EPIC CONSTRUCTION, INC. | B= | C | 08/31/2017 | openhole report on file 4000 psf | NATHAN | NATHAN | | B= | C | 5612455 |
EPIC CONSTRUCTION, INC. | B= | R | 08/18/2017 | need stamped open excavation letter | NATHAN | NATHAN | | B= | R | 5600803 |
EPIC CONSTRUCTION, INC. | BSP | T | 08/16/2017 | PAID (REC#1446663) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice 8-16-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5596971 |
EPIC CONSTRUCTION, INC. | B= | P | 07/27/2017 | Temp CO: PENDING FINALS ( Expires: 8/26/2017 12:00:00 AM) | RITA | RITA | | B= | P | 5578390 |
EPIC CONSTRUCTION, INC. | BSP | P | 07/13/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised lighting layout. | BERTHA | BERTHA | | BSP | P | 5563641 |
EPIC CONSTRUCTION, INC. | BSP | T | 07/13/2017 | PAID (REC#1442444) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add drop ceiling | MICHAELA | MICHAELA | | BSP | T | 5563556 |
EPIC CONSTRUCTION, INC. | B= | P | 06/29/2017 | Temp CO: partial finals ( Expires: 7/29/2017 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5550299 |
EPIC CONSTRUCTION, INC. | BIN | C | 06/28/2017 | | NATHAN | NATHAN | | BIN | C | 5549869 |
EPIC CONSTRUCTION, INC. | BFR | C | 06/28/2017 | | NATHAN | NATHAN | | BFR | C | 5549868 |
EPIC CONSTRUCTION, INC. | B= | P | 06/28/2017 | add exit light at beginning of hall / need stamped openex / complete exterior finish at drive up window / complete all required inspections -- Schedule a new Building Final when above items are complete. | NATHAN | NATHAN | | B= | P | 5549850 |
EPIC CONSTRUCTION, INC. | BFR | P | 06/14/2017 | frame of soffit at rear sales counter wall okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5535616 |
EPIC CONSTRUCTION, INC. | BIN | P | 06/14/2017 | drive thru walls | NATHAN | NATHAN | | BIN | P | 5535559 |
EPIC CONSTRUCTION, INC. | BSP | P | 06/13/2017 | hard lid and furred framing at drive thru, above ceiling inspection throughout okay with all completed required inspections | NATHAN | NATHAN | | BSP | P | 5534027 |
EPIC CONSTRUCTION, INC. | BSP | P | 06/13/2017 | drive though window lentil okay | NATHAN | NATHAN | | BSP | P | 5534007 |
EPIC CONSTRUCTION, INC. | BSP | P | 05/26/2017 | Met contractor on site / No need for roof deck inspection | NICK | NICK | | BSP | P | 5518357 |
EPIC CONSTRUCTION, INC. | BFR | P | 05/24/2017 | Items for exterior addition framing OK / Need all MEP's complete | NICK | NICK | | BFR | P | 5516176 |
EPIC CONSTRUCTION, INC. | BFR | P | 05/23/2017 | Hard lid framing for restrooms OK / Need electrical complete for lids | NICK | NICK | | BFR | P | 5514737 |
EPIC CONSTRUCTION, INC. | BSP | R | 05/23/2017 | Addition frame inspection / Need to install steel screw anchors for ledger and teks screws for track per A-3001 / Box headers pre insulated / | NICK | NICK | | BSP | R | 5514736 |
EPIC CONSTRUCTION, INC. | BSP | P | 05/17/2017 | No need for screw inspection / Reviewed with contractor need for splice per last inspection comments / Still need to inspect exterior addition framing | NICK | NICK | | BSP | P | 5509763 |
