H.W. HOUSTON CONSTRUCTION LLC | B= | C | 03/18/2020 | | DAKOTAB | DAKOTAB | | B= | C | 6514495 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 01/15/2020 | Temp CO: Pending Mechanical / and Zoning Final ( Expires: 2/14/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6453394 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 01/15/2020 | Temp CO: OK per MM ( Expires: 2/14/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6453393 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 01/14/2020 | Building final changed from rejected to partial, all foundation paperwork now on file -- Building final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), BLUE FLAME GAS Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6452646 |
H.W. HOUSTON CONSTRUCTION LLC | BFT | C | 01/14/2020 | Open hole received -- 2400 PSF | DAKOTAB | DAKOTAB | | BFT | C | 6452643 |
H.W. HOUSTON CONSTRUCTION LLC | B= | R | 01/13/2020 | Still need open hole -- All other items from previous inspections corrected. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), BLUE FLAME GAS Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6451176 |
H.W. HOUSTON CONSTRUCTION LLC | BFT | P | 01/13/2020 | Still need open hole -- Engineer letter for footing and tendon stressing and elongation received | DAKOTAB | DAKOTAB | | BFT | P | 6451171 |
H.W. HOUSTON CONSTRUCTION LLC | B= | R | 01/06/2020 | Need all foundation engineering and open hole -- East tower re=inspection and west tower inspection -- EAST TOWER - Garage F and storage F door not self closing -- Other items corrected WEST TOWER -- Need to fix stucco at light and sprinkler at 3rd floor landing -- 308 - Attic access not self closing -- 206 - Need to fix drywall at mech. room lid -- 107- (TYPE A UNIT) Need non positive shut off at hand control for bathtub -- Cabinet and countertop in clear floor space for bathtub -- Need to install all grab bars at bathtub | DAKOTAB | DAKOTAB | | B= | R | 6443937 |
H.W. HOUSTON CONSTRUCTION LLC | B= | R | 12/26/2019 | Need all foundation engineering -- Final inspection for east tower -- 304 - Need to repair stucco on balcony -- 104 - Missing 40" clearance from counter edge to refrigerator in kitchen -- 102 - Missing 40" clearance from counter edge to refrigerator in kitchen -- Garage E - Need engineer detail for soffit built in garage --All garage and storage room doors to be self closing -- Complete other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), BEFORT CONSTRUCTION Plumbing Final Inspection is not Completed yet, BLUE FLAME GAS Mechanical Final Inspection is not Completed yet, R & R HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6437471 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 09/11/2019 | ABOVE HARD LID -- garage soffit penetrations complete | SCOTTS | SCOTTS | | BSP | P | 6331433 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 09/06/2019 | GYPSUM FASTENING -- garage gypsum fastening now complete | SCOTTS | SCOTTS | | BSP | P | 6326431 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 09/04/2019 | LATH -- east tower exit enclosure lath complete | SCOTTS | SCOTTS | | BLA | P | 6323351 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 08/30/2019 | EAST TOWER PENETRATIONS -- corrections complete | SCOTTS | SCOTTS | | BSP | P | 6320211 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 08/29/2019 | ABOVE HARD LID REINSPECTION -- 202/304 not corrected -- patches still incomplete throughout | SCOTTS | SCOTTS | | BSP | R | 6318246 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 08/26/2019 | ABOVE HARD LID PENETRATIONS -- 103 seal duct penetration bearing wall -- 201 patch blank holes/screws -- 202 bath lid condensation lines -- 304 vent fan penetration -- patches observed throughout not attached per listings on walls and lids/need to see corrected | SCOTTS | SCOTTS | | BSP | P | 6313870 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 08/21/2019 | LATH-- west tower exit enclosure lath now complete | SCOTTS | SCOTTS | | BSP | P | 6308789 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 08/19/2019 | GYPSUM FASTENING -- garage gypsum fastening incomplete/missing screws throughout -- ABOVE HARD LID PENETRATIONS -- inspection stopped/seal all penetrations/seal screwheads in wall and ceiling -- sealing of gas line penetrations in garage top plate completed | SCOTTS | SCOTTS | | BSP | R | 6305278 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | R | 08/16/2019 | LATH -- west tower exit enclosure lath/seal over penetrated staples throughout | SCOTTS | SCOTTS | | BLA | R | 6303462 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/25/2019 | GYPSUM FASTENING -- east tower/units only/garages incomplete -- gypsum fastening per L528/U305/U356/U344/P545 is per listings all three floors | SCOTTS | SCOTTS | | BSP | P | 6276823 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/23/2019 | GYPSUM FASTENING EXIT ENCLOSURE LIDS and LANDINGS -- gypsum fastening per UL L528 on landings/ missing gyp on beam 1st floor east tower/missing screws on 3rd floor lid per P545 east tower -- west tower gypsum fastening per listings | SCOTTS | SCOTTS | | BSP | P | 6273570 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/18/2019 | INTERIOR SHEAR 1ST FLOOR EAST TOWER -- S4/S6 walls per plan | SCOTTS | SCOTTS | | BSP | P | 6268499 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/16/2019 | RC INSPECTION EAST TOWER -- 1st floor RC for lids complete per listing -- penetrations corrected from previous inspections | SCOTTS | SCOTTS | | BSP | P | 6264496 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 07/15/2019 | EXTERIOR THERMAL -- East tower 1st/2nd/3rd floor exterior thermal complete | SCOTTS | SCOTTS | | BIN | P | 6263183 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/15/2019 | RC INSPECTION --East Tower 2nd and 3rd floor RC on lids installed per listings/1st floor not ready | SCOTTS | SCOTTS | | BSP | P | 6263182 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/10/2019 | GYP FASTENING / WEST TOWER - 3rd - 2nd - 1st flr UNITS ONLY / observed gyp - gyp fastening at units / corrections completed during inspection | BRIANB | BRIANB | | BSP | P | 6259491 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/09/2019 | PENETRATIONS EAST TOWER -- floors 1/2/3 penetrations sealed/ provide putty packs in garage front of unit 104 for bearing wall electric boxes | SCOTTS | SCOTTS | | BSP | P | 6257134 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 07/08/2019 | PENETRATIONS EAST TOWER -- field cancelled by Mike | SCOTTS | SCOTTS | | BSP | L | 6255740 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/03/2019 | 1st FLOOR SHEAR WEST TOWER -- shear walls S4 and S6 constructed per plan for sheathing and fastening | SCOTTS | SCOTTS | | BSP | P | 6252596 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/01/2019 | RC AT LANDINGS FOR EXIT ENCLOSURE -- RC per listing UL L516 completed per listing all landings/both exit enclosures | SCOTTS | SCOTTS | | BSP | P | 6249677 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 06/28/2019 | RC INSPECTION WEST TOWER GARAGE LIDS -- missing drywall at rim for balcony per detail 6 on A23 -- rest of RC per L528 installed on garage lids -- still need to seal penetrations for gas lines in garage and 2nd floor west tower | SCOTTS | SCOTTS | | BSP | P | 6247584 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 06/27/2019 | EXTERIOR THERMAL WEST TOWER -- exterior thermal all 3 floors complete | SCOTTS | SCOTTS | | BIN | P | 6246192 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 06/27/2019 | WEST TOWER RC -- reseal gas line penetrations 2nd floor/still need to complete 1st floor gas line penetrations -- observed RC installed per P545/L528/L516 on ceilings/all units complete -- landings in exit enclosure RC per listing -- lid on exit enclosure incomplete/garage lids incomplete | SCOTTS | SCOTTS | | BSP | P | 6246190 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 06/19/2019 | WEST TOWER FRAME AND PENETRATIONS REINSPECTION -- 1st floor gas line penetrations still incomplete -- 2nd and 3rd floor corrections completed | SCOTTS | SCOTTS | | BSP | P | 6236464 