WANER CONSTRUCTION COMPANY, INC. | B= | C | 07/23/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5910430 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 07/23/2018 | . Additional Inspections Required (computer generated): AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5910400 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 07/18/2018 | Temp CO: extension ( Expires: 7/23/2018 12:00:00 AM) | JANE | JANE | | B= | P | 5906155 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 06/19/2018 | Temp CO: Extension of TCO ( Expires: 7/19/2018 12:00:00 AM) | MINDY | MINDY | | B= | P | 5878685 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 06/06/2018 | all items corrected. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, DENVER HEATING & AIR CONDITIONING Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5866112 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 06/01/2018 | still need pool equipment room penetrations and door sealed, mount all pool signage for emergency, life ring and rescue pole / exit signs, sink drain protection throughout / complete all required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, DENVER HEATING & AIR CONDITIONING Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5862467 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 05/21/2018 | Temp CO: all partials ( Expires: 6/20/2018 12:00:00 AM) | JANE | JANE | | B= | P | 5851307 |
WANER CONSTRUCTION COMPANY, INC. | BSP | P | 05/21/2018 | UPON FURTHER REVIEW DOORS AND LATCHES FOR RACQUETBALL COURTS OK PER CHIEF BUILDING INSPECTOR BERT W | NICK | NICK | | BSP | P | 5850688 |
WANER CONSTRUCTION COMPANY, INC. | BSP | P | 05/18/2018 | Eng on file for bond beams, footings, foundations, welding, bolting | NICK | NICK | | BSP | P | 5849949 |
WANER CONSTRUCTION COMPANY, INC. | B= | P | 05/18/2018 | Need to install all exit signs for all group and cinema fitness rooms / Need to seal all penetrations in walls of pool equipment room for smoke / Need to provide letter from architect stating that door hardware for racquetball courts meets requirements of ANSI 404.2.6 / Glass panels at racquetball courts project 12" beyond the face of the door perpendicular to the face of the door, does not meet ANSI 404.2.3.4 requirements for recessed doors / Need to install covers for all plumbing under sinks for all restrooms / All other items completed from previous inspection -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Fin | NICK | NICK | | B= | P | 5849940 |
WANER CONSTRUCTION COMPANY, INC. | B= | R | 05/17/2018 | Need all Eng for footing/foundation / Need all other finals complete / Need to install smoke seal on all 45 min doors in fire barrier / Need to blank all locks on interior doors throughout / Need to install all exit signs / Need to install grab bars for all accessible restrooms / Need to install seats for all accessible showers / Need to install all covers for plumbing of sinks throughout / Need to seal all penetrations in pool equipment room for smoke / Need to install all panic hardware for exterior doors / Need to install high low water fountains / Need Eng for welding, bolting and bond beams / Need to install all accessible signs throughout / Need to install benches for accessibility in locker rooms. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ADVANCED ELECTRIC GROUP Elec | NICK | NICK | | B= | R | 5847715 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 05/08/2018 | all penetrations and marking completed above ceiling at I and B occupancy areas | NATHAN | NATHAN | | BFR | P | 5838856 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 05/04/2018 | above ceiling marking of rated walls and firecaulking at inside of kids area and above entry reception area okay with completed required inspection | NATHAN | NATHAN | | BFR | P | 5836309 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 04/27/2018 | head of wall detail mineral fiber and drywall completed at all rated walls, NEED FIRESTOPPING ABOVE CEILING AND MARKING ABOVE LID IDENTIFYING RATED WALLS, all walls now built and with completed required inspections okay throughout building. | NATHAN | NATHAN | | BFR | P | 5830272 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 04/16/2018 | REMOVE OR SUPPLY LISTED ASSEMBLY FOR LOW VOLT WIRE THROUGH HEAD OF WALL DETAIL ABOVE MASSAGE ROOM,NEED INSPECTION OF POOL ROOMS 126 A -126 G AND HARD LIDS AT REAR LOCKER AND RESTROOMS. racquet ball courts frame with completed required inspections okay, | NATHAN | NATHAN | | BFR | P | 5817720 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 04/12/2018 | FRAMING OF ALL WALLS EXCEPT RACQUET BALL COURTS AND HARDLIDS AT REAR BATHROOMS AND SHOWERS. ========need low volt wires at rated wall per UL listing not between wall and roof pan==========. remaining framing corrected and completed, mineral fiber insulation at head of wall rated assembly for entire length okay | NATHAN | NATHAN | | BFR | P | 5815649 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 03/23/2018 | screws added at curtain wall | NATHAN | NATHAN | | BFR | P | 5797871 |
WANER CONSTRUCTION COMPANY, INC. | BIN | P | 03/23/2018 | addition roof insulation okay | NATHAN | NATHAN | | BIN | P | 5797846 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 03/16/2018 | ADD SCREW TO TOP OF CURTAIN WALL OVER FRONT DESK FITNESS SIDE, front exterior tower columns and facia framing OKAY WITH LETTER OF CMU CHANGE OF PARAPET SUPPORT BY FINAL. head of wall frame at fitness side okay, | NATHAN | NATHAN | | BFR | P | 5791084 |
WANER CONSTRUCTION COMPANY, INC. | BSP | P | 03/08/2018 | discussed head of wall detail and inspection process and procedure, front column and facia frame built, Still need detail change for CMU not added per previous comments. | NATHAN | NATHAN | | BSP | P | 5783978 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 03/07/2018 | front exterior facia framing framing without columns at sides attached per plans. front exterior steel stud column framing needs CMU support at parapet added or detail changed page S702 section 2. | NATHAN | NATHAN | | BFR | P | 5782385 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 02/27/2018 | NEED MECHANICAL INSPECTION AND DAMPERS AT RATED WALL, ADDRESS CHILDRENS RESTROOM 111c, PLUMBING AND BACKING PER ANSI 2009 A117.1, HEAD OF WALL DETAIL STILL REMAINING, framing at grids A-H, 1-8 okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5775508 |
WANER CONSTRUCTION COMPANY, INC. | BFR | R | 02/21/2018 | What area's that are done are per UL 419 listing for drywall type and attachment but no area is 100% complete. I cannot okay inspection unless hole rooms minimum are done for inspection. | NATHAN | NATHAN | | BFR | R | 5770675 |
WANER CONSTRUCTION COMPANY, INC. | BIN | R | 02/13/2018 | grid line 1 E-H type 1C wall calls for R19 need clarification, grid line 1 A-E only R5 installed. | NATHAN | NATHAN | | BIN | R | 5764665 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 02/09/2018 | frame of wall with completed required inspections at grid line B-F,1-3 MINUS ADA LABELED RESTROOM AND BACKING AT 2 CHILDREN'S RESTROOMS, frame at basketball court east and west walls to door openings and room 129 with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5762191 |
