MAHLER GC GENERAL CONTRACTING COMPANY | B= | C | 07/28/2017 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5579932 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 07/27/2017 | PAID (REC#1442490): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 7-1-27-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5578257 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 06/15/2017 | Building final complete pending other final inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5537149 |
INTERMOUNTAIN POWER SERVICES INC | BSP | P | 05/23/2017 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | P | 5514264 |
MAHLER GC GENERAL CONTRACTING COMPANY | BSP | T | 05/23/2017 | PAID (REC#1426583) PLAN SPLICE FEE: $50 by: DANM for Construction: Revise double door to single and misc details | DANM | DANM | | BSP | T | 5514202 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | P | 05/23/2017 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: splice for delta 3 | DALEH | DALEH | | BSP | P | 5514155 |
INTERMOUNTAIN POWER SERVICES INC | BSP | P | 05/03/2017 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | P | 5495220 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | P | 05/03/2017 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | BSP | P | 5495058 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 05/03/2017 | PAID (REC#1422039) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: delta 1 and delta 2 | JUSTINC | JUSTINC | | BSP | T | 5495037 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 04/12/2017 | Wall framing OK pending ALL other rough inspections | JEREMYA | JEREMYA | | BFR | P | 5472862 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 06/07/2017 | CU-1,30/2 in panel MOP 30 MCA 18-----CU-2,20/2 in panel MOP 20 MCA 12--- | ROB | ROB | | E= | C | 5528555 |
INTERMOUNTAIN POWER SERVICES INC | ER | C | 06/07/2017 | Completed ceilings | ROB | ROB | | ER | C | 5528554 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 05/26/2017 | ceilings only | GARYL | GARYL | | ER | P | 5518785 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 04/12/2017 | walls ok | MATTHEW | MATTHEW | | ER | P | 5472936 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 07/28/2017 | TEST AND BALANCE REPORT RECEIVED . | LIDO | LIDO | | H= | C | 5579931 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 07/27/2017 | TEST AND BALANCE DOES NOT MATCH STAMPED SET PLANS , OUTSIDE AIR ON TEST AND BALANCE REPORT SENT IS NOT WITHIN THE 10 % PLUS OR MINUS . | LIDO | LIDO | | H= | P | 5577444 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 06/02/2017 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5524394 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/26/2017 | RETURN AIR GRILL OR RETURN AIR PATH FOR OFFICES 127 AND 128? INSTALL ALL DAMPER MOTORS. REST OF ABOVE CEILING OK, OK TO COMPLETE WRAP. WILL NEED ACCESS TO STAIR WELL AND ROOF. | NANCY | NANCY | | HD | P | 5518801 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/04/2017 | ABOVE CEILING DUCT INSPECTION: No revised plans on site. Plans show linesets going into corridor and up and linesets were ran into stairwell instead - is this ok? If so will need to show on plans. What is 12" square jumper between existing 30x16 and 12x16? not shown on plans. HIGH/LOW PRESSURE DUCTING ABOVE CEILING OK TO WRAP. No diffusers, flex or VAV's installed at this time. Outside air not through building exterior at this time | MARKB | MARKB | | HD | P | 5496120 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/25/2017 | ABOVE CEILING DUCT - Need plan splice for deleted/changed equipment and changed duct. BOTH 12" ROUND SUPPLY TRUNKS ON AHU-2 OK TO WRAP. | MARKB | MARKB | | HD | P | 5486640 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/20/2017 | not ready too many rooms are missing supply air duct also 12'' supply from unit number one is not connected call when ready,, | LUKE | LUKE | | HD | P | 5482389 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/19/2017 | No contact at call ahead at 4:10. Contractor to reschedule | MARKB | MARKB | | HD | P | 5480945 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/07/2017 | ok. | CRADE | CRADE | | P= | C | 5528272 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 04/06/2017 | base design and test ok | TED | TED | | PB | C | 5466863 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/06/2017 | water and dwv in walls ok | TED | TED | | PTO | P | 5466860 |