EPIC CONSTRUCTION, INC. | BFR | P | 05/12/2017 | with completed required inspections frame is okay / backing has been replaced / letters and splices still needed. | NATHAN | NATHAN | | BFR | P | 5505375 |
EPIC CONSTRUCTION, INC. | BFR | P | 05/11/2017 | remove and replace lumber backing with fire rated wood this is type 2B construction / need engineer letter for RTU reinforcement observation and open excavation / splice plan for soffit cloud and provide construction details for attachment / | NATHAN | NATHAN | | BFR | P | 5503597 |
EPIC CONSTRUCTION, INC. | BFT | P | 05/02/2017 | with stamped openex grade beam forms and foundation insulation okay | NATHAN | NATHAN | | BFT | P | 5493700 |
FOSTER ELECTRIC CORPORATION | E= | C | 06/29/2017 | | BRIAN | BRIAN | | E= | C | 5551565 |
FOSTER ELECTRIC CORPORATION | E= | P | 06/28/2017 | ONLY THE SERVING AND LOUNGE OK----NEED CORRECT PANEL SCH --DISCONNECT ON ICE CON ---NEED TO RUN FLEX ALL THE WAY THROUGH THE RTU UNITS----OPEN J BOXES IN BACK CEILING ---NO POWER TO BATH GFCI-----NEED LOCKABLE SWITCH FOR SIGN------HANDEL TIES----- | BRIAN | BRIAN | | E= | P | 5549784 |
FOSTER ELECTRIC CORPORATION | EP | C | 06/27/2017 | NEED HANDEL TIES BY FINAL---- | BRIAN | BRIAN | | EP | C | 5548273 |
FOSTER ELECTRIC CORPORATION | ER | P | 06/19/2017 | KITCHEN CEILINGS AND PIPE THROUGH THE OTHER SUITS----OK | BRIAN | BRIAN | | ER | P | 5539984 |
FOSTER ELECTRIC CORPORATION | EUG | P | 06/16/2017 | pvc conduit for drive-up | TOMC | TOMC | | EUG | P | 5537756 |
FOSTER ELECTRIC CORPORATION | ER | P | 06/12/2017 | hard lid i front and drive-up area | TOMC | TOMC | | ER | P | 5532348 |
FOSTER ELECTRIC CORPORATION | ES | C | 06/05/2017 | Commercial Service: 400 AMP 4-W ---OK TO SET CT'S AND METER-----------NOTE-----OK UP TO MAIN DISCONNECT--- | BRIAN | BRIAN | | ES | C | 5525727 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/22/2017 | REST OF WALLS OK--- | BRIAN | BRIAN | | ER | P | 5513302 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/19/2017 | BATHROOM HARD LIDS--OK------------NEED TO STRAP THE EMT WITHIN 3' AT PANEL --STRAP AND RECALL--- | BRIAN | BRIAN | | ER | P | 5511695 |
FOSTER ELECTRIC CORPORATION | ER | P | 05/11/2017 | WALLS --OK --SEE PLANS-- | BRIAN | BRIAN | | ER | P | 5503635 |
FOSTER ELECTRIC CORPORATION | ESL | C | 05/11/2017 | DRIVE UP --OK | BRIAN | BRIAN | | ESL | C | 5503634 |
FOSTER ELECTRIC CORPORATION | EUG | C | 05/02/2017 | DRIVE UP ---OK | BRIAN | BRIAN | | EUG | C | 5493232 |
FOSTER ELECTRIC CORPORATION | ESL | P | 04/28/2017 | ALL UNDER SLAB-- EXCEPT DRIVE THROUGH---OK | BRIAN | BRIAN | | ESL | P | 5491414 |
LEAGUE COMMERCIAL REFRIGERATION & HVAC | H= | C | 08/18/2017 | OK | JERRYF | JERRYF | | H= | C | 5600064 |
MESA PLUMBING & HEATING INC. | H= | C | 08/04/2017 | 2 PSI LETTER RECEIVED | MARKB | MARKB | | H= | C | 5585739 |
LEAGUE COMMERCIAL REFRIGERATION & HVAC | H= | P | 07/03/2017 | Test And Balance received | MARKB | MARKB | | H= | P | 5553563 |
