AM KING CONSTRUCTION COMPANY, LLC | B= | C | 05/21/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5851240 |
AM KING CONSTRUCTION COMPANY, LLC | B= | P | 05/07/2018 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COMMERCIAL DESIGN ENGR LTD Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5837570 |
AM KING CONSTRUCTION COMPANY, LLC | BIN | P | 03/27/2018 | thermal envelope insulation in exterior walls OK pending other roughs | DANE | DANE | | BIN | P | 5800219 |
AM KING CONSTRUCTION COMPANY, LLC | BFR | P | 03/21/2018 | light gauge framing at exterior walls OK pending other roughs | DANE | DANE | | BFR | P | 5794868 |
AM KING CONSTRUCTION COMPANY, LLC | BSP | P | 03/21/2018 | site visit to discuss need to for electrical panels to be pulled away from the exterior CMU wall so insulation can be continuous behind them | DANE | DANE | | BSP | P | 5794858 |
MEL-RO CONSTRUCTION INC | BFR | P | 02/22/2018 | engineer letter of compliance received for excavation observation, foundation observation, bond beams and welding and bolting connections / still need to inspect all interior framing and insulation | DANE | DANE | | BFR | P | 5771365 |
MEL-RO CONSTRUCTION INC | BBB | P | 02/22/2018 | engineer letter of compliance received for excavation observation, foundation observation, bond beams and welding and bolting connections | DANE | DANE | | BBB | P | 5771361 |
MEL-RO CONSTRUCTION INC | BFN | C | 02/22/2018 | engineer letter of compliance received for excavation observation, foundation observation, bond beams and welding and bolting connections | DANE | DANE | | BFN | C | 5771359 |
COMMERCIAL DESIGN ENGEERING LTD | BSP | T | 01/19/2018 | PAID (REC#1479631) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 1-19-2018 | TCRIPPEN | TCRIPPEN | | BSP | T | 5742050 |
MEL-RO CONSTRUCTION INC | BFR | P | 11/17/2017 | exterior light gage framing at parapets above store fronts OK | DANE | DANE | | BFR | P | 5688842 |
MEL-RO CONSTRUCTION INC | BFI | P | 10/19/2017 | foundation insulation OK / still need open hole and engineer observation for footing | DANE | DANE | | BFI | P | 5660695 |
MEL-RO CONSTRUCTION INC | BBB | P | 10/09/2017 | met on site with contractor and discussed OK to use engineer for bond beams and structural steel welding and bolting inspections / letter of compliance is to follow / discussed need for open hole and engineer letter of compliance for footings as well / also discussed inspection process / footings not installed at this time | DANE | DANE | | BBB | P | 5648924 |
MEL-RO CONSTRUCTION INC | BFN | P | 10/04/2017 | ok to use engineer to do inspections with observation letters and soils reports to be picked up by inspector may need drain inspections and BFI also/need ufer addressed in letters | BERTW | BERTW | | BFN | P | 5645068 |
MEL-RO CONSTRUCTION INC | BFT | P | 10/04/2017 | ok to use engineer to do inspections with observation letters and soils reports to be picked up by inspector may need drain inspections and BFI also/need ufer addressed in letters | BERTW | BERTW | | BFT | P | 5645066 |
FOSTER ELECTRIC CORPORATION | E= | C | 05/01/2018 | Complete / | ROB | ROB | | E= | C | 5832963 |
FOSTER ELECTRIC CORPORATION | ER | C | 05/01/2018 | 3-50 amp RTU's--o/s building lighting--pole lighting all complete / Inside is being completed as Tenant Finish / | ROB | ROB | | ER | C | 5832957 |
FOSTER ELECTRIC CORPORATION | ES | C | 04/17/2018 | Commercial Service: 600 amp 120/208 commercial service-----ok to set meter | RANDY | RANDY | | ES | C | 5818836 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/25/2018 | all cassions for pole lights this building | GARYL | GARYL | | EUG | P | 5747839 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/19/2018 | 4 or 5 pole lights, couldn't tell, didn't see prints, trench is okay, south end in large island area | GARYL | GARYL | | EUG | P | 5742961 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/18/2018 | clean out some of trenching | GARYL | GARYL | | EUG | P | 5741848 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/17/2018 | all walls | GARYL | GARYL | | ER | P | 5740752 |
FOSTER ELECTRIC CORPORATION | EUG | L | 01/17/2018 | trencher broke | GARYL | GARYL | | EUG | L | 5740751 |
