H.W. HOUSTON CONSTRUCTION LLC | B= | C | 03/17/2020 | Z= complete | DAKOTAB | DAKOTAB | | B= | C | 6513405 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 01/10/2020 | Temp CO: Temp CO: Extend Pending Zoning ( Expires: 2/9/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6449533 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 12/18/2019 | pending other final inspections | BRIANB | BRIANB | | B= | P | 6431097 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 11/27/2019 | Temp CO: Ok to extend per BW ( Expires: 12/27/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6411272 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 11/01/2019 | Temp CO: pending finals ( Expires: 12/1/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6385433 |
H.W. HOUSTON CONSTRUCTION LLC | B= | P | 10/31/2019 | FINAL RE-INSPECTION -- BOTH TOWERS AND EXTERIOR -- Need landing outside of tele-com and fire riser room doors -- All other items from previous inspection corrected -- pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), R & R HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, SOLUTIONS MECHANICAL LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6385135 |
H.W. HOUSTON CONSTRUCTION LLC | BFN | P | 10/31/2019 | Engineer observation for stiffened slab on file / Eufer noted | DAKOTAB | DAKOTAB | | BFN | P | 6385134 |
H.W. HOUSTON CONSTRUCTION LLC | BFT | P | 10/31/2019 | Engineer letter for footing received -- Open hole received -- 2200 PSF - No drain required | DAKOTAB | DAKOTAB | | BFT | P | 6385133 |
H.W. HOUSTON CONSTRUCTION LLC | B= | R | 10/30/2019 | FINAL INSPECTION -- WEST TOWER -- Need all 3rd party observations -- 302 - Front door not self latching -- 304 - Front door not self latching -- 303 - Need to fix insulation in attic -- Fix penetration at sprinkler line on 2nd floor corridor - -103 - Need Smoke and CO detector at bedroom hallways -- Garage G - Need to install clean out cover -- All garages - Need to firestop garage door bracket penetrations -- Missing handrail on opposite side of all stairways -- Pending other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), R & R HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, SOLUTIONS MECHANICAL LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6383901 |
H.W. HOUSTON CONSTRUCTION LLC | B= | R | 10/30/2019 | FINAL RE-INSPECTION -- EAST TOWER -- Still need all 3rd party observations -- Still missing handrails on opposite side of stairs -- Other items corrected. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), R & R HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, SOLUTIONS MECHANICAL LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6383844 |
H.W. HOUSTON CONSTRUCTION LLC | B= | R | 10/25/2019 | FINAL INSPECTION -- EAST TOWER -- Still need open hole observation -- 306 - Need to access attic to check insulation -- 208 - Need to fix firecaulking at PVC vent in mech. room -- 108 - Sink height at accessible restroom not at 34" to lip of sink -- Need to fix penetrations at light in mech. room -- Garage J - Need to fix hold above opener controls -- Missing handrail on wall side of all sets of stairs -- Need to complete other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), R & R HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, SOLUTIONS MECHANICAL LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6380680 |
H.W. HOUSTON CONSTRUCTION LLC | BFN | P | 10/25/2019 | Still need open hole observation -- Engineer observation for stiffened slab on file | DAKOTAB | DAKOTAB | | BFN | P | 6380679 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 10/14/2019 | Discussed final inspections policy and procedures including life safety items, other final inspections required, and differences between TCO's and CO's | DAKOTAB | DAKOTAB | | BSP | P | 6367098 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 09/04/2019 | Penetrations -- gas line penetrations at west garage sealed | SCOTTS | SCOTTS | | BSP | P | 6323348 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 08/16/2019 | wrong inspection requested | SCOTTS | SCOTTS | | BSP | R | 6303463 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 07/22/2019 | WEST TOWER ENCLOSURE LATH -- corrections completed from previous inspection | SCOTTS | SCOTTS | | BLA | P | 6271501 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 07/16/2019 | LATH EAST TOWER -- exit enclosure lath/seal over penetrated staples throughout all 3 floors | SCOTTS | SCOTTS | | BSP | R | 6264490 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/09/2019 | ABOVE HARD LID PENETRATIONS -- 