JR WILDER CONSTRUCTION LLC | B= | C | 09/15/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6706117 |
JR WILDER CONSTRUCTION LLC | B= | P | 04/29/2020 | with completed required inspections B= okay. Additional Inspections Required (computer generated): AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, GRANT DRUMMOND II Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6555509 |
JR WILDER CONSTRUCTION LLC | BE | L | 02/13/2020 | Renewed for $50.00 at 2/13/2020 9:36:05 AM (Receipt#1662033) | JANE | JANE | | BE | L | 6481252 |
JR WILDER CONSTRUCTION LLC | B= | P | 07/12/2019 | need to attach plumb permit, pending completion of plumb, elec and mech finals, building okay -- Schedule a new Building Final when above items are complete. | BOBF | BOBF | | B= | P | 6262567 |
JR WILDER CONSTRUCTION LLC | BE | L | 07/09/2019 | Renewed for $50.00 at 7/9/2019 3:07:43 PM (Receipt#1612717) | NELIDA | NELIDA | | BE | L | 6257750 |
JR WILDER CONSTRUCTION LLC | BSP | P | 12/21/2018 | Re open no fee. | NATHAN | NATHAN | | BSP | P | 6060535 |
JR WILDER CONSTRUCTION LLC | BSP | P | 05/21/2018 | discussed sequence of inspection and went over required equipment for pool, engineer letter for structural elements to follow. | NATHAN | NATHAN | | BSP | P | 5850520 |
JR WILDER CONSTRUCTION LLC | BE | L | 01/30/2018 | Renewed at 1/30/2018 2:00:57 PM | GITA | GITA | | BE | L | 5751921 |
DENHAM ELECTRIC | E= | C | 08/01/2019 | ok per pic | BRIAN | BRIAN | | E= | C | 6284485 |
DENHAM ELECTRIC | E= | P | 07/11/2019 | still need to label the panels pool A and pool B with voltage and color code / need rain guard on transformer / missing ko plug on transformer / Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | BRIAN | BRIAN | | E= | P | 6260169 |
DENHAM ELECTRIC | ER | R | 07/10/2019 | need to land equipment ground on the lug in the pool heaters / need stainless bolts and nuts for lugs on steel deck / remove the paint with wire brush / label the pumps / need wr rated outlet / need correct labels on gear and pumps / remove the #8 jumper from the panel to the steel frame / label the panels / need to test the epo's / 3r cover for transformer / | BRIAN | BRIAN | | ER | R | 6258736 |
DENHAM ELECTRIC | ER | P | 07/10/2019 | encapsulation insp. ok--- | BRIAN | BRIAN | | ER | P | 6258718 |
DENHAM ELECTRIC | E= | R | 07/08/2019 | never completed rough inspections, need encapsulation inspection on pool and tub lights, need to drain pool and tub, could not enter pool area, door was locked, have equipment open for next inspection, | JOHNN | JOHNN | | E= | R | 6255357 |
DENHAM ELECTRIC | ER | R | 03/07/2019 | no one on site / left message on voice mail of call ahead # / | BRIAN | BRIAN | | ER | R | 6126659 |
DENHAM ELECTRIC | ESL | C | 09/10/2018 | | BRET | BRET | | ESL | C | 5959623 |
DENHAM ELECTRIC | ER | R | 09/07/2018 | pool bonding: connect both bond rings together from tub to pool, run bond to equipment , if permanent lift is used, it will need bond tail sticking up, remove bond tail from transformer and buck boast to deck mesh,--------------pool light shell bond,ok,---tub light shell not installed yet, steel structure is bonded to pool bond underneath, conduit for 480v feeder is ok, conduit for pool light is ok, tub light conduit not ready. | JOHNN | JOHNN | | ER | R | 5958031 |
DRUMMOND PLUMBING LLC | H= | C | 09/15/2020 | | LIDO | LIDO | | H= | C | 6706116 |
AIRTECH MECHANICAL, INC. | H= | C | 09/15/2020 | STAMPED ENGINEER LETTER RECEIVED FOR COMBUSTION AIR. SEE IMAGES. | LIDO | LIDO | | H= | C | 6705991 |
AIRTECH MECHANICAL, INC. | HE | L | 07/30/2020 | Renewed for No Fee at 7/30/2020 1:35:00 PM | VERONIKAP | VERONIKAP | | HE | L | 6656007 |