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 06/14/2019 | 1ST FLOOR PENETRATIONS WEST TOWER -- penetrations not sealed throughout/reinspect all | SCOTTS | SCOTTS | | BSP | R | 6231407 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 06/11/2019 | PENETRATIONS 2ND and 3RD FLOOR WEST TOWER -- corrections not completed per previous inspection on 3rd floor -- seal penetrations for drains in shower walls 206/205 -- seal water closet top plates 206 -- missing putty packs unit 306/top plate blank hole 306 | SCOTTS | SCOTTS | | BSP | R | 6226877 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 06/11/2019 | 1ST FLOOR FRAME WEST TOWER -- 1st floor frame per plan/correct draftstopping throughout | SCOTTS | SCOTTS | | BFR | P | 6226872 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/24/2019 | PARTIAL PENETRATION INSPECTION -- 3rd floor/missing protection on ice boxes whole floor -- seal exterior wall penetrations at water closets -- unit 302/308 seal vent penetrations at shower wall -- provide listing for low volt wire bundles -- 2nd and 1st floor cancelled by site Rep MIke | SCOTTS | SCOTTS | | BSP | P | 6210172 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 05/15/2019 | 2nd FLOOR FRAMING inspection -- frame only/ penetrations at later date -- frame is per plan -- complete other rough inspections | SCOTTS | SCOTTS | | BFR | P | 6200082 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/13/2019 | 2nd floor frame inspection/missing uplfit connectors/king studs/straps at top plates throughout | SCOTTS | SCOTTS | | BSP | P | 6196927 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 05/08/2019 | PARTIAL / PRE-INSULATION AT CONCEALED SPACE AT FIRE BARRIER EXIT ENCLOSURE WALLS / observed batt insulation at concealed floor-ceiling space / pending other rough inspections | BRIANB | BRIANB | | BIN | P | 6192736 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/26/2019 | partial inspection for both exit enclosure landings per UL L516/RC installed per listing on bottom of landings/penetrations on side walls and front sealed -- exit enclosure lid per UL P545/RC installed per listing/ still need detail showing girder truss protection at top of enclosure where vertical flat truss is in between 2 different levels of horizontal assembly | SCOTTS | SCOTTS | | BSP | P | 6179679 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 04/26/2019 | north and east wall lath ok -- balconies inspected previously with 2 layers of rock on perimeter and underside per detail | SCOTTS | SCOTTS | | BLA | P | 6179664 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 04/25/2019 | 3rd floor frame inspection only/ penetrations on different inspection -- wrap stud packs for girder trusses per letter provided -- strap top plates where cut out for mechanical | SCOTTS | SCOTTS | | BFR | P | 6178101 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/23/2019 | missing king studs throughout -- missing attic tape measures throughout -- plumbing is incomplete/cancelled by site rep Mike -- training with Brian B/walked site/discussed 5A construction/ reviewed NFPA13R 2009 IBC 903.3.1.2 and 903.3.1.2.1 balconies and decks/reviewed listings for exit enclosure/shear walls/reviewed code study/plan sticker/plan review notes | SCOTTS | SCOTTS | | BSP | P | 6174886 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/23/2019 | Training with PPRBD inspector Scott / VA construction / went through building and reviewed rated assemblies - plan sticker and code study / balconies - IBC 903.3.1.2 balconies and decks / fire barriers at exit enclosures and continuity at concealed space / discussed roof - ceiling assembly P545 / went through inspection history for building | BRIANB | BRIANB | | BSP | P | 6174880 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 04/22/2019 | field cancelled on site by field rep Mike/not ready | SCOTTS | SCOTTS | | BSP | L | 6173626 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 04/19/2019 | lath on south and east elevations ok | SCOTTS | SCOTTS | | BLA | P | 6171643 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 