1st and 2nd floor penetrations sealed above hard lid framing at ceilings and bearing walls | SCOTTS | SCOTTS | | BSP | P | 6256995 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 07/08/2019 | 1st and 2nd FLOOR ABOVE HARD LID PENETRATIONS -- cancelled by site Rep Mike | SCOTTS | SCOTTS | | BSP | L | 6255661 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/03/2019 | EXIT ENCLOSURE WEST TOWER LATH -- lath on all 3 floors of west exit enclosure complete | SCOTTS | SCOTTS | | BSP | P | 6252601 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 07/03/2019 | 3rd FLOOR PENETRATIONS -- above hard lid penetrations all of 3rd floor complete | SCOTTS | SCOTTS | | BSP | P | 6252600 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 07/02/2019 | 3RD FLOOR ABOVE HARD LID PENETRATION INSPECTION -- inspection stopped by site rep Mike/too many items | SCOTTS | SCOTTS | | BSP | L | 6251207 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 06/28/2019 | LATH -- West tower exit enclosure lath incomplete/missing staples throughout all 3 floors | SCOTTS | SCOTTS | | BLA | P | 6247585 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 06/11/2019 | field cancelled by site rep Mike/wrong permit called in | SCOTTS | SCOTTS | | BSP | L | 6226856 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/30/2019 | GYPSUM FASTENING 1ST FLOOR GARAGES -- observed gypsum fastening per UL listings U356/L528/U305/U344/U341 on 1st floor garage walls and lid -- 2 garages in front of unit 103 missing screws both sides of wall -- missing screws on butt joint garage lid garage in front of unit 104 | SCOTTS | SCOTTS | | BSP | P | 6214596 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 05/28/2019 | GYPSUM FASTENING INSPECTION -- first floor garages/cancelled by site rep Mike/not ready | SCOTTS | SCOTTS | | BSP | L | 6211576 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/24/2019 | discussed with site rep Mike still need to inspect drywall attachment for garages at bearing/exterior walls and lids | SCOTTS | SCOTTS | | BSP | P | 6210173 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/24/2019 | RC removed has now been replaced and lapped per specifications 1st and 2nd floor | SCOTTS | SCOTTS | | BSP | P | 6210142 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 05/24/2019 | insulation removed on 1st and 2nd floor now corrected | SCOTTS | SCOTTS | | BIN | P | 6210130 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/23/2019 | met on site with site representatives Nate and Mike/while on site site reps conducted conference call with architect Doug Fullen concerning membrane penetrations at concealed space of exit enclosure fire barriers with floor joists/architect is providing letter for protection of these penetrations | SCOTTS | SCOTTS | | BSP | P | 6208642 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 05/21/2019 | field cancelled by site rep Mike/ still need EJ updated for truss penetrations in concealed space at fire barrier for exit enclosure | SCOTTS | SCOTTS | | BSP | L | 6205799 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/17/2019 | RC inspection for missing sections throughout building completed --- top of exit enclosures still does not have splice for protecting vertical plane of flat girder truss -- observed gypsum at decks and deck lids per GA FC5512/gypsum fastening and 2 layers installed per lsiting | SCOTTS | SCOTTS | | BSP | P | 6202747 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 05/15/2019 | Drywall Screw inspection first floor units only/2nd floor cancelled by site rep Mike -- EJ provide for truss penetrations in concealed spaces of exit enclosure fire barrier is listed for smoke only/provided update EJ -- provide stamped RFI for 2nd floor 2G1 walls at exit enclosure interior side for screws vs nails on plans and listing -- missing 1st floor unit sections of lid -- unit 107 screw pattern on rear wall per UL U356 not per listing @ 7" oc -- missing screws at 1/2" of side joints in closets per L528 listing -- missing drywall on corridor wall unit 108 -- walls inspected include listings of UL U305/U341/U356 still need to see electrical penetrations in 203 sealed -- areas of RC and insulation have been removed throughout 1st floor units and garages/recall once corrected for inspection | SCOTTS | SCOTTS | | BSP | P | 6200079 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 05/13/2019 | screw inspection 1st and 2nd floor/field cancelled by site rep Mike | SCOTTS | SCOTTS | | BSP | R | 6196903 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 05/10/2019 | gyp fastening inspection