WANER CONSTRUCTION COMPANY, INC. | BFR | P | 01/26/2018 | DISCUSSED FIRE RATED ASSEMBLY AND ADDRESSED THE NEED FOR ALL UL LISTINGS TO BE PRINTED ON SITE, WATCH LISTING FOR TYPE OF DRYWALL TO BE USED AMERICAN GYPSUM ON SITE. 5/8" DRYWALL NEEDED BEHIND ELECTRIC PANELS PRIOR TO MOUNTING. | NATHAN | NATHAN | | BFR | P | 5749219 |
WANER CONSTRUCTION COMPANY, INC. | BSP | P | 01/08/2018 | dampproofing okay | NATHAN | NATHAN | | BSP | P | 5731924 |
WANER CONSTRUCTION COMPANY, INC. | BFN | P | 01/08/2018 | authorized inspection by engineer. | NATHAN | NATHAN | | BFN | P | 5731922 |
WANER CONSTRUCTION COMPANY, INC. | BFT | P | 01/08/2018 | authorized inspection by engineer. | NATHAN | NATHAN | | BFT | P | 5731918 |
WANER CONSTRUCTION COMPANY, INC. | BFI | P | 01/08/2018 | 12" vertical installed 2" thick, comcheck does not require insulation at slab. | NATHAN | NATHAN | | BFI | P | 5731917 |
ADVANCED ELECTRIC GROUP | E= | C | 06/06/2018 | POOL AND ROOF --OK | BRIAN | BRIAN | | E= | C | 5866851 |
ADVANCED ELECTRIC GROUP | EP | P | 06/04/2018 | all sub panels, EXCEPT 225f4 in pool room | GARYL | GARYL | | EP | P | 5863781 |
ADVANCED ELECTRIC GROUP | E= | R | 06/01/2018 | SEE ER FOR THE POOL | BRIAN | BRIAN | | E= | R | 5862500 |
ADVANCED ELECTRIC GROUP | ER | R | 06/01/2018 | COMPLY WITH 680.21 C---AND 680.22.4 ---NEED EPO FOR HOT TUB PUMPS----- | BRIAN | BRIAN | | ER | R | 5862485 |
ADVANCED ELECTRIC GROUP | E= | P | 05/31/2018 | ROOF----NEED TO BOND THE DISCO ON MUA---UNIT 1 NEED 30 AMP FUSES ---BREAKER TO LARGE FOR UNIT 8 --BREAKER TO SMALL FOR UNIT 11 --FLIP BREAKERS---REST OF ROOF OK--- | BRIAN | BRIAN | | E= | P | 5860322 |
ADVANCED ELECTRIC GROUP | E= | P | 05/21/2018 | WOMEN'S LOCKER ROOM---OK | BRIAN | BRIAN | | E= | P | 5851645 |
ADVANCED ELECTRIC GROUP | ER | P | 05/21/2018 | WOMEN'S LOCKER ROOM CEILINGS--OK | BRIAN | BRIAN | | ER | P | 5851644 |
ADVANCED ELECTRIC GROUP | E= | P | 05/18/2018 | FITNESS --SPINNING--AEROBICS--OK ----------STILL NEED WOMENS LOCKER ROOM,ROOF/OUTSIDE , POOL AND EP INSPECTIONS-- | BRIAN | BRIAN | | E= | P | 5850063 |
ADVANCED ELECTRIC GROUP | ER | P | 05/18/2018 | CEILINGS IN FITNESS --SPINNING--AEROBICS----OK | BRIAN | BRIAN | | ER | P | 5850062 |
ADVANCED ELECTRIC GROUP | E= | P | 05/17/2018 | MAIN AREA--RACKET BALL COURTS---OK------ STILL NEED POOL,WOMENS LOCKER.FITNESS,SPINNING,AEROBICS ROOF /OUTSIDE--- | BRIAN | BRIAN | | E= | P | 5848396 |
ADVANCED ELECTRIC GROUP | E= | P | 05/16/2018 | TANNING--SALES FLOOR / CUBES---RECEPTION---MENS LOCKER ROOM---FRONT ENTRY--- | BRIAN | BRIAN | | E= | P | 5847300 |
ADVANCED ELECTRIC GROUP | ER | P | 05/14/2018 | POOL LIGHT BONDING / POTTING --OK | BRIAN | BRIAN | | ER | P | 5843961 |
IMPACT FIRE SERVICES, LLC | E= | C | 05/11/2018 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 5841999 |
IMPACT FIRE SERVICES, LLC | ER | C | 05/11/2018 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 5841998 |
ADVANCED ELECTRIC GROUP | ESL | C | 05/08/2018 | POOL BOND TO THE STEEL COLUMN --OK | BRIAN | BRIAN | | ESL | C | 5839031 |
ADVANCED ELECTRIC GROUP | ER | P | 05/03/2018 | REST OF THE HARD LIDS--- | BRIAN | BRIAN | | ER | P | 5834794 |
ADVANCED ELECTRIC GROUP | ER | P | 05/01/2018 | WALLS IN SAUNA , STEAM ROOM AND EAST POOL ROOM---OK | BRIAN | BRIAN | | ER | P | 5832526 |
ADVANCED ELECTRIC GROUP | ER | R | 04/26/2018 | Ceiling rough ok, FA not complete ---------do not close ceiling-------------- / SEE PLANS-----CAN NOT HAVE CORD AND PLUG CONNECTED EQUIPMENT IN GRID CEILING ---- | BRIAN | BRIAN | | ER | R | 5828669 |