04/08/2019 | partial framing inspection 2nd floor -- penetrations incomplete being sealed at this time -- strap top plates on bearing walls where over bored and plate breaks throughout -- missing 3rd king ee of window in 206 -- provide mechanical connection for uplift all girder trusses throughout floor | SCOTTS | SCOTTS | | BFR | P | 6158884 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/02/2019 | provide letter for damage top chord on P122 unit 308 -- provide clarification on CS18x24" strap installation/currently end grained nailed some locations and blocked other locations -- training with Brian B | SCOTTS | SCOTTS | | BSP | P | 6152278 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/25/2019 | FRAME AND INSULATION INSPECTION PRIOR TO PRE ROCK AT TUBS ALL UNITS: 108 , 107, 104, 103 - observed plumbing in shear walls behind tubs will need reinspection once plumbing is moved / all 2nd and 3rd floor units OK / reviewed accessible elements with site reps Mike and Nate | LONNYS | LONNYS | | BSP | P | 6143893 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/21/2019 | met with site rep Nate and discussed roof ceiling assembly in exit enclosures - including UL P522 - and protection of structural members for type VA construction | LONNYS | LONNYS | | BSP | P | 6140390 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/20/2019 | previous inspection entered for building 4 / 3RD FLOOR FRAME - INSULATION - PRE ROCK INSPECTION AT TUBS ALL UNITS / 305 OK / 307 OK / 308 - observed vapor barrier behind pre rock and missing pre rock at exterior wall / 306 OK / 302 - missing pre rock at top of skinny wall behind tub / 304 - missing mud and tape both tubs - vapor barrier behind pre rock both tubs / 301 missing mud and tape both tubs - vapor barrier behind pre rock both tubs / 303 - missing mud and tape at pre rock | LONNYS | LONNYS | | BSP | P | 6139017 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 03/20/2019 | FRAME AND INSULATION INSPECTION PRIOR TO PRE-ROCK AT TUBS / site cancelled per site rep Mike - not ready | LONNYS | LONNYS | | BSP | R | 6139013 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/12/2019 | discussed inspection process with site rep Mike for projecting exterior decks - including framing and first and second layers of GYP | LONNYS | LONNYS | | BSP | P | 6132334 |
H.W. HOUSTON CONSTRUCTION LLC | BFI | P | 03/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letters from Entech and EV studious for foundation inspections to follow | LONNYS | LONNYS | | BFI | P | 6131072 |
H.W. HOUSTON CONSTRUCTION LLC | BFN | P | 03/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letters from Entech and EV studious for foundation inspections to follow | LONNYS | LONNYS | | BFN | P | 6131071 |
H.W. HOUSTON CONSTRUCTION LLC | BFT | P | 03/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letters from Entech and EV studious for foundation inspections to follow | LONNYS | LONNYS | | BFT | P | 6131069 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 03/08/2019 | inspection cancelled on site / had conversation with site rep about having request completed upon arrival | LONNYS | LONNYS | | BSP | R | 6127817 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/07/2019 | EAST and WEST TOWER EXIT ENCLOSURE GYP AND FASTENING AT WALLS ONLY: gyp and fastening for both exit enclosure walls only OK per UL - U305 - still need to inspect all landing framing, penetrations in walls, and stair floor / ceiling system // pending other roughs | LONNYS | LONNYS | | BSP | P | 6127428 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 02/22/2019 | EXTERIOR SHEAR FASTENING AND EXIT ENCLOSURE RC -- all exterior shear fasting OK - inspection entered for 3296 Divine hts. 12-18-18 // RC observed at east and west exit enclosures OK / met with site rep mike and walked site to discuss exhaust vents and top plate penetration at interior load bearing walls - also discussed inspection processes and required inspections | LONNYS | LONNYS | | BSP | P | 6115098 |
H.W. HOUSTON CONSTRUCTION LLC | BE | L | 08/24/2018 | Renewed at 8/24/2018 8:13:37 AM | NELIDA | NELIDA | | BE | L | 5944609 |