cancelled onsite by site rep Mike / no inspection performed | BRIANB | BRIANB | | BSP | L | 6195638 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 05/09/2019 | GYP INSPECTION - FLR/CEILING CONCEALED SPACE AT EXIT ENCL FIRE BARRIER WALLS / 1) need firestop details for all floor-ceiling truss membrane penetrations - penetrations are fire taped and fire caulk applied at time of inspection / 2) Unit 103 - 107 - 207 - missing gyp at concealed floor - ceiling space above bedroom closet 3) Unit 108 - missing gyp at floor - ceiling space above entry closet 4) Unit 205 - missing gyp at floor - ceiling space above kitchen wall at entry GYP FASTENING - UNITS 1st and 2nd floor / inspection stopped - too many items to list / USG type ULIX gyp installed at floor - ceiling assembly L528 is not included in assembly / reviewed UL L528 floor ceiling assembly with the site rep Mike - need complete re-inspection | BRIANB | BRIANB | | BSP | R | 6194279 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 05/08/2019 | GYP INSPECTION - FLR/CEILING CONCEALED SPACE AT EXIT ENCL FIRE BARRIER WALLS / 1) need firestop details for all floor-ceiling truss membrane penetrations - penetrations are fire taped at time of inspection 2) 1st floor truss over garage adjacent to stair wall missing fire stop 3) missing gyp between over head garage door bracket backing 4) UNIT 104 - missing gyp at floor ceiling concealed space above entry closet 5) UNIT 201 - not ready 6) UNIT 203 - not ready / inspection stopped - not ready - need complete re-inspection | BRIANB | BRIANB | | BSP | R | 6192717 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/22/2019 | 1st floor interior shear wall inspection per S4/S6 shear walls/ missing shear wall in unit 103 at bedroom/ rest of shear walls per plan -- 3rd floor gyp fastening for walls and lid per listings P545/U305/U356/U341/U344/gyp fastening per listings -- observed drywall fastening in progress on 2nd floor/ exterior walls at exit enclosure sides are not through concealed space to continue fire barrier to top/ per 2009 IBC 707.5 Continuity/fire barrier shall extend through concealed spaces/also per detail 15 on A23 -- discussed girder truss above exit enclosure with site rep Mike/need detail showing how to protect vertical side of girder truss in between horizontal assemblies at different elevations within the exit enclosure | SCOTTS | SCOTTS | | BSP | P | 6173637 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/16/2019 | spoke with site rep Mike via phone concerning detail 15 on A23/gypsum to be installed for continuity of fire barrier at concealed floor space -- in addition spoke to Mike concerning detail 3 on A23 on exterior walls at concealed space per architectural stamped design | SCOTTS | SCOTTS | | BSP | P | 6167909 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 04/16/2019 | 1st floor frame corrections now complete | SCOTTS | SCOTTS | | BFR | P | 6167374 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/15/2019 | updated L528 listing on file/RC installed per listing for lids on 1st and 2nd floor -- fire barrier at interior walls of stairway enclosure to be continuous through ceiling line -- training with Brian B on 2009 707.5 fire barrier continuity/ revised L528 listing | SCOTTS | SCOTTS | | BSP | P | 6165917 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/15/2019 | Training with PPRBD inspector Scott / VA construction / went over horizontal floor - ceiling assemblies and fire barrier assembly (U305) at stair enclosures / went over details for UL U305 assembly and discussed fire barrier continuity per IBC 707.5 | BRIANB | BRIANB | | BSP | P | 6165913 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 04/15/2019 | 1st and 2nd floor exterior thermal installed per Comcheck | SCOTTS | SCOTTS | | BIN | P | 6165912 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 04/15/2019 | 1st floor frame inspection -- missing uplift connectors at girder trusses in garage -- stud packs per letter spliced incomplete with gypsum on all 4 sides in garages -- reviewed U344 and U305 listings with site rep mike for garage bearing walls and shear walls | SCOTTS | SCOTTS | | BFR | P | 6165906 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 04/12/2019 | partial inspection for gypsum fastening on 2nd floor lid/field cancelled by site rep Mike/updated listing not provided | SCOTTS | SCOTTS | | BSP | L | 6163625 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 04/10/2019 | partial exterior thermal inspection -- unit 203 penetrations still not addressed -- missing uplift connections on girder