AIRTECH MECHANICAL, INC. | H= | T | 01/30/2020 | PAID (REC#1690653): NEED REVISED AND APPROVED PLANS TO REFLECT PLUMBING SHOWN ON PLAN P1.1 NOT INSTALLED. COMBUSTION AIR IS NOT INSTALLED PER MECHANICAL SPLICE PAGE M2.1 NOTE 3. | LIDO | LIDO | | H= | T | 6469228 |
DRUMMOND PLUMBING LLC | H= | P | 01/30/2020 | Charged to partial (LM) to close out permit /NEED REVISED AND APPROVED PLANS TO REFLECT PLUMBING SHOWN ON PLAN P1.1 NOT INSTALLED. COMBUSTION AIR IS NOT INSTALLED PER MECHANICAL SPLICE PAGE M2.1 NOTE 3. ( T & P FOR THE TWO BOILERS OK ) | LIDO | LIDO | | H= | P | 6469224 |
AIRTECH MECHANICAL, INC. | HE | L | 01/30/2020 | Renewed for No Fee at 1/30/2020 8:55:15 AM | JACK | JACK | | HE | L | 6468945 |
DRUMMOND PLUMBING LLC | HE | L | 01/29/2020 | Renewed for No Fee at 1/29/2020 8:58:35 AM | JACK | JACK | | HE | L | 6467414 |
DRUMMOND PLUMBING LLC | H= | L | 01/07/2020 | CANCELED BY CONTRACTOR AT CALL AHEAD | JERRYF | JERRYF | | H= | L | 6445552 |
DRUMMOND PLUMBING LLC | HWP | C | 07/12/2019 | | LIDO | LIDO | | HWP | C | 6261557 |
DRUMMOND PLUMBING LLC | H= | P | 07/12/2019 | IF NEW PLUMBING IS NOT TO BE INSTALLED PER THE PLANS , REVISED AND APPROVED PLANS ARE NEEDED TO REFLECT THIS. NEED 4'-0" X 6'-6" LOUVER DOOR INSTALLED PER SPLICE PAGE M2.1 DATED 7/9/19 . NEED CONTRACTOR THAT INSTALLED THE BOILERS ATTACHED TO THE PERMIT / THE TWO BOILERS ARE MISSING THE (PRV) PRESSURE RELIEF VALVE .(( GAS FINAL CONNECTIONS TO THE TWO BOILERS OK )) EACH BOLER IS 266K BTU'S. | LIDO | LIDO | | H= | P | 6261552 |
AIRTECH MECHANICAL, INC. | H= | P | 07/12/2019 | IF NEW PLUMBING IS NOT TO BE INSTALLED PER THE PLANS , REVISED AND APPROVED PLANS ARE NEEDED TO REFLECT THIS. NEED 4'-0" X 6'-6" LOUVER DOOR FOR COMBUSTION AIR INSTALLED PER SPLICE PAGE M2.1 DATED 7/9/19 . NEED CONTRACTOR THAT INSTALLED THE BOILERS ATTACHED TO THE PERMIT / THE TWO BOILERS ARE MISSING THE (PRV) PRESSURE RELIEF VALVE . | LIDO | LIDO | | H= | P | 6261546 |
AIRTECH MECHANICAL, INC. | HV | C | 07/12/2019 | THE TWO POOL HEATERS / BOILER VENTS OK. | LIDO | LIDO | | HV | C | 6261535 |
DRUMMOND PLUMBING LLC | HC | C | 07/12/2019 | ADDED GAS LOAD TO EXISTING METER ( 798K ) | LIDO | LIDO | | HC | C | 6261281 |
DRUMMOND PLUMBING LLC | HC | C | 07/10/2019 | METER RELEASE. | LIDO | LIDO | | HC | C | 6258291 |
DRUMMOND PLUMBING LLC | H= | P | 07/10/2019 | NEED CONTRACTOR INSTALLING THE TWO BOILERS AND VENTS ATTACHED TO THE PERMIT. GAS TO NEW POOL HEATERS INSTALLED PER SPLICE DATED 7/9/19. STILL NEED TO SEE FINAL CONNECTIONS TO THE TWO POOL HEATERS / BOILERS . | LIDO | LIDO | | H= | P | 6258287 |
DRUMMOND PLUMBING LLC | HI | P | 06/27/2019 | GAS WAS NOT INSTALLED PER PLANS (REFER TO PLAN PAGE P1.1 ) / INSTALL PER PLANS OR PROVIDE A REVISED AND APPROVED GAS PLAN TO MATCH GAS PIPE INSTALL . A STRUCTURE IS BEING BUILT AROUND THE TWO BOILERS ON THE ROOF, MAY NEED BUILDING FOR THE STRUCTURE , MAY NEED MECHANICAL FOR COMBUSTION AIR . | LIDO | LIDO | | HI | P | 6245922 |
DRUMMOND PLUMBING LLC | HI | P | 06/26/2019 | CANT RELEASE METER UNTIL PLANS FOR GAS HAVE GONE THROUGH PLANS AND REVIEW. NEED CONTRACTOR INSTALLING THE TWO BOILERS AND VENT ATTACHED TO THE PERMIT/ NEED PLANS FOR TWO NEW BOILERS INSTALLED TO GO THROUGH PLANS AND REVIEW , ((BOILERS ARE NOT A CHANGE OUT.)) 10lb TEST OK / 2-1/2 " INSTALLED FROM METER ROOM UP TO NEW POOL HEATER ROOM . | LIDO | LIDO | | HI | P | 6245154 |
JR WILDER CONSTRUCTION LLC | XPS | T | 02/13/2020 | PAID (REC#1662075) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 2/13/20: Delta 3 revisions to remove plumbing scope of work. | SHANEN | SHANEN | | XPS | T | 6481444 |
DRUMMOND PLUMBING LLC | XMS | T | 07/09/2019 | PAID (REC#1612743) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new mechanical splice for gas pipe | TCRIPPEN | TCRIPPEN | | XMS | T | 6257873 |