DILLER ELECTRIC LLC | E= | C | 12/13/2019 | Splice on plans complete / series rating labels on gear as requested | CHIPO | CHIPO | | E= | C | 6427696 |
DILLER ELECTRIC LLC | E= | P | 12/11/2019 | Need to splice prints with Series Rating info and install Series labels on panels per 110.22 / | ROB | ROB | | E= | P | 6423666 |
DILLER ELECTRIC LLC | E= | P | 12/10/2019 | East tower stairs, garages ,storage rooms, and common areas ok / West tower garage oh door recpts have gfci protection / | ROB | ROB | | E= | P | 6422010 |
DILLER ELECTRIC LLC | E= | P | 12/09/2019 | Need GFCI protection for OH Door openers / West tower common area ok / | ROB | ROB | | E= | P | 6420466 |
DILLER ELECTRIC LLC | E= | C | 10/29/2019 | FIRE ALARM INSPECTION: FA complete / | ROB | ROB | | E= | C | 6382667 |
DILLER ELECTRIC LLC | E= | P | 10/29/2019 | 204- Bathroom recpts not working / 104- Breaker for washer not functioning / 103- Mech room light covered by HWH vent pipe / 202- ok / 202 has 20/2 for condenser / 103,104,204 has 25/2 for condensers / | ROB | ROB | | E= | P | 6382666 |
DILLER ELECTRIC LLC | E= | P | 10/25/2019 | 301 plate is installed and reversed polarity corrected / 303 DW breaker ok / 201 GFCI recpt cover on deck not installed properly / 203 GFCI recpt cover on deck not installed properly, gas pipe in front of recpt. and hwh vent piping blocking lamp on keyless in HWH closet / | ROB | ROB | | E= | P | 6380319 |
DILLER ELECTRIC LLC | E= | P | 10/24/2019 | 301 missing plate behind door,GFCI cover not installed properly, mech room ckt no working properly, reversed polarity in ne bedroom / 303 DW breaker not functioning / 301,303,304 has 25/2, 302 has 20/2 / | ROB | ROB | | E= | P | 6379659 |
DILLER ELECTRIC LLC | E= | P | 10/23/2019 | 108 needs hood installed in Type A unit / 107,108 25/2 for AC's / Contractor submitting splice for series rated breakers / | ROB | ROB | | E= | P | 6378664 |
DILLER ELECTRIC LLC | E= | P | 10/22/2019 | 306 closet light ok / 307 bath fan ok / 206 ok / Need to provide paperwork for in use cover mounting for 205,207,208 / All panels should have minimun 15k breakers / 25/2 breakers installed for condensers in 205,206,207,208 / | ROB | ROB | | E= | P | 6376909 |
DILLER ELECTRIC LLC | E= | P | 10/21/2019 | 305,306,307,308 need t-stats for hwh closet heaters / 306 closet light not working / 307 bath fan trips breaker / 307,308 25/ for AC / 305,306 20/2 for AC / | ROB | ROB | | E= | P | 6374792 |
DILLER ELECTRIC LLC | ES | P | 09/16/2019 | Commercial Service: 1 - 500 amp 3 wire UG, ok to set 9 apartment meters / 1 - 800 amp 3 wire UG, ok to set 11 apartment meters and 1 house panel meter / ------------------------------------ / Need 500 amp fuses in service #2 / Need labels on each service disconnect stating Service Disconnect 1 of 2 and Service Disconnect 2 of 2 / 250 SER installed for house panel instead of 3/0cu, need to correct or re-submit / Water pipe jumpers complete / | ROB | ROB | | ES | P | 6336404 |
DILLER ELECTRIC LLC | ER | P | 06/11/2019 | FIRE ALARM INSPECTION: Rough ok for garage and storage / | ROB | ROB | | ER | P | 6226963 |
DILLER ELECTRIC LLC | ER | P | 06/11/2019 | Rough ok for garages and storage rooms / | ROB | ROB | | ER | P | 6226959 |
DILLER ELECTRIC LLC | ER | P | 06/10/2019 | FIRE ALARM INSPECTION: Rough ok for both breezeways / | ROB | ROB | | ER | P | 6225373 |
DILLER ELECTRIC LLC | ER | P | 06/10/2019 | Rough ok for 250 SER AL to House Panel / 3/0 CU to Rebar-Need to check cad weld / 3/0 CU to water pipe-no terminaion yet / Both breezeways ok / 6 ceiling in HWH closets / | ROB | ROB | | ER | P | 6225368 |
DILLER ELECTRIC LLC | ER | P | 02/25/2019 | rough in inspection bldg 2 all okay except meter stack wall, house panel wall, soffits, and 3rd floor corridor. | CHIPO | CHIPO | | ER | P | 6116955 |
DILLER ELECTRIC LLC | ER | P | 02/25/2019 | FIRE ALARM INSPECTION: all except 3rd floor corridor okay | CHIPO | CHIPO | | ER | P | 6116951 |
DILLER ELECTRIC LLC | ESL | P | 10/02/2018 | ESL ok for kitchen island stubs / Discussed accessibility requirements with contractor / | ROB | ROB | | ESL | P | 5982582 |