trusses throughout floor -- exterior thermal ok | SCOTTS | SCOTTS | | BIN | P | 6161535 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 04/10/2019 | partial inspection for RC and insulation on 2nd floor lid per L528/per L528 listing provided on plans/ item 7A/ RC must be installed per 3F or 4B @ 12" oc/currently @ 16" oc with 7-7.5" thickness of glass fiber insulation -- correct RC spacing or provided updated listing | SCOTTS | SCOTTS | | BSP | R | 6161533 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | L | 04/09/2019 | field cancelled by site rep Mike/not ready | SCOTTS | SCOTTS | | BIN | L | 6159904 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | L | 04/09/2019 | field cancelled by site rep Mike/not ready | SCOTTS | SCOTTS | | BSP | L | 6159897 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 04/08/2019 | 3rd floor RC per listing P545 now complete in water closets | SCOTTS | SCOTTS | | BFR | P | 6158886 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 04/08/2019 | strap top plates and studs where plate breaks occur under 48" and penetrating items for over bored penetrations -- strap studs at over bored locations -- provide uplift connections on all girder trusses in garage and units -- missing 3rd king stud ee of several windows per call out on structural //update// partial frame 1st floor | SCOTTS | SCOTTS | | BFR | P | 6158878 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/05/2019 | partial inspection for penetrations on 1st and 2nd floor -- 1st floor units and garages ok/ 2nd floor room 203 electric main lines need resealed on exterior wall/ penetrations in other units ok -- reviewed 3rd floor lid assembly spliced in/UL P545/ reviewed wall listings UL U356/ reviewed 1st and 2nd floor lids per UL L528 with site rep Mike | SCOTTS | SCOTTS | | BSP | P | 6156546 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 04/02/2019 | Training with PPRBD inspector Scott / met and greet with site superintendent / truss inspection and fire stop inspection for penetrations / went through building with site superintendent and PPRBD inspector Scott - discussed inspection history and rated assemblies for building / also went through clubhouse and discussed rated assemblies - inspection history | BRIANB | BRIANB | | BSP | P | 6152294 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 04/02/2019 | inspection stopped by site rep Mike/missing sealing of penetrations/puddy packs/listed boxes throughout -- training with Brian B | SCOTTS | SCOTTS | | BSP | R | 6152277 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/29/2019 | met with site reps mike and nate to discuss proposed design change for roof ceiling assemblies from a P522 to P545 / need to splice in design change and have approved | LONNYS | LONNYS | | BSP | P | 6149071 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/27/2019 | Courtesy visit and Training with PPRBD inspectors Lonny and Scott / went through blding 1 and went over inspection history with Scott - Lonny and site rep Nate / discussed fire rated assemblies for building and also discussed accessible elements / went over job site binder for rated assemblies and RFIs for project / also walked through clubhouse with PPRBD inspector Scott - discussed inspection history and rated assemblies for clubhouse / note - observed 5/8" American gyp in process of being installed at rated horizontal assemblies (UL P522) in building 1 and clubhouse - this listing does not include American Gyp - went over details of UL P522 with site rep Mike | BRIANB | BRIANB | | BSP | P | 6146920 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/27/2019 | training and meet and greet with inspectors Brian B and Scott S / reviewed site progress with both inspectors - meet and greet with site rep mike - discussed rated assemblies including exterior walls, interior walls, exit enclosures, and horizontal assemblies | LONNYS | LONNYS | | BSP | P | 6146918 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/27/2019 | site visit with Inspectors Brian B and Lonny S -- walked jobsite/met site rep Mike/ discussed location of plans/RFI binder/Listings -- walked building 1 to review inspection history/rated assemblies/listings -- walked Clubhouse and reviewed listings/assemblies/ inspection history | SCOTTS | SCOTTS | | BSP | P | 6146917 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/27/2019 | 3RD FLOOR R/C - 2ND AND 3RD FLOOR UNIT PENETRATIONS FOR NEW PLUMBING / all third floor deck closets missing R/C / all 3rd floor units R/C OK / unit 207 observed sprinkler line through top cord of F201 above laundry