FOSTER ELECTRIC CORPORATION | EUG | P | 12/19/2017 | Prints show a 400 amp service and the tenant needs 600 amps., need to revise prints before final | GARYL | GARYL | | EUG | P | 5717403 |
FOSTER ELECTRIC CORPORATION | EUG | P | 12/12/2017 | Building to 1st island, island to patio, same island to south island | GARYL | GARYL | | EUG | P | 5710512 |
FOSTER ELECTRIC CORPORATION | EUG | P | 12/01/2017 | stubbed up to CT location from xfrm | GARYL | GARYL | | EUG | P | 5700201 |
FOSTER ELECTRIC CORPORATION | EUG | P | 11/06/2017 | remainder of drive thru underground | MATTHEW | MATTHEW | | EUG | P | 5678031 |
FOSTER ELECTRIC CORPORATION | EUG | P | 10/19/2017 | inside of building is complete for eug, includes pvc's for outside signs, etc ran along side of building, okay to cover | GARYL | GARYL | | EUG | P | 5661100 |
FOSTER ELECTRIC CORPORATION | EUG | P | 10/17/2017 | all eug inside of building | GARYL | GARYL | | EUG | P | 5658231 |
FOSTER ELECTRIC CORPORATION | EUG | P | 10/13/2017 | #2 to ufer | GARYL | GARYL | | EUG | P | 5655293 |
COMMERCIAL DESIGN ENGEERING LTD | H= | C | 05/08/2018 | MECHANICAL FINAL OK. PER CONTRACTOR HUMIDITY SENSOR CHIP IS INSTALLED IN T-STAT. | NANCY | NANCY | | H= | C | 5838325 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 05/02/2018 | INSTALL HUMIDITY CONTROL AS PER PLAN. | NANCY | NANCY | | H= | P | 5833227 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/30/2018 | MECHANICAL FINAL OK PENDING LETTER FROM ENGINEER DELETING HUMIDITY SENSOR. | NANCY | NANCY | | H= | P | 5830692 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/13/2018 | Added to notes 4/16/18 (LM) NO ACCESS TO ROOF , STILL NEED TO VERIFY EQUIPMENT MATCH TO NEW SCHEDULE . IF NOT INSTALLING HUMIDITY SENSOR REMOVE FROM PLANS OR PROVIDE A ENGINEER LETTER DELETING HUMIDITY SENSOR . RE INSPECT ALL EQUIPMENT.NEED TO LABEL MEDIUM PRESSURE GAS INSIDE BUILDING BEFORE REGULATOR Gas regulator installed per plan | LIDO | LIDO | | H= | P | 5816893 |
COMMERCIAL DESIGN ENGEERING LTD | H= | L | 04/06/2018 | BUILDING LOCKED AT 3:42 PM. | NANCY | NANCY | | H= | L | 5810711 |
COMMERCIAL DESIGN ENGEERING LTD | HD | P | 02/02/2018 | EQUIPMENT INSTALLED IS NOT WHAT IS SHOWN ON EQUIPMENT SCHEDULE PAGE M001. NEED REVISED/APPROVED EQUIPMENT SCHEDULE OR INSTALL EQUIPMENT AS PER PRINT. IS HUMIDITY SENSOR TO BE INSTALLED? IF NO, REMOVE FROM SCHEDULE. REINSPECT ALL EQUIPMENT. | NANCY | NANCY | | HD | P | 5755518 |
COMMERCIAL DESIGN ENGEERING LTD | HC | C | 02/02/2018 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 5755515 |
COMMERCIAL DESIGN ENGEERING LTD | HI | C | 02/02/2018 | 10 LB TEST OK. INSTALLED AS PER SPLICE. | NANCY | NANCY | | HI | C | 5755511 |
COMMERCIAL DESIGN ENGEERING LTD | P= | C | 02/02/2018 | Ok. | DANR | DANR | | P= | C | 5755460 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | C | 02/02/2018 | Test and design ok. | DANR | DANR | | PTO | C | 5755454 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | L | 11/27/2017 | plbg contrator and gc has no idea who called this for a pto on core and shell today, called in by accident? | JOHNS | JOHNS | | PTO | L | 5694912 |
COMMERCIAL DESIGN ENGEERING LTD | PB | C | 10/11/2017 | ok for test and design per plan. water stubbed into water entry room | JOHNS | JOHNS | | PB | C | 5651850 |
COMMERCIAL DESIGN ENGEERING LTD | XMS | T | 04/19/2018 | PAID (REC#1495650): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas layout and RTU schedule | JUSTINC | JUSTINC | | XMS | T | 5821189 |
FOSTER ELECTRIC CORPORATION | XES | T | 04/13/2018 | PAID (REC#1494125): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Splice to provide new AIC and SCA information. | BERTHA | BERTHA | | XES | T | 5817186 |
COMMERCIAL DESIGN ENGEERING LTD | XMS | T | 04/11/2018 | PAID (REC#1493597) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 4-11-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5814480 |
COMMERCIAL DESIGN ENGEERING LTD | XMS | T | 02/12/2018 | PAID (REC#1492140) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised sheet M001 for revised RTU schedule and wall heater schedule | JUSTINC | JUSTINC | | XMS | T | 5762891 |
FOSTER ELECTRIC CORPORATION | XES | T | 01/30/2018 | PAID (REC#1492707): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line and panels schedules. | SHELBY | SHELBY | | XES | T | 5751578 |