BLUE FLAME GAS COMPANY, INC. | H= | C | 01/22/2020 | METER VERIFICATION FROM CSU RECEIVED | MARKB | MARKB | | H= | C | 6459638 |
R & R HEATING & AIR CONDITIONING, INC. | H= | C | 01/09/2020 | Corrections made | MARKB | MARKB | | H= | C | 6448077 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 01/07/2020 | WEST TOWER: CONDENSATE LINES FOR FCU'S UNDER SINKS COMPLETE FOR UNITS 108, 206, 307, 308, 306. Still need water heater leveled in unit 107 EAST TOWER: FINAL WALK - Need to clamp condensate line at water heater vents in units 103, 202, 203, 204, 301, 302, 304. FAN COILS, WATER HEATER VENT TERMINATIONS, CONDENSERS AND GRILLS COMPLETE. | MARKB | MARKB | | H= | P | 6445733 |
BLUE FLAME GAS COMPANY, INC. | H= | P | 01/07/2020 | FOR FINAL - Need meter verification from CSU FINAL WALK OF WATER HEATER CLOSETS FOR EAST/WEST TOWERS COMPLETE | MARKB | MARKB | | H= | P | 6445727 |
BLUE FLAME GAS COMPANY, INC. | HI | C | 12/31/2019 | FOR FINAL - Will need access to water heater closets in each unit and meter verification letter from CSU. PLAN SPLICE IS ON FILE FOR METER RE LOCATES, PIPES ARE PROTECTED IN GARAGE AND METERS HAVE BEEN TAGGED WITH UNIT NUMBERS. | MARKB | MARKB | | HI | C | 6440748 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 12/13/2019 | WEST TOWER: FINAL WALK - Condensate lines for FCU'S have a kink under sink in units 108, 206, 307, 308, 306. Need water heater condensate tied to floor drain cover in unit 108. Unit 107 level water heater. Rest OK. | MARKB | MARKB | | H= | P | 6428159 |
BLUE FLAME GAS COMPANY, INC. | HC | C | 10/30/2019 | OK TO RELEASE ALL METERS | MARKB | MARKB | | HC | C | 6383474 |
R & R HEATING & AIR CONDITIONING, INC. | HV | P | 10/29/2019 | BUILDING #2 EAST TOWER WATER HEATER VENTING IN MECHANICAL CLOSETS OK. BY FINAL: CONFIRM SUPPORTS AND CONCENTRIC TERMINATION CAPS | BILLS | BILLS | | HV | P | 6383198 |
R & R HEATING & AIR CONDITIONING, INC. | HV | P | 10/25/2019 | BUILDING #2 WEST TOWER WATER HEATER VENTING IN MECHANICAL CLOSETS OK. BY FINAL: CONFIRM SUPPORTS AND CONCENTRIC TERMINATION CAPS | BILLS | BILLS | | HV | P | 6381328 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 09/03/2019 | EAST TOWER: CONDENSATE PIPING FOR FCU'S COMPLETE IN UNITS 103, 203, 301 & 304 | MARKB | MARKB | | HWP | P | 6322478 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 09/03/2019 | EAST TOWER: 1ST, 2ND & 3RD FLOORS DUCT/FCU'S BELOW PRE-ROCK COMPLETE. | MARKB | MARKB | | HD | P | 6322477 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 08/29/2019 | BUILDING #2 EAST TOWER. PRIMARY AND SECONDARY FAN COIL DRAINS OK ON ALL UNITS EXCEPT FOR #103 AND #203 NEED NAIL PROTECTION, AND UNITS #301 AND #304 HAVE ALREADY BEEN DRYWALLED. | BILLS | BILLS | | HWP | P | 6319388 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 08/16/2019 | BUILDING #2 WEST TOWER ALL UNITS. ALL BELOW DRYWALL IN SOFFIT DUCTWORK OK. | BILLS | BILLS | | HD | P | 6304327 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 08/13/2019 | BUILDING #2 WEST TOWER. ALL UNITS. FAN COIL HYDRONIC TIE-INS AND ABOVE CEILING CONDENSATE DRAINS OK | BILLS | BILLS | | HWP | P | 6299033 |
R & R HEATING & AIR CONDITIONING, INC. | HRR | P | 08/13/2019 | BUILDING #2, WEST TOWER. MULTIPLE UNITS MISSING OPENINGS AND DRYWALL WRAP AT SAME, RE-INSPECT ALL | BILLS | BILLS | | HRR | P | 6299016 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 07/09/2019 | ALL CORRECTIONS MADE TO SUPPLY AND RETURN LINE INSULATION, 65LB TESTS OK AT UNITS #202 AND #304 | BILLS | BILLS | | HWP | P | 6257779 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 07/01/2019 | EAST TOWER -- 65LB TEST OK FOR ALL UNITS EXCEPT #202 AND #304. ALL UNITS IN WALL CONDENSATE OK. #204-COMPLETE INSULATION AT MECH CLOSET WALL, #301 RAISE AND SUPPORT PIPES IN CEILING OF #201, #304 COMPLETE INSULATION IN CEILING OF #204, #302 FIX INSULATION ON PIPES AT FLOOR PENETRATIONS | BILLS | BILLS | | HWP | P | 6250469 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 06/26/2019 | Unit #305 complete, east tower not ready. | MARKB | MARKB | | HWP | P | 6245603 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 06/21/2019 | 65 PSI PRESSURE TEST ON SUPPLY/RETURN LINES ABOVE PRE-ROCK OK FOR ALL FLOORS OF WEST TOWER EXCEPT FOR UNIT 305 HAS LOW TEST AND NEEDS TO BE CHANGED AT KITCHEN WALL. | MARKB | MARKB | | HWP | P | 6240412 |