LEAGUE COMMERCIAL REFRIGERATION & HVAC | H= | P | 06/30/2017 | Final pending Test And Balance and plan splice. Other items corrected. | MARKB | MARKB | | H= | P | 5552811 |
LEAGUE COMMERCIAL REFRIGERATION & HVAC | H= | P | 06/28/2017 | Still need to add 2 commercial ducts to permit, need revised plan showing hard lid in front of house with duct changes, install remote smoke indicators, undercut bathroom doors per plan and provide Test And Balance Report. | MARKB | MARKB | | H= | P | 5549387 |
LEAGUE COMMERCIAL REFRIGERATION & HVAC | HV | C | 06/28/2017 | WATER HEATER VENT OK. | MARKB | MARKB | | HV | C | 5549386 |
MESA PLUMBING & HEATING INC. | H= | P | 06/28/2017 | FINAL PENDING 2 PSI LETTER FROM CSU. | MARKB | MARKB | | H= | P | 5549376 |
MESA PLUMBING & HEATING INC. | H= | R | 06/27/2017 | Need to complete water heater condensate line (venting by other contractor is within 10' of economizer and installed with cell core piping not accepted by manufacturer). Need 2psi letter from CSU. Need pipe labeled for elevated pressure. Need connections complete to RTU'S. | MARKB | MARKB | | H= | R | 5547648 |
LEAGUE COMMERCIAL REFRIGERATION & HVAC | HD | P | 06/09/2017 | ABOVE CEILING SA / RA AND EXHAUST OK AS INSTALLED - BY FINAL NEED REVISED PLAN SHOWING ALL AS INSTALLED - ADD WATER HEATER VENT / EXHAUST VENT - ICE MACHINE - 2 COMMERCIAL DUCTS TO PERMIT | JERRYF | JERRYF | | HD | P | 5530884 |
MESA PLUMBING & HEATING INC. | HC | C | 05/24/2017 | OK TO SET 2# METER | JERRYF | JERRYF | | HC | C | 5515277 |
MESA PLUMBING & HEATING INC. | HI | C | 05/24/2017 | BY FINAL NEED 2# APPROVAL LETTER FOR CSU - REST OK - AT FINAL CONFIRM ALL LABELS / FINAL CONNECTIONS AND 1 CLAMP ON ROOF PIPING | JERRYF | JERRYF | | HI | C | 5515274 |
MESA PLUMBING & HEATING INC. | HI | P | 05/23/2017 | Why is there not a suite number on the permit? Need gas piping tagged at gas meter for suite number. Need 2 psi letter from CSU. Regulator not installed at this time. Piping on roof not strapped down to blocks. Water heater not installed at this time. 10 PSI PRESSURE TEST GOOD. GAS PIPING INSTALLED PER PLAN. | MARKB | MARKB | | HI | P | 5514326 |
MESA PLUMBING & HEATING INC. | P= | C | 06/28/2017 | Need dome strainer in drive thru floor sink, need hammer arrestor at ice machine, need back flow protection at expresso machines, rest OK. Notes changed 6/30/17 : corrections made | SHANEN | SHANEN | | P= | C | 5549728 |
MESA PLUMBING & HEATING INC. | PTO | C | 06/15/2017 | Drive thru OK, Check previous PTO notes at final | SHANEN | SHANEN | | PTO | C | 5536565 |
MESA PLUMBING & HEATING INC. | PTO | P | 05/24/2017 | OK, check for 1 1/2" water tie in at main by final, check water heater and recirc pump at final | SHANEN | SHANEN | | PTO | P | 5515524 |
MESA PLUMBING & HEATING INC. | PTO | P | 05/11/2017 | Partial. In wall DWV and water OK and on test. | SHANEN | SHANEN | | PTO | P | 5503350 |
MESA PLUMBING & HEATING INC. | PB | C | 05/10/2017 | | TAYLOR | TAYLOR | | PB | C | 5502383 |
MESA PLUMBING & HEATING INC. | PB | P | 04/28/2017 | need photo of san cross change out for back to back water closets | SHANEN | SHANEN | | PB | P | 5489934 |