ADVANCED ELECTRIC GROUP | ES | C | 04/24/2018 | Commercial Service: 2000 AMP 4-W --OK TO ENERGIZE AND SET METER--------NOTE--- OK TO MAIN ONLY---- | BRIAN | BRIAN | | ES | C | 5825533 |
ADVANCED ELECTRIC GROUP | ER | P | 04/17/2018 | HARD LIDS ---SEE PLANS---WALLS NEAR POOL---SEE PLANS | BRIAN | BRIAN | | ER | P | 5819003 |
ADVANCED ELECTRIC GROUP | ER | P | 04/06/2018 | SPINNING,CARDIO, AND GGX --WALLS----------FRONT ENTRY HARD LID---OK | BRIAN | BRIAN | | ER | P | 5810402 |
ADVANCED ELECTRIC GROUP | EUG | R | 04/04/2018 | POOL BONDING----NEED TO BOND THE METAL COLUMN---X 2 | BRIAN | BRIAN | | EUG | R | 5807998 |
ADVANCED ELECTRIC GROUP | ER | P | 03/23/2018 | WALLS ---SEE PLANS | BRIAN | BRIAN | | ER | P | 5797960 |
ADVANCED ELECTRIC GROUP | EUG | P | 03/23/2018 | BOND FOR THE POOL HAND RAIL HOLDERS ONLY---OK | BRIAN | BRIAN | | EUG | P | 5797959 |
ADVANCED ELECTRIC GROUP | ER | P | 03/05/2018 | WALLS---SEE PLANS----BASKET BALL COURT--REAR BATHROOMS--- | BRIAN | BRIAN | | ER | P | 5780393 |
ADVANCED ELECTRIC GROUP | ER | P | 02/21/2018 | WALLS --SEE PLANS---BATHROOMS AND OFFICE AREA-- | BRIAN | BRIAN | | ER | P | 5770486 |
ADVANCED ELECTRIC GROUP | EUG | P | 02/06/2018 | inspected stubs from pool lights x5 for partial concrete pour needed to frame walls | MIGUEL | MIGUEL | | EUG | P | 5758909 |
ADVANCED ELECTRIC GROUP | EUG | P | 01/30/2018 | FORMING SHELL FOR POOL----OK ----NEED THE LIGHT SHELLS INSPECTED---- | BRIAN | BRIAN | | EUG | P | 5751656 |
ADVANCED ELECTRIC GROUP | EUG | P | 01/22/2018 | UPPER LEVEL AT BACK OF HOUSE---OK | BRIAN | BRIAN | | EUG | P | 5744029 |
ADVANCED ELECTRIC GROUP | ESL | P | 01/11/2018 | BACK OF HOUSE DEEP RUNS-----OK | BRIAN | BRIAN | | ESL | P | 5735792 |
ADVANCED ELECTRIC GROUP | ER | P | 01/09/2018 | SOME WALLS --SEE PLANS-----------NOTE --NEED APPROVED PLANS ON SITE | BRIAN | BRIAN | | ER | P | 5733354 |
ADVANCED ELECTRIC GROUP | EUG | P | 01/03/2018 | UFER--OK | BRIAN | BRIAN | | EUG | P | 5727917 |
ADVANCED ELECTRIC GROUP | EUG | R | 12/20/2017 | THIS IS A CSU INSPECTION-- | BRIAN | BRIAN | | EUG | R | 5718817 |
ADVANCED ELECTRIC GROUP | ESL | P | 11/30/2017 | CARDIO AND RECPT | BRIAN | BRIAN | | ESL | P | 5699259 |
AMERICAN PLUMBING & HEATING INC. | H= | C | 07/17/2018 | ALL CORRECTIONS MADE | JERRYF | JERRYF | | H= | C | 5904966 |
DENVER HEATING & AIR CONDITIONING | H= | C | 07/16/2018 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5902867 |
DENVER HEATING & AIR CONDITIONING | H= | L | 07/12/2018 | Called Duane (V.P. of Denver heating) with Jon B. - Permit scope still not correct and no TAB received - Duane is not sure at this time if he wants to claim the pool boilers and elected to cancel inspection today. | MARKB | MARKB | | H= | L | 5900330 |
AMERICAN PLUMBING & HEATING INC. | H= | P | 06/07/2018 | TRAINING WITH DAVE - NEED T&P DRAINS AT STEAM UNIT AND STORAGE TANK - COMPLETE PIPING AT STEAM BLOW DOWN - CONTRACTOR TO ATTACH PICTURES TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | H= | P | 5868372 |
AMERICAN PLUMBING & HEATING INC. | H= | P | 06/01/2018 | PARTIAL PENDING SOMEONE CLAIMING POOL BOILERS ON PERMIT AND COMPLETION OF ALL REGULATORS AND LABELS ON ROOF | JERRYF | JERRYF | | H= | P | 5862078 |
DENVER HEATING & AIR CONDITIONING | H= | P | 06/01/2018 | PARTIAL PENDING SOMEONE CLAIMING POOL BOILERS ON PERMIT AND TAB REPORT - ATTACH TAB REPORT TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | H= | P | 5862076 |
DENVER HEATING & AIR CONDITIONING | HV | C | 06/01/2018 | 2 POOL BOILER VENTS OK | JERRYF | JERRYF | | HV | C | 5862074 |