R & R HEATING & AIR CONDITIONING, INC. | HSP | L | 06/04/2019 | Field Cancelled | MARKB | MARKB | | HSP | L | 6220121 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | L | 05/14/2019 | Not ready | MARKB | MARKB | | HWP | L | 6199091 |
BLUE FLAME GAS COMPANY, INC. | HI | P | 04/02/2019 | -----PLAN SPLICE NEEDED FOR CHANGED METER LOCATION----- Drops in mechanical closets lack support and some installed in front of door. Gas piping in garage is exposed where it can be hit by a car. 10 PSI PRESSURE TEST ON ALL UNITS OK PIPE SIZE PER PLAN. Will need all stubs at meter labeled with address tag. | MARKB | MARKB | | HI | P | 6152809 |
R & R HEATING & AIR CONDITIONING, INC. | HRP | P | 04/01/2019 | 300 PSI PRESSURE FOR 20 UNITS COMPLETE, LINESETS OK FOR SUPPORT, INSULATION AND NAIL PROTECTION ENTIRE BUILDING. Still need condensate and hydronic lines for FCU'S. | MARKB | MARKB | | HRP | P | 6151523 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 04/01/2019 | ----NEED MECHANICAL CONTRACTOR ATTACHED TO PERMIT FOR, WATER HEATERS AND VENTS, GAS PIPING AND HYDRONIC PIPING (SPOKE ON SITE WITH NATE )---- ABOVE CEILING DUCT ABOVE PRE-ROCK - DRYER AND BATH EXHAUST COMPLETE PER PLAN FOR 1ST, 2ND & 3RD FLOORS. | MARKB | MARKB | | HD | P | 6151522 |
R & R HEATING & AIR CONDITIONING, INC. | HRP | P | 03/29/2019 | No call ahead and could not locate contractor on site. 1ST FLOOR ONLY: LINESETS OK FOR INSULATION, NAIL PROTECTION AND SUPPORT. Still need pressure test. | MARKB | MARKB | | HRP | P | 6149271 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 03/29/2019 | No call ahead and could not locate contractor on site. 1ST FLOOR ONLY: ABOVE CEILING DUCT ABOVE PRE-ROCK - Unit 108 is missing a dryer box and how will kitchen exhaust fans be protected through plate. Rest of duct per plan. | MARKB | MARKB | | HD | P | 6149265 |
BEFORT CONSTRUCTION | P= | C | 01/10/2020 | see images | TED | TED | | P= | C | 6448731 |
BEFORT CONSTRUCTION | P= | P | 01/07/2020 | need trap guards install and backflow drain installed, can down load images | TED | TED | | P= | P | 6445197 |
BEFORT CONSTRUCTION | P= | P | 12/11/2019 | Need isolation valve and access both hose bibs, unit 107 water heater needs shimmed, unit 107 kitchen sink ( kitchen sink at 34-3/8") - toilet over 18" off side wall (at 18-1/2") - hand held sprayer at tub need non-positive shut off and slide bar in reach range, water entry need to run backflow drain and floor drain needs trap guard, units 205-206-207-208. | DANR | DANR | | P= | P | 6424347 |
BEFORT CONSTRUCTION | P= | P | 12/09/2019 | Units 103-104-305-306-307-308 ok. | DANR | DANR | | P= | P | 6420858 |
BEFORT CONSTRUCTION | P= | P | 12/06/2019 | Units 201-202-203-204-301-303 ok. | DANR | DANR | | P= | P | 6419649 |
BEFORT CONSTRUCTION | P= | P | 12/04/2019 | Inspection the following units: 203 need air gap t&p and run water heater pan to drain. 301- 302 (loose mster shower head)303- all units need t&p air gap and run water heater pan drain to floor drain. 304 - ok. | DANR | DANR | | P= | P | 6416282 |
BEFORT CONSTRUCTION | P= | P | 11/15/2019 | 305, 306, 308, less dishwashers | TED | TED | | P= | P | 6400716 |
BEFORT CONSTRUCTION | PTO | C | 07/05/2019 | 1st floor tub waste and over flow test ok | TED | TED | | PTO | C | 6253975 |
BEFORT CONSTRUCTION | PTO | P | 07/03/2019 | dwv 103, 201, 203, 301, 303, 104, 202, 204, 302, 304 ok, still need 1st floor tub waster and over flow tests | TED | TED | | PTO | P | 6252772 |
BEFORT CONSTRUCTION | PTO | P | 07/02/2019 | dwv lost test above 1st floor 104, 103 tower bathroom groups, water complete in units 104, 202, 204, 302, 304, 103, 201, 203, 301, 303 | TED | TED | | PTO | P | 6251440 |
BEFORT CONSTRUCTION | PTO | P | 06/28/2019 | main water line piping through building and to units ok | TED | TED | | PTO | P | 6248191 |
