONS AT UNITS | JERRYF | JERRYF | | HD | P | 5524298 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 05/11/2017 | 9 PRESSURE TESTS ON UNDER GROUND LINES FROM STORAGE TANKS TO INSIDE BUILDING | JERRYF | JERRYF | | HWP | P | 5503063 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 02/28/2017 | 3 UNDER GROUND TANKS OK FOR BURIAL | JERRYF | JERRYF | | HWP | P | 5426699 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 08/02/2018 | corrections made | JOHNS | JOHNS | | P= | C | 5922104 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/16/2018 | pending security bath lav and roof drain hanger, rest ok. note: floor drains are trap primed, open site floor drains as indicated on plans / fixture schedule, and @ plan page P001 material schedule allows sch 40 pvc underground. ins note- (c) prd @ next inspection | JOHNS | JOHNS | | P= | P | 5903223 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 03/02/2018 | Ok. Note: check 2 - roof drain hangers in mechanical room at final, still need engineer letter for pvc underground. | DANR | DANR | | PTO | C | 5778610 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/29/2017 | all roof drains o.k less 2 hangers in water entry | JOEL | JOEL | | PRD | P | 5697346 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/20/2017 | shower valves and mop sink water piping o.k, still need engineers letter for pvc underground | JOEL | JOEL | | PTO | P | 5661826 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/13/2017 | Area A - Test and design OK,( minus water entry room ) need shower valves and mop sink water lines roughed-in, need engineers letter for underground PVC, Area B - sprinkler rooms and elevator drain DWV test OK, need clarification on mechanical equipment hub drains | SHANEN | SHANEN | | PTO | P | 5624270 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 05/31/2017 | Partial P100A underground test OK | SHANEN | SHANEN | | PRD | P | 5520936 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 05/31/2017 | P301 detail #5 and P302 #1 test OK, base complete | SHANEN | SHANEN | | PB | C | 5520907 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 05/24/2017 | Admin area roof drain underground on test, OK | SHANEN | SHANEN | | PRD | P | 5515401 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/24/2017 | Security office restroom and pantry OK, 6" water mains and 2" irrigation in water entry room OK, | SHANEN | SHANEN | | PB | P | 5515386 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/08/2017 | Partial - Plan page P301 detail #1 - underground to plan | SHANEN | SHANEN | | PB | P | 5498760 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 04/13/2017 | 6 inch trunk line complete, sprinkler rooms 1 & 2 ok, open site drain next to stair wall ok, plans marked. | TAYLOR | TAYLOR | | PB | P | 5474789 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/22/2017 | partial 6 inch trunk line ok, plans marked. | TAYLOR | TAYLOR | | PB | P | 5422335 |
J. E. DUNN CONSTRUCTION COMPANY | XBS | T | 08/22/2018 | PAID (REC#1530219) PLAN SPLICE FEE: $50 by: DANM for Construction: Penthouse framing for elevator stairs and new canopy framing at entry | DANM | DANM | | XBS | T | 5941796 |
DYNALECTRIC COMPANY | XES | T | 07/11/2018 | PAID (REC#1517578) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised one line sheets E 401F, 401B, 401C, 401D, 401E ( Feeders 400-3GP, 150-4GT, 800-3G) | SHELBY | SHELBY | | XES | T | 5899967 |
J. E. DUNN CONSTRUCTION COMPANY | XBS | T | 04/05/2018 | PAID (REC#1494592) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise elevator walls to 1-hr - remove rating from stairs | MICHAELA | MICHAELA | | XBS | T | 5808730 |