FAUROT CONSTRUCTION, INC. | B= | C | 10/06/2017 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5647035 |
FAUROT CONSTRUCTION, INC. | B= | P | 09/29/2017 | Building final complete pending mech and receipt of state paperwork for electric and plumbing. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, PROCRAFT MECHANICAL Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5640308 |
PROCRAFT MECHANICAL, INC. | BSP | T | 09/26/2017 | PAID (REC#1455794) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to add note on drawings about using pre fabricated duct instead of field built | DALEH | DALEH | | BSP | T | 5637590 |
FAUROT CONSTRUCTION, INC. | BSP | T | 09/21/2017 | PAID (REC#1455911): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised chase | SHELLEY | SHELLEY | | BSP | T | 5632306 |
FAUROT CONSTRUCTION, INC. | BFR | P | 09/20/2017 | Framing for ducts at kitchen OK | JEREMYA | JEREMYA | | BFR | P | 5631312 |
FAUROT CONSTRUCTION, INC. | BFR | P | 08/04/2017 | Kitchen wall framing OK pending other rough inspections | JEREMYA | JEREMYA | | BFR | P | 5586041 |
PROCRAFT MECHANICAL, INC. | H= | C | 10/06/2017 | TAB RECEIVED | MARKB | MARKB | | H= | C | 5647034 |
PROCRAFT MECHANICAL, INC. | H= | P | 10/02/2017 | FINAL PENDING TEST AND BALANCE. OTHER ITEMS HAVE BEEN ADDRESSED | MARKB | MARKB | | H= | P | 5641785 |
PROCRAFT MECHANICAL, INC. | HD | P | 09/28/2017 | TYPE 1 HOOD INTERLOCK WITH MUA UNIT CONFIRMED. For final need the following: 1. Correct scope of work to read as follows: 1 - Type 1 hood, 1 - Type 2 hood, 1 - other (VAV), 1 - Makeup air unit, 2 - Exhaust fans, 4 - Ducts, 1 - Walk in cooler, 1 - Walk in freezer & 2 - Condensing units. 2. Need to verify Dishwasher interlock. 3. Need Walk in condensate lines installed. 4. Need Equipment on roof labeled. 5. Provide Test And Balance Report for kitchen. | MARKB | MARKB | | HD | P | 5639594 |
PROCRAFT MECHANICAL, INC. | HRP | C | 09/28/2017 | PRESSURE TEST, INSULATION AND SUPPORT OF LINESETS FOR WALK IN COOLER/FREEZER OK. | MARKB | MARKB | | HRP | C | 5639586 |
PROCRAFT MECHANICAL, INC. | HD | P | 09/25/2017 | Still need manufactured grease duct on plan with size and brand. CONTRACTOR PERFORMED A SMOKE TEST TO CHECK FOR LEAKS ON HOOD COLLAR TRANSITION . MANUFACTURED GREASE DUCT IS NOW SUPPORTED PER MANUFACTURER INSTRUCTIONS AND HAS PROPER SLOPE. MAKEUP AIR, GREASE & TYPE 2 DUCTS ARE PROPERLY SUPPORTED AND MATCH PLANS DOWN TO KITCHEN. | MARKB | MARKB | | HD | P | 5636150 |
PROCRAFT MECHANICAL, INC. | HD | P | 09/18/2017 | ABOVE CEILING DUCT - HIGH/LOW PRESSURE SIDES OF VAV FOR SUPPLY DUCTING OK TO WRAP. FLEX AND DIFFUSERS OK. | MARKB | MARKB | | HD | P | 5628855 |
PROCRAFT MECHANICAL, INC. | HD | P | 09/18/2017 | GREASE DUCT INSPECTION - Contractor to correct scope of work to include MUA unit, Type 1 hood, Type 2 hood, exhaust fans. Need a plan splice to include: An updated equipment schedule including dishwasher hood and exhaust fan. Need detail showing type 2 duct construction, support and penetrations at ceiling and roof. Need detail for manufactured grease duct showing support and penetrations at ceiling and roof. Grease duct appears to lack proper grade. Still need to weld square to round adaptor at hood. | MARKB | MARKB | | HD | P | 5628853 |