HAIGH CONSTRUCTION, INC. | B= | C | 04/18/2017 | All finals completed | NELIDA | NELIDA | | B= | C | 5479227 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 04/04/2017 | PAID (REC#1414515): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 4-4-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5464910 |
HAIGH CONSTRUCTION, INC. | B= | P | 03/31/2017 | Temp CO: moving in ( Expires: 4/30/2017 12:00:00 AM) | RITA | RITA | | B= | P | 5461220 |
HAIGH CONSTRUCTION, INC. | B= | P | 03/30/2017 | Building final complete pending plumbing and fire. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), FRONTIER MECHANICAL SYSTEMS INC Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5460824 |
ONI COMPANIES, LLC | BSP | T | 03/14/2017 | PAID (REC#1409744) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Remove existing receptacles - non health grade. | BERTHA | BERTHA | | BSP | T | 5440143 |
HAIGH CONSTRUCTION, INC. | BFR | P | 01/17/2017 | Framing in suite 200 OK // Discussed accessible elements with contractor | JEREMYA | JEREMYA | | BFR | P | 5390732 |
HAIGH CONSTRUCTION, INC. | BFR | P | 01/09/2017 | Interior framing west side of 2nd floor OK // Training with Rich B. | JEREMYA | JEREMYA | | BFR | P | 5384833 |
ONI COMPANIES, LLC | E= | C | 03/16/2017 | | MATTHEW | MATTHEW | | E= | C | 5443426 |
DILLER ELECTRIC LLC | E= | C | 03/13/2017 | FIRE ALARM INSPECTION: | MATTHEW | MATTHEW | | E= | C | 5438473 |
DILLER ELECTRIC LLC | ER | C | 03/13/2017 | FIRE ALARM INSPECTION: fire alarm rough ok | MATTHEW | MATTHEW | | ER | C | 5438471 |
DILLER ELECTRIC LLC | E= | C | 03/13/2017 | FIRE ALARM INSPECTION: fire alarm rough ok | MATTHEW | MATTHEW | | E= | C | 5438472 |
ONI COMPANIES, LLC | E= | P | 03/08/2017 | existing outlets in exam room are shown to remain: need plans spliced showing outlets to be removed and blanked (not hospital grade mc and within 6' of sinks), (2) fridge outlets within 6' of sink need gfci protection (B34 and B36); do not install gfci test behind appliance, need accurate panel schedule | MATTHEW | MATTHEW | | E= | P | 5435073 |
ONI COMPANIES, LLC | ER | C | 03/02/2017 | | MATTHEW | MATTHEW | | ER | C | 5429897 |
ONI COMPANIES, LLC | ER | R | 03/01/2017 | inspected ceiling: need to clip lights to grid, grid wires need to be attached on both ends, need clear working space at fcu's, wire opposite corners | MATTHEW | MATTHEW | | ER | R | 5428886 |
ONI COMPANIES, LLC | ER | P | 02/21/2017 | remove receptacles above ceiling | TOMC | TOMC | | ER | P | 5419768 |
ONI COMPANIES, LLC | EP | C | 02/06/2017 | 400 amp sub-panel ok | MATTHEW | MATTHEW | | EP | C | 5407007 |
ONI COMPANIES, LLC | EP | R | 02/03/2017 | need equipment ground in each raceway | MATTHEW | MATTHEW | | EP | R | 5406219 |
ONI COMPANIES, LLC | ER | P | 01/26/2017 | all of hard lids | GARYL | GARYL | | ER | P | 5399886 |
ONI COMPANIES, LLC | ER | P | 01/13/2017 | walls ok---- I looked at boxes for F/A | MATTHEW | MATTHEW | | ER | P | 5388898 |
ONI COMPANIES, LLC | ER | P | 01/06/2017 | walls marked on approved plans------------------VERIFY MC BETWEEN BOXES FOR LIGHTING CIRCUIT HAS BEEN REPLACED WITH HOSPITAL GRADE MC; RAN ON TOP OF WALL | MATTHEW | MATTHEW | | ER | P | 5383893 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 03/29/2017 | MECHANICAL FINAL OK. ENGINEER LETTER APPROVING BALANCE REPORT READINGS RECEIVED AND SCANNED, SEE IMAGES. | NANCY | NANCY | | H= | C | 5458560 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/27/2017 | TEST AND BALANCE REPORT RECEIVED. MULTIPLE READINGS OUTSIDE OF +/- 10% ALLOWED. NEED REVISED REPORT OR LETTER FROM ENGINEER APPROVING THESE READINGS. | NANCY | NANCY | | H= | P | 5455917 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/08/2017 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5435615 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/01/2017 | CANCELED AT CALL AHEAD, NOT READY, WORK NOT COMPLETE ACROSS STAIRWELL. | NANCY | NANCY | | H= | P | 5428621 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/21/2017 | ABOVE CEILING ALL OK EXCEPT STILL NEED TO SEE STAIRWELL AREA. | NANCY | NANCY | | HD | P | 5420301 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/25/2017 | WEST END. TRUNK LINES AND LATERALS OK, OK TO WRAP. SUPPLY AND EXHAUST ABOVE BATHROOM HARD LID OK. STILL NEED TO SEE EXHAUST ACROSS STAIR WELL. NO FLEX, DIFFUSERS OR VAV'S YET. | NANCY | NANCY | | HD | P | 5398556 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/19/2017 | ABOVE CEILING LOW PRESSURE RUN OUTS OK ON EAST SIDE OK | JERRYF | JERRYF | | HD | P | 5393202 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | L | 01/18/2017 | ABOVE CEILING OK ON THE FOLLOWING - ALL LOW PRESSURE MAIN DUCT RUNS - STILL NEED ALL RUN OUTS - BOXES / MEDIUM PRESSURE DUCT CONNECTIONS AND EXHAUST DUCT | JERRYF | JERRYF | | HD | L | 5392220 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 04/06/2017 | aav at sinks | TED | TED | | P= | C | 5465987 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 04/05/2017 | can not pull up splice at this time, will check in the morning and complete it if it is good | TED | TED | | P= | P | 5465529 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 03/24/2017 | NEED PLANS CHANGED AS PREVIOUSLY NOTED AT TOP OUT , REST OK . ALL SINKS ARE TEMPERED , ALL TO PLAN | GABE | GABE | | P= | P | 5455193 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 01/09/2017 | correction made will need plan change on sinks to aav from vent through roof by final | TED | TED | | PTO | C | 5384358 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 01/06/2017 | lost test on east side dwv, need 5 foot head test on 2 sinks north west side, need west side sinks changed to aav on plan from vent through roof, water piping ok | TED | TED | | PTO | P | 5383915 |