PALACE HOMES, INC. | B= | C | 11/07/2017 | Soils on file | NICK | NICK | | B= | C | 5678417 |
PALACE HOMES, INC. | B= | P | 11/06/2017 | Still need soils report / All other items for final OK -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5677248 |
PALACE HOMES, INC. | B= | P | 11/03/2017 | Complete BFD // Need code compliant handrail on lower flight of stairs at front porch -- Schedule a new Building Final when above items are complete. | SHAUN | SHAUN | | B= | P | 5675821 |
PALACE HOMES, INC. | B= | P | 10/31/2017 | Need to seal penetrations in garage lid / Need to install continous handrail for front entry deck stairs / Need to install window well guard for window well within 36" of back patio / Egress for basement bedroom window over 44", at 45 1/2" at time of inspection -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5672012 |
PALACE HOMES, INC. | BFR | P | 08/30/2017 | Splice in place for side deck frame / Frame OK per plans | NICK | NICK | | BFR | P | 5611525 |
PALACE HOMES, INC. | BSP | P | 08/30/2017 | No foundation design on file at time of inspection and not on site / Piers in place are 4 16" piers at front entry 36" in depth / Still need soils report and foundation design for file / Poor at own risk | NICK | NICK | | BSP | P | 5611521 |
PALACE HOMES, INC. | BSP | T | 08/15/2017 | PAID (REC#1446484) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Changed patio to deck. | BPHILLIPS | BPHILLIPS | | BSP | T | 5596281 |
PALACE HOMES, INC. | BLA | C | 07/05/2017 | | NICK | NICK | | BLA | C | 5554675 |
PALACE HOMES, INC. | BSP | P | 06/30/2017 | Letter on file from architect for 4 LVL beam at kitchen, deck, and new hanger for truss at garage / Still need to splice plans with changes / All items OK per letter | NICK | NICK | | BSP | P | 5552394 |
PALACE HOMES, INC. | BIN | P | 06/26/2017 | Insulation OK / Need all frame items OK | NICK | NICK | | BIN | P | 5546496 |
PALACE HOMES, INC. | BFR | P | 06/21/2017 | Need to splice plans to show new deck lower level, added windows main level bathroom and front under 3 LVL, and upper window / Need Eng letter for triple LVL hanger at garage entry / Need Eng letter for triple LVL at kitchen in place of post per plans / Need welding report / Need electrical complete / OK to insulate once electrical complete | NICK | NICK | | BFR | P | 5542264 |
PALACE HOMES, INC. | BSP | P | 06/20/2017 | Walk job for trusses / Walked all of S3 sheet roof frame / Need to complete dry in of roof plumbing jacks / Need letter for hanger for triple LVL at D trusses / All other roof frame OK | NICK | NICK | | BSP | P | 5540821 |
PALACE HOMES, INC. | BSP | P | 05/18/2017 | All exterior porch and decks OK | NICK | NICK | | BSP | P | 5510497 |
PALACE HOMES, INC. | BSP | P | 04/18/2017 | No plans on site and could not upload plans on computer for inspection / At time of inspection there were 6 piers at front of house that were all 16" in diameter | NICK | NICK | | BSP | P | 5479010 |
PALACE HOMES, INC. | BSP | T | 04/17/2017 | PAID (REC#1425421) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised heat loss calculations and duct design same equipment | JUSTINC | JUSTINC | | BSP | T | 5478290 |
PALACE HOMES, INC. | BSP | T | 04/12/2017 | PAID (REC#1417710): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Expanded basement area into previous crawlspace. | SHELLEY | SHELLEY | | BSP | T | 5472281 |
PALACE HOMES, INC. | BFD | P | 04/11/2017 | Drain of usable space OK, daylights to front of house both sides / Still need soils report | NICK | NICK | | BFD | P | 5470956 |
PALACE HOMES, INC. | BFI | C | 04/11/2017 | R-10 at 2' OK | NICK | NICK | | BFI | C | 5470951 |
PALACE HOMES, INC. | BFT | C | 04/06/2017 | Architect letter on file for use of extra rebar in footing and foundation over soft spot | NICK | NICK | | BFT | C | 5465988 |
PALACE HOMES, INC. | BFN | P | 04/03/2017 | Open hole on file / Still need soils report / Need Eng for soft spot | NICK | NICK | | BFN | P | 5462866 |