wall / still need to inspect all 2nd floor deck closet penetrations // discussed UL P522 roof ceiling assembly with site rep mike - USG ULIX gyp is proprietary to system being used - observed american type C in units | LONNYS | LONNYS | | BSP | P | 6146916 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/25/2019 | 2ND FLOOR FRAME REINSPECTION AND TRUSSES - 1ST FLOOR FRAME INSPECTION AND TRUSSES EAST TOWER : still need to inspect all 1st and 2nd floor penetrations once plumbing changes are complete / 201 - electric bundle unprotected at pre rock for electric panel - observed 1-1/2 in hole drilled through top plate of F135T above MBR closet //// missing all draft stop 1st floor / 1st floor east 4 bay garages - missing lateral every 10' over doorway to exit enclosure / 1st floor east 3 bay garages - missing anchor bolt at plate break middle garage - nailing incomplete at floor truss hangers to girder middle garage / | LONNYS | LONNYS | | BFR | P | 6143916 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/22/2019 | training with inspector Brian B. walked frame reinspection in clubhouse for penetrations at interior rated assemblies / discussed listings for various types of membrane and through penetrations | LONNYS | LONNYS | | BSP | P | 6142528 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/22/2019 | 2ND FLOOR FRAME INSPECTION: could not gain access to second floor - exit enclosure floors poured and wet / observed exposed gable end in stair enclosure and discussed detail needed for protection of structural components for VA construction with site rep Nate | LONNYS | LONNYS | | BFR | P | 6141828 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 03/21/2019 | 2ND FLOOR FLOOR TRUSSES ONLY: inspection stopped / missing truss calcs for all F200 type trusses on site / discussed reinspection for new plumbing penetrations after frame inspection with site reps mike and nate | LONNYS | LONNYS | | BSP | R | 6140389 |
H.W. HOUSTON CONSTRUCTION LLC | BIN | P | 03/20/2019 | 3RD FLOOR INSULATION RC INSPECTION ALL UNITS: need to complete all foundation inspections / insulation and RC OK in all 3rd floor units / observed RC at 12" OC for P522 roof/ceiling assembly / observed R21 at all exterior U356 walls / observed R19 at all U341 demising walls | LONNYS | LONNYS | | BIN | P | 6139016 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/20/2019 | 3RD FLOOR UNITS AND 3RD FLOOR EXIT ENCLOSURE FRAME REINSPECTION ONLY: unit 303 missing CS18x24” at exterior end girder EE / all other 3rd floor units and exit enclosure framing OK pending all other roughs | LONNYS | LONNYS | | BFR | P | 6139015 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | C | 03/20/2019 | entire building lath OK | LONNYS | LONNYS | | BLA | C | 6139014 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 03/19/2019 | REINSTECTION FOR 2ND AND 3RD FLOOR TUB AND PLUMBING PENETRATIONS: inspection stopped for too many items - observed new plumbing pex and PVC penetrations after previous inspection in all 2nd and 3rd floor horizontal floor-ceiling assemblies / will need to reinspect all framing and penetrations at new plumbing locations | LONNYS | LONNYS | | BSP | R | 6137558 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/18/2019 | 1ST FLOOR FRAMEING AND EXIT ENCLOSURE LANDING AND WALKWAY FRAMING: 1st floor frame not ready - field cancelled by site rep mike / all floor framing at landings missing bracing between joists per UL L516 item 3 / first floor hangers covered by gyp - could not verify nailing at LVL connections both towers / fire caulk incomplete at penetrations between joists in UL U305 fire barrier / missing double ledger at rim landings where joists run parallel with direction of travel / still need to inspect RC | LONNYS | LONNYS | | BFR | P | 6136151 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/15/2019 | 2ND AND 3RD FLOOR FRAMING CORRECTIONS AND INSULATION BEHIND PREROCK ONLY: need to splice in truss layout and hanger schedule reviewed on site - still need to inspect all trusses / still need clarification for 3rd floor interior 1 hour walls for type 5A construction on approved design - 1-hour walls missing fire protection at membrane penetrations / still need to re inspect insulation corrections behind pre rock at tubs and tub drain penetrations / all other 2nd and 3rd floor corrections OK pending other roughs / need to complete bft bfn and bfi / | LONNYS | LONNYS | | BFR | P | 6134311 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/15/2019 | Training with PPRBD inspector Lonny / frame inspection training - went through approved structural design and stamped truss design and walked building / discussed stamped truss design and hardware connections for floor trusses and roof trusses / discussed VA construction and 1hr ratings for interior load bearing walls / also met with site reps Nate and Mike and discussed needing plan splice approved for removing any fire rating at 3rd floor interior rated walls inside units as shown on design - see inspection comments from BFR dated 5MAR19 | BRIANB | BRIANB | | BSP | P | 6134190 |