AMERICAN PLUMBING & HEATING INC. | HC | C | 05/23/2018 | OK TO RELEASE METER FOR 2# SYSTEM | JERRYF | JERRYF | | HC | C | 5853133 |
AMERICAN PLUMBING & HEATING INC. | HI | C | 05/23/2018 | PRESSURE TEST OK ON ALL ROOF PIPING - AT FINAL VERIFY ALL REGULATORS / FINAL CONNECTIONS / LABELS AND VENTS | JERRYF | JERRYF | | HI | C | 5853125 |
AMERICAN PLUMBING & HEATING INC. | H= | P | 05/18/2018 | NOT READY SEE PREVIOUS HI NOTES DATED 5/17 | JERRYF | JERRYF | | H= | P | 5849804 |
DENVER HEATING & AIR CONDITIONING | HV | P | 05/17/2018 | NEED POOL BOILERS CLAIMED ON PERMIT AND VENTS COMPLETED AND INSPECTION CALLED - HEAT FINAL NOTES FOR ADDITIONAL INFORMATION | JERRYF | JERRYF | | HV | P | 5848199 |
AMERICAN PLUMBING & HEATING INC. | HI | P | 05/17/2018 | NEED NEW PRESSURE TEST ON ALL ROOF PIPING DUE TO NEW ROOF BEING INSTALLED - NEED WATER HEATER VENTS COMPLETED AND GAS CONNECTED - MAY BE MORE | JERRYF | JERRYF | | HI | P | 5848197 |
DENVER HEATING & AIR CONDITIONING | H= | P | 05/17/2018 | PARTIAL FINAL FOR ALL AREAS - EXCLUDING POOL AREA AND BOILER ROOMS NEED ALL FIRE DAMPERS LABELED AT GRID - UNDERCUT ALL RESTROOM DOORS - MISSING RETURN GRILLE IN MASSAGE AREA - TAB REPORT - NEED ROOF INSPECTION | JERRYF | JERRYF | | H= | P | 5848179 |
AMERICAN PLUMBING & HEATING INC. | HSP | P | 05/15/2018 | WATER HEATER VENT LOCATIONS ARE OK | JERRYF | JERRYF | | HSP | P | 5844685 |
DENVER HEATING & AIR CONDITIONING | HV | L | 05/15/2018 | NOT READY CANCELED BY CONTRACTOR | JERRYF | JERRYF | | HV | L | 5844615 |
AMERICAN PLUMBING & HEATING INC. | HI | P | 05/14/2018 | NEED CONSULT WITH SENIOR INSPECTOR ON WATER HEATER VENT LOCATIONS NOTES: PRESSURE TEST AND PIPING OK PER PLAN TO WATER HEATERS - NEED TO RETEST ALL ROOF PIPING DUE TO ROOF REPLACEMENT - NEED LABELS / REGULATOR INSTALL MANUAL PER PREVIOUS NOTES - ALL REGULATOR VENTS AND FINAL CONNECTIONS | JERRYF | JERRYF | | HI | P | 5843507 |
DENVER HEATING & AIR CONDITIONING | HSP | P | 05/14/2018 | SOMEONE NEEDS TO CLAIM POOL BOILERS ON PERMIT AND CALL INSPECTIONS | JERRYF | JERRYF | | HSP | P | 5843503 |
DENVER HEATING & AIR CONDITIONING | H= | P | 04/13/2018 | ALL SA / RA AND EXHAUST GRILLES COMPLETE AT THE FOLLOWING RTU'S - 12 - 9 - 8 - 7 - 3 - 4 - 5 - 6 - 1 - 14 AND 2 - AT FUTURE INSPECTION VERIFY ALL SMOKE SHUTDOWN AND REMOTE INDICATORS - ROOF INSPECTION | JERRYF | JERRYF | | H= | P | 5816127 |
DENVER HEATING & AIR CONDITIONING | HD | P | 04/13/2018 | ABOVE CEILING MAINS AND RUN OUTS OK AT THE FOLLOWING RTU'S - 10 - 13 - 11 AND EF 7 - STILL NEED ALL HARD LID AREA'S IN MENS LOCKER ROOM | JERRYF | JERRYF | | HD | P | 5816123 |
AMERICAN PLUMBING & HEATING INC. | HI | P | 04/06/2018 | NEED CONSULT WITH SENIOR INSPECTOR ON GAS REGULATOR AT RTU 7 - PRESSURE TEST OK - PLAN DOES NOT MATCH INSTALLED / CONTRACTOR PROCEEDING AT OWN RISK - NEED REVISED PLAN TO MATCH INSTALLED OR PIPE TO MATCH PLAN - PLAN SHOWS ALL INTERIOR PIPING HAS ALL ROOF MOUNTED - - COULD NOT LOCATE WATER HEATER DROPS - NEED ALL REG VENTS PROPERLY VENTED / VENT LIMITERS ARE NOT APPROVED FOR EXTERIOR USE - NEED ALL LABELS - STOPPED INSPECTION | JERRYF | JERRYF | | HI | P | 5809933 |
DENVER HEATING & AIR CONDITIONING | HD | P | 03/30/2018 | FIRE DAMPER RETAINAGE OK AT ALL DAMPERS | JERRYF | JERRYF | | HD | P | 5803857 |
DENVER HEATING & AIR CONDITIONING | HD | P | 03/21/2018 | FIRE DAMPER FRAMING OK - EXHAUST FANS AND CONNECTIONS AT ROOMS 111B AND 111C | JERRYF | JERRYF | | HD | P | 5795024 |
DENVER HEATING & AIR CONDITIONING | HD | R | 03/16/2018 | NEED FIRE DAMPERS FRAMED CORRECTLY - WAIVED TRIP FEE THIS TIME | JERRYF | JERRYF | | HD | R | 5790946 |