BEFORT CONSTRUCTION | PTO | P | 06/24/2019 | dwv and water in units 107, 205, 207, 305, 307, 108, 206, 208, 305, 308 ok, still need to test 1st floor tub waste and overflows, still need building water main test | TED | TED | | PTO | P | 6241316 |
BEFORT CONSTRUCTION | PTO | P | 06/11/2019 | leak on dwv in 107 ceiling above tub, dwv in 205, 305, 307 ok | TED | TED | | PTO | P | 6227271 |
BEFORT CONSTRUCTION | PTO | R | 06/07/2019 | contractor called and canceled | TED | TED | | PTO | R | 6223691 |
BEFORT CONSTRUCTION | PTO | R | 06/05/2019 | contractor called and canceled | TED | TED | | PTO | R | 6220870 |
BEFORT CONSTRUCTION | PTO | P | 06/04/2019 | back graded drains through out, lav drains not run to code still | TED | TED | | PTO | P | 6219593 |
BEFORT CONSTRUCTION | PTO | P | 05/31/2019 | dwv--leak in garage ceiling and flat line from unit 205, correct lav drains in wall of 107, need floor drains ant tubs installed 205, 207, 305, 307 | TED | TED | | PTO | P | 6216252 |
BEFORT CONSTRUCTION | PTO | R | 05/30/2019 | field cancel | TED | TED | | PTO | R | 6214450 |
BEFORT CONSTRUCTION | PTO | R | 05/29/2019 | field cancel | TED | TED | | PTO | R | 6212975 |
BEFORT CONSTRUCTION | PTO | R | 05/28/2019 | field cancel | TED | TED | | PTO | R | 6211547 |
BEFORT CONSTRUCTION | PTO | R | 05/24/2019 | field cancel | TED | TED | | PTO | R | 6210027 |
BEFORT CONSTRUCTION | PTO | R | 05/23/2019 | field cancel | TED | TED | | PTO | R | 6208409 |
BEFORT CONSTRUCTION | PTO | R | 05/22/2019 | field cancel | TED | TED | | PTO | R | 6207143 |
BEFORT CONSTRUCTION | PTO | R | 05/20/2019 | field cancel | TED | TED | | PTO | R | 6204392 |
BEFORT CONSTRUCTION | PTO | P | 05/17/2019 | water piping in walls and ceiling for units 103, 201, 203, 301, 303 ok | TED | TED | | PTO | P | 6202605 |
BEFORT CONSTRUCTION | PTO | R | 05/16/2019 | field cancel | TED | TED | | PTO | R | 6201117 |
BEFORT CONSTRUCTION | PTO | R | 05/15/2019 | field cancel | TED | TED | | PTO | R | 6199664 |
BEFORT CONSTRUCTION | PTO | R | 05/14/2019 | field cancelled | JOEL | JOEL | | PTO | R | 6199001 |
BEFORT CONSTRUCTION | PTO | P | 05/13/2019 | dwv leak on mission band 206, units, 108, 208,306, 308 test and design ok still need floor drains tested, need tubs installed and tested, water piping for units in walls and ceiling 104, 202, 204, 302, 304 ok | TED | TED | | PTO | P | 6196656 |
BEFORT CONSTRUCTION | PTO | P | 05/10/2019 | dwv units 108, 206, 208, 306, 308, leaks on piping through out, lav drains crossed wet venting floor to floor, need mech. room floor drains completed and tested, reinspect all | TED | TED | | PTO | P | 6194914 |
BEFORT CONSTRUCTION | PTO | P | 05/09/2019 | field cancel | TED | TED | | PTO | P | 6193611 |
BEFORT CONSTRUCTION | PTO | P | 05/08/2019 | water piping in walls and ceiling of units 107, 205, 207, 305, 307 ok | TED | TED | | PTO | P | 6192269 |
BEFORT CONSTRUCTION | PTO | P | 05/03/2019 | unit water piping in walls and ceiling units 108, 206, 208, 306, 308 test and design ok | TED | TED | | PTO | P | 6186647 |
BEFORT CONSTRUCTION | PB | C | 09/13/2018 | Ok, completes base. | DANR | DANR | | PB | C | 5964749 |
BEFORT CONSTRUCTION | PB | P | 08/27/2018 | trunk line and risers o.k, | JOEL | JOEL | | PB | P | 5947052 |
BLUE FLAME GAS COMPANY, INC. | XMS | P | 01/09/2020 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: rerouted gas lines | TCRIPPEN | TCRIPPEN | | XMS | P | 6447926 |
DILLER ELECTRIC LLC | XES | T | 12/11/2019 | PAID (REC#1649719) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised plan to indicate fault current at unit panels. | BERTHA | BERTHA | | XES | T | 6423610 |
BLUE FLAME GAS COMPANY, INC. | XMS | T | 10/23/2019 | PAID (REC#1639628) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice showing gas meters and gas lines relocated | TCRIPPEN | TCRIPPEN | | XMS | T | 6378176 |
DILLER ELECTRIC LLC | XES | T | 10/23/2019 | PAID (REC#1639511) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised feeder for House Panel. | BERTHA | BERTHA | | XES | T | 6377522 |