ALEXANDHER BUILDING CO, INC. | B= | C | 04/10/2018 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 5812426 |
ALEXANDHER BUILDING CO, INC. | B= | P | 04/04/2018 | pending completion of mech final building okay / eng letter for pads on file. Additional Inspections Required (computer generated): AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 5807649 |
ALEXANDHER BUILDING CO, INC. | B= | P | 03/27/2018 | Temp CO: pending finals ( Expires: 4/26/2018 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5800150 |
ALEXANDHER BUILDING CO, INC. | B= | P | 03/26/2018 | need to complete elec and mech finals / need to complete pipe and valve protection at womens rest room sink / need to complete pipe and valve protection at mens room sink /grab bar behind mens room toilet to extend a minimum of 24" from center of toilet -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: ckauffman@tri-lakesfire.com or 484-0911), External Agency Inspection Z= by TOWNOFMON is not Completed yet (Contact: Tom Martinez at 884-8036), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 5798906 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 02/21/2018 | pending completion of other required inspections frame okay / still need observation letter for pads | BOBF | BOBF | | BFR | P | 5770269 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 02/12/2018 | need mech attached and rough completed, pending completion of plumb, elec and mech roughs, wall framing okay | BOBF | BOBF | | BFR | P | 5763150 |
ALEXANDHER BUILDING CO, INC. | BSP | P | 01/29/2018 | reviewed accessible elements / 3-post base connections to new pads okay / will need eng observation of all new footings and pads | BOBF | BOBF | | BSP | P | 5750236 |
EL PASO ELECTRIC, LLC. | E= | C | 04/10/2018 | | CRAIG | CRAIG | | E= | C | 5812425 |
EL PASO ELECTRIC, LLC. | E= | T | 04/04/2018 | PAID (REC#1492740): corrections not made from previous inspection | CRAIG | CRAIG | | E= | T | 5807452 |
EL PASO ELECTRIC, LLC. | E= | P | 03/27/2018 | install handle ties in panels ----------- label panel to match plans --------- label sign switch disconnect outside ----------- have all panels opened up | CRAIG | CRAIG | | E= | P | 5800192 |
EL PASO ELECTRIC, LLC. | E= | P | 03/23/2018 | plugs only | CRAIG | CRAIG | | E= | P | 5797981 |
EL PASO ELECTRIC, LLC. | ER | C | 03/12/2018 | above drop ceiling ok | CRAIG | CRAIG | | ER | C | 5786010 |
EL PASO ELECTRIC, LLC. | ER | P | 02/22/2018 | hard lids soffit complete | BRET | BRET | | ER | P | 5771578 |
BJ COMPANY, LLC | E= | C | 02/22/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5771572 |
BJ COMPANY, LLC | ER | C | 02/22/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 5771570 |
EL PASO ELECTRIC, LLC. | ER | R | 02/21/2018 | need to attach fire alarm to permit --------- will need to cut dry wall in area' s ----------- entry soffit ok | CRAIG | CRAIG | | ER | R | 5770403 |
EL PASO ELECTRIC, LLC. | ER | P | 02/16/2018 | soffit can lights from metal beam to north to wall only ok | CRAIG | CRAIG | | ER | P | 5767394 |
EL PASO ELECTRIC, LLC. | ER | P | 02/12/2018 | walls only ok | CRAIG | CRAIG | | ER | P | 5762970 |
EL PASO ELECTRIC, LLC. | ER | R | 02/09/2018 | lower all switches to 48 " to top -------- and move last 2 dryer area switches need reach range for dryer area ----------- Discussed accessiblity requirements with contractor / | CRAIG | CRAIG | | ER | R | 5762013 |
AIRTECH MECHANICAL, INC. | H= | C | 04/04/2018 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5807759 |
AIRTECH MECHANICAL, INC. | H= | P | 03/22/2018 | INTERLOCK OVEN WITH HOOD, SEE M1.2 NOTE 3. NEED REVISED/APPROVED PRINT FOR TRANSFER GRILL, NO SENSOR IN OFFICE AND ONLY USING TWO T-STATS TO CONTROL SYSTEMS. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5796194 |
AIRTECH MECHANICAL, INC. | H= | L | 03/21/2018 | LOCKED AT 6:17 PM. ALREADY RESCHEDULED FOR TOMORROW. | NANCY | NANCY | | H= | L | 5795851 |
AIRTECH MECHANICAL, INC. | HD | P | 03/07/2018 | CORRECTIONS ABOVE CEILING OK, SEE IMAGES. | NANCY | NANCY | | HD | P | 5781797 |
AIRTECH MECHANICAL, INC. | HD | P | 02/15/2018 | IF NOT INSTALLING 18 X 12 TRANSFER GRILL IN DRY ROOM 108B NEED REVISED/APPROVED PRINT OR LETTER FROM ENGINEER DELETING GRILL. ROUGH DUCTS ABOVE CEILING OK, OK TO WRAP, SEE NOTE 503.2.7 2009 IECC COMPLIANCE. SEAL MISSED JOINT ON BATH EXHAUST NEAR ATTIC ACCESS. BRING BATH EXHAUST THROUGH SHEET ROCK CEILING. NO DRYER VENT, HOODS OR ROOF YET. | NANCY | NANCY | | HD | P | 5766934 |
DRUMMOND PLUMBING LLC | PTO | C | 03/23/2018 | Complete | SHANEN | SHANEN | | PTO | C | 5797470 |
DRUMMOND PLUMBING LLC | P= | C | 03/23/2018 | | SHANEN | SHANEN | | P= | C | 5797459 |
DRUMMOND PLUMBING LLC | PTO | P | 02/12/2018 | Need VTR penetrations, rest OK, DWV and water distribution test OK | SHANEN | SHANEN | | PTO | P | 5763056 |
DRUMMOND PLUMBING LLC | PB | C | 01/22/2018 | DWV underground test OK | SHANEN | SHANEN | | PB | C | 5743538 |
AIRTECH MECHANICAL, INC. | XMS | T | 04/03/2018 | PAID (REC#1491353) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 4-3-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5805997 |