DENVER HEATING & AIR CONDITIONING | HD | P | 03/15/2018 | STILL NEED ALL FIRE DAMPERS FRAMED CORRECTLY PER INSTALL MANUAL - ABOVE CEILING IN THE FOLLOWING AREAS OK TO WRAP - 111A - 111E - 111 - 111D - 111F - 111B - 111C - 104 - 108 - 107 - 106 - 109 - 123 - 123B - 123A - 126 - 129 | JERRYF | JERRYF | | HD | P | 5789649 |
DENVER HEATING & AIR CONDITIONING | HSP | P | 03/02/2018 | HAD CONSULT WITH G.C. AND MECHANICAL CONTRACTOR ON FIRE DAMPER INSPECTION PROTOCOL - WILL NEED ALL FRAMING EXPOSED TO VERIFY WILL NEED DAMPER INSTALL MANUAL AT TIME OF INSPECTION | JERRYF | JERRYF | | HSP | P | 5778455 |
DENVER HEATING & AIR CONDITIONING | HSP | P | 02/27/2018 | RECEIVED CALL FROM BUILDING INSPECTOR. NO MECHANICAL INSPECTIONS REQUESTED TO DATE. CALLED DOMINIC FROM DENVER HEATING TO PLEASE REQUEST AN HSP INSPECTION TO CONSULT ON DUCT PENETRATIONS IN RATED WALLS AND ANY OTHER CONCERNS OR QUESTIONS ON SITE. | JON | JON | | HSP | P | 5775678 |
AMERICAN PLUMBING & HEATING INC. | P= | C | 07/23/2018 | corrections made | JOHNS | JOHNS | | P= | C | 5910429 |
AMERICAN PLUMBING & HEATING INC. | PTO | C | 06/06/2018 | mech room piping complete, ok for test and design. note: this completes pto | JOHNS | JOHNS | | PTO | C | 5866935 |
AMERICAN PLUMBING & HEATING INC. | P= | P | 06/06/2018 | need to adjust scope of work to show all plbg related items, need 30" center to center clearance @ lavs @ women's and men's locker room, rest ok. note: contractor aware of doom strainers @ all roof drains // updated note by JW on 7/18/18 full scope of work covered in plan set | JOHNS | JOHNS | | P= | P | 5866927 |
AMERICAN PLUMBING & HEATING INC. | PRD | C | 05/23/2018 | ok for remainder of roof drains @ south side and outside racquet ball area, test and design ok. note: this completes all prd inspections | JOHNS | JOHNS | | PRD | C | 5853291 |
AMERICAN PLUMBING & HEATING INC. | P= | P | 05/21/2018 | ok for adult unisex bath @ kids area, ok for unisex kids bath @ kids area, ok for unisex accessible bath @ gym entrance -minus the shwr, ok for break room sink, and ok for front drinking fountain
inspector note: remainder of pto, remainder of prd, all water htrs, and remainder of p=still need inspected. verify all splices @ next inspetion | JOHNS | JOHNS | | P= | P | 5850698 |
AMERICAN PLUMBING & HEATING INC. | P= | R | 05/18/2018 | Water off re-inspect all | SHANEN | SHANEN | | P= | R | 5849137 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 04/25/2018 | Test ok for over head domestic water to mechanical room and in wall to hose bib by mechanical room. | DANR | DANR | | PTO | P | 5826734 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 04/17/2018 | Test ok for dwv and domestic water in wall and overhead woman's shower. | DANR | DANR | | PTO | P | 5818548 |
AMERICAN PLUMBING & HEATING INC. | PB | C | 03/19/2018 | Test ok for pool trench drain. | DANR | DANR | | PB | C | 5792239 |
AMERICAN PLUMBING & HEATING INC. | PRD | P | 03/19/2018 | Need hangers on horizontal pipe, need transition bands cast to plastic, test ok columns C and E by basketball court overhead to existing roof drains. | DANR | DANR | | PRD | P | 5792236 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 03/09/2018 | Test ok for dwv and domestic water over head womans bathroom. still need to look at all toilet flanges in building. | DANR | DANR | | PTO | P | 5784599 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 03/06/2018 | Test ok for womans restroom in wall dwv and domestic for lavatories only. | DANR | DANR | | PTO | P | 5780953 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 03/05/2018 | Test ok for area drains Southwest side of pool. | DANR | DANR | | PTO | P | 5779681 |