H.W. HOUSTON CONSTRUCTION LLC | BFI | P | 03/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letters from Entech and EV studious for foundation inspections to follow | LONNYS | LONNYS | | BFI | P | 6131066 |
H.W. HOUSTON CONSTRUCTION LLC | BFN | P | 03/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letters from Entech and EV studious for foundation inspections to follow | LONNYS | LONNYS | | BFN | P | 6131065 |
H.W. HOUSTON CONSTRUCTION LLC | BFT | P | 03/12/2019 | AUTHORIZED INSPECTION BY ENGINEER / observation letters from Entech and EV studious for foundation inspections to follow | LONNYS | LONNYS | | BFT | P | 6131063 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 03/11/2019 | EAST and WEST ends ONLY / lath OK | LONNYS | LONNYS | | BLA | P | 6130887 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/11/2019 | 3RD AND 2ND FLOOR WALL FRAMING, PENETRATIONS,. AND PRE ROCK / INSULATION ONLY - STILL NEED TO INSPECT ALL TRUSSES AND DECK CLOSET FRAMING FLOOR 2 AND 3 // in all 2nd floor units - observed 3 ply (2x12) beam with 4 stacked 2x6s on top with USP MSH422 hangers in lieu of typical header per approved plan / all 2nd floor units - exhaust fan penetration in kitchen 1hr interior load bearing wall / provide fire protection detail for all tub drains 2nd floor / unit 207 missing 3rd post under header at kitchen to laundry room / unit 205 missing fire caulk at PVC pipe through penetration at top plate / unit 201 not ready needs complete reinspection / insulation in concealed space of exterior wall U356 behind tubs in units 301 and 201 OK / inspection pending other roughs / discussed with site rep Mike - providing engineer approval for USP hardware being used in lieu of simpson - gyp shear fastening | LONNYS | LONNYS | | BFR | P | 6130878 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/08/2019 | Training with PPRBD inspector Lonny / pre-rock inspection training / went over gyp continuity requirements for rated wall assemblies and went over through - membrane penetrations including annular at penetrations | BRIANB | BRIANB | | BSP | P | 6127827 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 03/08/2019 | PRE ROCK INSPECTION ALL UNIT: pre rock incomplete at tubs in units 307,308,306,206,201,202,104,108,107 - pvc drain in the way of gyp and missing tape (no gyp behind PVC) / inspection stopped all units need complete reinspection / had conversation with site rep about having request completed upon arrival - discussed fire protection at added through penetrations that do not have anything running through them | LONNYS | LONNYS | | BSP | R | 6127810 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/07/2019 | Training with PPRBD inspector Lonny / frame inspection training and trusses / went over the approved structural design and the stamped truss design / discussed requirements for truss design and missing mechanical connection details on approved truss design / walked inspection with site reps Nate and Mike / also reviewed gyp fastening per approved listing for exits | BRIANB | BRIANB | | BSP | P | 6127427 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | R | 03/07/2019 | 3RD FLOOR TRUSS INSPECTION AND 3RD FLOOR FRAMING REINSPECTION / approved structural roof design requires simpson hardware per roof framing notes sheet S5 of 9 -- USP hardware has been installed and missing truss connection details on approved truss design / inspection stopped still need to inspect all trusses / talked to site rep about roof ceiling assembly over deck closets / still need to reinspect 3rd floor framing corrections from inspection dated 3-5-19 / training with inspector Brain B - reviewed frame inspections - reviewed truss design vs, structural design and inspection procedures | LONNYS | LONNYS | | BFR | R | 6127411 |