PALACE HOMES, INC. | BFT | P | 03/31/2017 | Open hole states there is a soft spot at south corner of house, contractor installed more rebar in foundation wall for this section, need Eng letter stating as designed OK and observation from Eng to OK as built / All other foundation OK / Need open hole and soils on file | NICK | NICK | | BFT | P | 5461449 |
PALACE HOMES, INC. | BFT | P | 03/31/2017 | Need open hole with correct address, address on current form is 818, permit address is 811 / #2000psf / Drain usable | NICK | NICK | | BFT | P | 5461029 |
PALACE HOMES, INC. | BFT | P | 03/22/2017 | Need stamped open hole // pour at own risk | LINDSEY | LINDSEY | | BFT | P | 5452310 |
PALACE HOMES, INC. | BFT | R | 03/21/2017 | not ready | LINDSEY | LINDSEY | | BFT | R | 5446501 |
ROWAN ELECTRIC LLC | E= | C | 10/27/2017 | | JOHNN | JOHNN | | E= | C | 5670071 |
ROWAN ELECTRIC LLC | E= | R | 10/25/2017 | line to well pressure switch: reroute to protect from physical damage, add blocking below sub panels, need all screws for panel covers, outside front door missing outlet, is there a gfci for washer,where? | JOHNN | JOHNN | | E= | R | 5667249 |
ROWAN ELECTRIC LLC | ES | C | 06/21/2017 | Residential Underground: 200-amp 3 Wire service, ok to set meter / ,rev ufer near meter, | JOHNN | JOHNN | | ES | C | 5543157 |
ROWAN ELECTRIC LLC | ER | C | 06/21/2017 | | JOHNN | JOHNN | | ER | C | 5543144 |
ROWAN ELECTRIC LLC | ES | R | 06/20/2017 | not ready | JOHNN | JOHNN | | ES | R | 5540431 |
ROWAN ELECTRIC LLC | ER | T | 06/20/2017 | PAID (REC#1433324): not ready | JOHNN | JOHNN | | ER | T | 5540426 |
ROWAN ELECTRIC LLC | ES | R | 06/15/2017 | Residential Underground: NEED TO INSTALL METER SOCKET ---COMPLETE SERVICE RE INSPECT | BRIAN | BRIAN | | ES | R | 5536670 |
ROWAN ELECTRIC LLC | ER | R | 06/15/2017 | NEED THE CENTRAL VAC INSTALLED ------NOTES -----FINISHED BASEMENT ---- | BRIAN | BRIAN | | ER | R | 5536656 |
AIR CONCEPTS HEATING & COOLING | H= | C | 10/18/2017 | DIRECT VENT FURN,NO A/C HI/LO TRANSFER FINISHED BASEMENT 6"OSA | DAVIDH | DAVIDH | | H= | C | 5659283 |
AIR CONCEPTS HEATING & COOLING | HC | C | 06/07/2017 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 5528042 |
AIR CONCEPTS HEATING & COOLING | HRR | C | 06/07/2017 | DIRECT VENT FURNS, NOTE NO A/C, FINISHED BASEMENT 6"OSA | DAVIDH | DAVIDH | | HRR | C | 5528028 |
SPRINGS GAS, INC. | HI | C | 05/25/2017 | 10 LB TEST OK NOTE 1 1/4" LINE 1 W/H,GARAGE HEATER,FREE STANDING FIREPLACE,C/T AND 2 FURN | DAVIDH | DAVIDH | | HI | C | 5516871 |
GLASER ENERGY GROUP INC. | HO | P | 05/18/2017 | ADDRESS IS WRONG NEEDS CHANGED TO 818 NOT 811. 10 LB TEST OK OK | DAVIDH | DAVIDH | | HO | P | 5510264 |
GLASER ENERGY GROUP INC. | HO | R | 05/16/2017 | NO ACCESS ROAD WORK | DAVIDH | DAVIDH | | HO | R | 5507742 |
JOLLY PLUMBING & HEATING INC. | P= | C | 10/27/2017 | corrections made, see images, potable water certificate sent to scanning. | TAYLOR | TAYLOR | | P= | C | 5668977 |
JOLLY PLUMBING & HEATING INC. | P= | P | 10/24/2017 | install T&P drains, need aav and hub drain at upstairs furnace room, need potable water certificate, rest ok, finished basement, no irrigation. | TAYLOR | TAYLOR | | P= | P | 5665769 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 06/05/2017 | corrections made. | TAYLOR | TAYLOR | | PTO | C | 5526198 |
JOLLY PLUMBING & HEATING INC. | PTO | P | 05/26/2017 | undersized wet vent at toilet for upstairs guest bathroom, need freeze protection at water lines for kitchen and master shower head, re- grade lav drains at upstairs guest bathroom, rest ok, finished basement, aav's at all lavs/ sinks except for powder lav and guest bath lavs, need aav at upstairs furnace room. | TAYLOR | TAYLOR | | PTO | P | 5518164 |
JOLLY PLUMBING & HEATING INC. | PB | C | 04/19/2017 | | TAYLOR | TAYLOR | | PB | C | 5480291 |
PALACE HOMES, INC. | PWO | C | 04/19/2017 | need potable water certificate by final. | TAYLOR | TAYLOR | | PWO | C | 5480290 |