AMERICAN PLUMBING & HEATING INC. | PRD | P | 03/01/2018 | test ok for underground storm line, the only remaining roof drain is over head piping. | DANR | DANR | | PRD | P | 5777240 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 03/01/2018 | test ok for domestic water in wall mens showers, transfer shower stud wall opening does not meet accessible standards. | DANR | DANR | | PTO | P | 5777237 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 02/27/2018 | Test ok for dwv and domestic in wall for basket ball drinking fountain (aav in wall above), room 110 washer box in wall dwv and domestic ok, dwv in wall and over head dwv for mens shower ok. | DANR | DANR | | PTO | P | 5774930 |
AMERICAN PLUMBING & HEATING INC. | PRD | P | 02/27/2018 | Underground roof drain columns B-F and 6-8 test ok. | DANR | DANR | | PRD | P | 5774926 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 02/23/2018 | Washer dwv leak in wall room 110 fix and re-test, room 121 toilet to far off wall for accessible requirements, in wall and over head vent dwv room 121 ok, domestic water over head ok for columns E-B - 1-3 ( still need inspection columns E-H -1-5, area drains around pool ok except still need area drains on the East side of pool, still need all toilet flanges set and anchored. | DANR | DANR | | PTO | P | 5772310 |
AMERICAN PLUMBING & HEATING INC. | PRD | P | 02/23/2018 | Leak on band underground fix and re-test. | DANR | DANR | | PRD | P | 5772301 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 02/20/2018 | Lacking nail protection womans bathroom, test ok for overhead domestic water mains east side to womans bathroom and over basket ball court, in wall domestic and dwv for womans bathroom toilets test ok. added hose bib by pool ok need to add to scope and drawings. | DANR | DANR | | PTO | P | 5768762 |
AMERICAN PLUMBING & HEATING INC. | PRD | R | 02/12/2018 | Need under ground roof drains on test, need proper transition band, still need engineered and spliced in drawings for changes on roof drains. | DANR | DANR | | PRD | R | 5763025 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 02/06/2018 | Test ok for room 108 overhead venting. | DANR | DANR | | PTO | P | 5757917 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 02/05/2018 | Test ok for moved accessible bathroom to room 127c and moved laundry, need to have drawings spliced in, cover at own risk. | DANR | DANR | | PB | P | 5756840 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 02/05/2018 | Test ok for over head vent piping in room 123, added ice maker box room 108, still need to get drawings spliced in and roof drain change engineered and spliced in, need to add drinking fountain and ice maker box to scope of work. | DANR | DANR | | PTO | P | 5756740 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 01/30/2018 | Test and design ok for in wall dwv and 2" drain line for stand pipe room 108. Note: still need drawings updated and spliced in for roof drain and plumbing changes. | DANR | DANR | | PTO | P | 5751215 |
AMERICAN PLUMBING & HEATING INC. | PTO | P | 01/29/2018 | In wall only for domestic water and dwv, rooms 123B, 111B, 111C,and 108, room 108 stand pipe need to be 2" per drawing p500 detail 21. Note: need to inspect flanges with over head piping, still need engineer drawings spliced in for roof drain change and plumbing changes. | DANR | DANR | | PTO | P | 5749974 |
