PEAK PROFESSIONAL CONTRS INC | B= | C | 08/23/2017 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5604334 |
DREAM CATCHER MECHANICAL | BSP | P | 08/18/2017 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: splice to remove condensors from roof | DALEH | DALEH | | BSP | P | 5600160 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 08/09/2017 | Building final complete // Complete all other final inspections . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, DREAM CATCHER MECHANICAL Mechanical Final Inspection is not Completed yet, FRONTIER MECHANICAL SYSTEMS INC Mechanical Final Inspection is not Completed yet, NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5590641 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 07/11/2017 | Demising wall has been corrected and new splice for UL change approved. Wall built per new UL | JEREMYA | JEREMYA | | BSP | P | 5560757 |
PEAK PROFESSIONAL CONTRS INC | BSP | T | 07/07/2017 | PAID (REC#1437409) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Replace rated assembly | MICHAELA | MICHAELA | | BSP | T | 5557580 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 06/27/2017 | Interior wall framing OK at all areas EXCEPT demising wall (D) between southern tenant and this tenant. Wall is not built to the U465 listing on the approved plans. There is no option for fire treated plywood to be used in lieu of drywall in listing. Also, the listing requires American Gyp to be oriented vertically. It is installed horizontally // Discussed accessible elements with GC | JEREMYA | JEREMYA | | BFR | P | 5548460 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 06/12/2017 | North and South demising wall framing OK pending electric rough | JEREMYA | JEREMYA | | BFR | P | 5532546 |
ELECTRIC TECH INC. | E= | C | 08/08/2017 | | MATTHEW | MATTHEW | | E= | C | 5588733 |
ELECTRIC TECH INC. | E= | P | 08/07/2017 | provide illumination for condensers in ceiling space, 15 amp max for cooler OCPD | MATTHEW | MATTHEW | | E= | P | 5588318 |
ELECTRIC TECH INC. | ER | C | 08/07/2017 | ceiling ok | MATTHEW | MATTHEW | | ER | C | 5588315 |
ELECTRIC TECH INC. | ES | C | 08/03/2017 | Commercial Service: 400 amp., 4-wire 120/208 CT metering | GARYL | GARYL | | ES | C | 5585079 |
ELECTRIC TECH INC. | ER | P | 08/03/2017 | above ceilings only in lobby | GARYL | GARYL | | ER | P | 5585077 |
ELECTRIC TECH INC. | ES | R | 08/01/2017 | equipment ground too small from mdp; #4 installed and #2 called out on plans | MATTHEW | MATTHEW | | ES | R | 5582560 |
ELECTRIC TECH INC. | ER | P | 06/28/2017 | all walls | GARYL | GARYL | | ER | P | 5549394 |
ELECTRIC TECH INC. | ER | P | 06/13/2017 | demising walls OK | CRAIGS | CRAIGS | | ER | P | 5534253 |
DREAM CATCHER MECHANICAL | H= | C | 08/23/2017 | OK | LIDO | LIDO | | H= | C | 5604333 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 08/16/2017 | TAB REPORT RECEIVED. | LIDO | LIDO | | H= | C | 5596939 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 08/15/2017 | INTERLOCKS OK. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5596447 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 08/11/2017 | EF-1 DID NOT TURN ON DURING INTERLOCK TEST FOR OVEN , Need to verify interlocks . NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5593362 |
DREAM CATCHER MECHANICAL | H= | P | 08/10/2017 | REVISE PRINTS TO SHOW CONDENSERS ARE INSTALLED ON THE WALK IN COOLER AND FREEZER AND NOT THE ROOF, BRING INSALATION FROM THE CONDENSATE LINE ALL THE WAY TO EVAPORATOR .NOTE: HEAT TAP INSTALLED ON CONDENSATE LINE IN FREEZER. | LIDO | LIDO | | H= | P | 5592029 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 08/09/2017 | CORRECTIONS MADE. (gas regulator is installed on roof) . | LIDO | LIDO | | H= | C | 5590830 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 08/08/2017 | CONCENTRIC VENT TERMINATION IS NOT INSTALLED PER DETAIL IN THE INSTALLATION MANUAL REFER TO PAGE # 26 / 27 .ADD A SUPPORT AT THE CONCENTRIC Y ABOVE THE DROP CEILING, SUPPORT THE EXPANSION TANK. INSTALL CONDENSATE LINE FROM DRAIN PORT ON VENT. Gas regulator is installed for water heater , Missing gas regulator for oven. | LIDO | LIDO | | H= | P | 5589459 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 08/07/2017 | THE GAS REG IS NOT INSTALLED . CONTRACTOR THAT INSTALLED THE WATER HEATER VENT NEEDS TO ADD IT TO THERE SCOPE OF WORK AND CALL IN FOR INSPECTION . WATER HEATER NEEDS TO BE INSPECTED ALSO. ((Equipment connections ok.)) | LIDO | LIDO | | H= | P | 5587829 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 08/03/2017 | METER RELEASE. | LIDO | LIDO | | HC | C | 5584986 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 08/02/2017 | ALL SUPPLY AIR AND RETURN AIR FLEX CONNECTION IN DROP CEILING OK, BATHROOM S/A FLEX CONNECTIONS OK, EF-2 FAN IN BATHROOM OK / EF-2 EXHAUST TERMINATION ON ROOF OK, RTU -1 - 2 SMOKE DETECTOR REMOTE INDICATOR'S IN PLACE, RTU'S ON ROOF OK ADD SUPPORT TO OVEN VENT ,CONTRACTOR DOING WATER HEATER VENT NEEDS TO ADD TO THERE SCOPE OF WORK, Need interlocks verified , need test and balance report , | LIDO | LIDO | | H= | P | 5583754 |
DREAM CATCHER MECHANICAL | HRP | P | 06/29/2017 | 300 LB TEST OK. | LIDO | LIDO | | HRP | P | 5551464 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 06/29/2017 | 10 LB TEST OK , GAS PIPE INSTALLED PER PRINT , GAS ON ROOF LABELED AND SUPPORTED (OK ). NEED TO VERIFY REGS AND CONNECTION TO EQUIPMENT AT FINAL. | LIDO | LIDO | | HI | P | 5551459 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/26/2017 | ABOVE CEILING SA / RA OK TO WRAP - STILL NEED RESTROOM AND OVEN EXHAUST | JERRYF | JERRYF | | HD | P | 5546623 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 08/07/2017 | tenant finish | TED | TED | | P= | C | 5587481 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 06/27/2017 | test and design k | TED | TED | | PTO | C | 5548184 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 06/06/2017 | ok. | CRADE | CRADE | | PB | C | 5526475 |