AMERICAN PLUMBING & HEATING INC. | PTO | R | 01/26/2018 | Not ready, low dwv test, need proper gauge and test on domestic water, lacking nail protection, need to have changes on dwv at handicap urinal tested when complete, the changes in rooms 110 and 121 need to have the drawings spliced in, roof drain underground change still needs to have engineer drawing and be spliced in. | DANR | DANR | | PTO | R | 5748587 |
AMERICAN PLUMBING & HEATING INC. | PB | C | 01/12/2018 | Test and design ok. This completes the plumbing base. | DANR | DANR | | PB | C | 5736771 |
AMERICAN PLUMBING & HEATING INC. | PRD | P | 12/22/2017 | Need plans revised showing roof drain main on South side moved underground, cover at own risk test ok, | DANR | DANR | | PRD | P | 5721031 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 12/19/2017 | Test and design ok, South East of H line is the only remaining underground that needs inspected. | DANR | DANR | | PB | P | 5716973 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 12/14/2017 | test ok, from spa area to clean out before women bathroom | JOSEPHD | JOSEPHD | | PB | P | 5712545 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 12/13/2017 | Test and design ok for East showers in locker room. | DANR | DANR | | PB | P | 5711275 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 11/30/2017 | back to back restrooms and lounge sink, mens locker room toilets lavs and urinals o.k. see plans, plans call for type ''L'' copper, will need engineers letter if using something different | JOEL | JOEL | | PB | P | 5698787 |
AMERICAN PLUMBING & HEATING INC. | XPS | P | 04/25/2018 | PLAN SPLICE: (No Fee) by: JOEL for Plumbing: CHANGED ROOF DRAINS | JOEL | JOEL | | XPS | P | 5826784 |
AMERICAN PLUMBING & HEATING INC. | XPS | T | 03/29/2018 | PAID (REC#1490463) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice3 29-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5802402 |
WANER CONSTRUCTION COMPANY, INC. | XBS | T | 03/01/2018 | PAID (REC#1485668) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise assembly to include metal roof truss | MICHAELA | MICHAELA | | XBS | T | 5777266 |
WANER CONSTRUCTION COMPANY, INC. | XBS | T | 02/15/2018 | PAID (REC#1482854) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added ramp and details; minor floor plan revisions; labelled rated wall | LBENNETT | LBENNETT | | XBS | T | 5767140 |
ADVANCED ELECTRIC GROUP | XES | P | 02/15/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: See summary of changes. | BERTHA | BERTHA | | XES | P | 5766449 |
DENVER HEATING & AIR CONDITIONING | XMS | P | 02/15/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised exhaust to remove EF-9 | JUSTINC | JUSTINC | | XMS | P | 5766390 |
AMERICAN PLUMBING & HEATING INC. | XPS | P | 02/15/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 2-15-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5766312 |
WANER CONSTRUCTION COMPANY, INC. | XBS | T | 02/06/2018 | PAID (REC#1480484) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revised exterior framed walls to CMU | MICHAELA | MICHAELA | | XBS | T | 5757971 |
DENVER HEATING & AIR CONDITIONING | XMS | T | 01/30/2018 | PAID (REC#1480486) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas,bathroom location, RTU schedule | JUSTINC | JUSTINC | | XMS | T | 5752303 |
ADVANCED ELECTRIC GROUP | XES | P | 01/30/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised lighting E101. Revised power E201 – background changes, deleted receptacles. Revised Mechanical Equipment Schedule E501. Revised panels E502. | BERTHA | BERTHA | | XES | P | 5751279 |