H.W. HOUSTON CONSTRUCTION LLC | BFR | P | 03/05/2019 | 3RD FLOOR FRAME INSPECTION - STILL NEED TO INSPECT TRUSSES: still need to complete pre rock at tubs units 303, 306, and 308 / still need to complete fire protection at PVC pipes in false walls at tubs units 306 and 307 / missing H2.5s at mid bearing points at deck closet walls all units / need clarification for 3rd floor non load bearing walls being protected per approved detail / discussed protecting columns at interior walls for girder in unit 307 EE per 2009 IBC table 601 VA construction / need clarification for roof ceiling assembly at deck closet lids GA RC-2601 / training with inspector Brian B - discussed VA construction types of construction 2009 IBC table 601 | LONNYS | LONNYS | | BFR | P | 6125065 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/05/2019 | Training with PPRBD inspector Lonny / frame inspection training R2 / S2 occupancy / discussed types of construction per table 601 - primary structural frame and discussed definitions 202 - primary structural frame | BRIANB | BRIANB | | BSP | P | 6125053 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/04/2019 | 3RD FLOOR R/C, PRE ROCK , AND PENETRATIONS ONLY / 3" PVC pipes missing fire caulk at lid behind tub drains unit 306 and 307 / missing pre rock at fire partition U-341 behind false walls and tubs in units 306 and 308 / R/C at lids OK at all units per UL - P522 / 2 batts of 3-1/2" R11 insulation observed behind pre rock at tubs where U-341 allows 3-1/2" max. insulation item #5 / discussed with site rep Mike getting RFI for interior non load bearing walls on 3rd floor being rated on approved plans - discussed requesting frame inspection prior to pre rock, penetrations and R/C /// training with inspector Brian B. reviewed plans - reviewed rated assemblies U305 U341 and P522 - discussed inspection processes and inspection recording | LONNYS | LONNYS | | BSP | P | 6123927 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/04/2019 | Training with PPRBD inspector Lonny / VA construction / went over details for both U341 and U305 rated wall assemblies - fire partitions and interior rated walls for VA construction / went over rated vs unrated ice maker box in fire partition wall / discussed inspection processes and scheduling for pre-rock areas, including penetrations for assemblies, frame, rc and insulation inspections / discussed process for any RFI(s) for clarification and having binder for RFIs and plan splice(s) for any design changes | BRIANB | BRIANB | | BSP | P | 6123928 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 03/01/2019 | walked site with site rep mike / discussed pre rock, penetrations in fire resistant rated walls and RC for rated roof ceiling assemblies | LONNYS | LONNYS | | BSP | P | 6122157 |
H.W. HOUSTON CONSTRUCTION LLC | BLA | P | 03/01/2019 | NORTH SIDE ONLY lath OK | LONNYS | LONNYS | | BLA | P | 6122117 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 02/27/2019 | met with site rep nate and discussed staggered studs in U341 walls / discussed homasote at tub drains / discussed inspection requirements and interior load bearing wall assemblies | LONNYS | LONNYS | | BSP | P | 6119575 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 02/26/2019 | EXIT ENCLOSURE GYP AND FASTENING ONLY: need listings for through and membrane penetrations at U305 exit enclosure walls both towers / fire barrier continuity requirements not met at landings and walkway ledgers both towers / east tower 2nd and 3rd floor have extra penetrations - gyp has 1" gap to ledger 2nd floor north wall / west exit enclosure gyp and fastening OK pending continuity requirements and penetration protection | LONNYS | LONNYS | | BSP | P | 6117219 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 02/06/2019 | EAST TOWER EXIT ENCLOSURE RC ONLY: RC OK | LONNYS | LONNYS | | BSP | P | 6099005 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 02/05/2019 | BUILDING 1 EXIT ENCLOSURE RC INSPECTION: EAST TOWER -- RC installed upside down and fastening incomplete in several areas 1st and 2nd level - 3rd level OK / WEST TOWER: RC ok at all levels - items corrected on site | LONNYS | LONNYS | | BSP | P | 6098627 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 02/01/2019 | Training with PPRBD inspector Lonny / R2 - S2 occupancy / VA construction / also met with site rep Nate / discussed inspection scheduling - rated assemblies for structure - firestop penetration details - pre-rock and and frame inspection / RC inspection requested and not ready for inspection | BRIANB | BRIANB | | BSP | P | 6095733 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | R | 02/01/2019 | RC not ready in exit enclosures for building 1 both towers / walked building 1 with site rep Nathan - discussed inspection process - pre rock - rated assemblies / training with inspector Brian B | LONNYS | LONNYS | | BSP | R | 6095736 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 01/16/2019 | courtesy visit and training with inspector Brian B. and Scott S / met with site super Nate to discuss rated assemblies / training on IBC 2009 1018.1 corridor construction / 708.12 enclosures at top of shafts / 709 fire partitions / exit enclosures 707.3.2 | LONNYS | LONNYS | | BSP | P | 6080672 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 01/16/2019 | Training with PPRBD inspector Lonny and Scott / VA Construction / R2 occupancy / reviewed 1018.1 corridors and fire partitions including elements of the approved UL listing / discussed VA construction including interior bearing walls / discussed 708.12 enclosure at top of shafts - horizontal assemblies and fire barriers / met with the site superintendent and discussed inspection scheduling for the building and approved rated wall assemblies on the design | BRIANB | BRIANB | | BSP | P | 6080585 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 01/16/2019 | training with Brian B -- reviewed 5A construction/R2/S2 occupancies -- reviewed 1018.1 corridors/1022 exit enclosures/708.12 enclosure at top for shafts | SCOTTS | SCOTTS | | BSP | P | 6080557 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 01/09/2019 | Training with PPRBD inspector Lonny / VA Construction / R2 occupancy / reviewed fire partition continuity 709.4 and fire barrier continuity 707.5 / discussed VA construction including interior bearing walls / went over draft-stopping in floors per 717.3 / discussed UL assemblies U305 and U341 per the approved design | BRIANB | BRIANB | | BSP | P | 6073888 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 01/09/2019 | site visit and training with inspector Brian B . / reviewed fire partition and fire barrier locations and requirements / 5A construction requirements interior structural walls and exterior walls / reviewed UL listings U305 and U341 / IBC 717.3 draft stopping in floors / pre rock at tubs and structural walls | LONNYS | LONNYS | | BSP | P | 6073867 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 12/18/2018 | BUILDING 2 NE EXIT ENCLOSURE EXTERIOR SHEAR FASTENING ONLY -- shear fastening OK | LONNYS | LONNYS | | BSP | P | 6056727 |
H.W. HOUSTON CONSTRUCTION LLC | BSP | P | 12/04/2018 | BUILDING 1 AND 2 EXTERIOR SHEAR WALL SHEATHING INSPECTION ONLY: BUILDING 2-- east exit enclosure OSB shear incomplete at floor 2 and 3 - all other exterior shear sheathing fastening OK / BUILDING 1 -- all exterior shear fastening OK - engineer letter to follow for exit enclosure gyp shear for levels 2 and 3 both buildings | LONNYS | LONNYS | | BSP | P | 6042900 |
DILLER ELECTRIC LLC | E= | C | 10/11/2019 | Electric for building 1 complete | CHIPO | CHIPO | | E= | C | 6366208 |
DILLER ELECTRIC LLC | E= | P | 10/10/2019 | A/C units each need a strap under disconnect----units 201, 301, 103, 203, 303, 106, 206, 306, 207, 307, 108, 208, and 308 all 25 Amp / units 104, 204, 304, 205, and 305 all 20 Amp | CHIPO | CHIPO | | E= | P | 6365151 |
DILLER ELECTRIC LLC | E= | P | 10/09/2019 | Building 1 electrical complete except A/C units | CHIPO | CHIPO | | E= | P | 6363546 |
DILLER ELECTRIC LLC | E= | P | 10/08/2019 | BLD 1 east stair well side and units--unit 308 bedroom closet light does not work / unit 207 laundry breaker won't trip----all other units okay | CHIPO | CHIPO | | E= | P | 6362346 |
DILLER ELECTRIC LLC | E= | P | 10/04/2019 | 203,301,302,303,304 Need breaker lockouts for baseboard heaters in HWH closets / 303 Small Appliance breaker not functioning /------------------------- 203 DW ckt not functioning / Recpt not trimmed behind door in Bedroom 3 / In use cover for deck receptacple not oriented properly / | ROB | ROB | | E= | P | 6357815 |
DILLER ELECTRIC LLC | E= | C | 10/04/2019 | FIRE ALARM INSPECTION: complete / | ROB | ROB | | E= | C | 6357775 |
DILLER ELECTRIC LLC | E= | C | 10/04/2019 | FIRE ALARM INSPECTION: rough complete / | ROB | ROB | | E= | C | 6357776 |
DILLER ELECTRIC LLC | E= | P | 09/30/2019 | 301,302,303,304 Need thermostat on heater in storage room , cannot put GFCI recepts. behind washer / 302,303,304 DW GFCI breaker no functioning / 303 small applince breaker not functioning / 15/2 for 302,304 CU / 30/2 for 301,303 CU / Note: GFCI protection will be required for 1st level storage room recept. and the recpt. in the keyless / | ROB | ROB | | E= | P | 6351915 |
DILLER ELECTRIC LLC | ES | C | 08/19/2019 | Commercial Service: Apartment BLDG with 800 Amp and 600 Amp 3 wire services--800 Amp has House meter at 200 Amps and 11 units (107, 202, 205, 207, 301, 302, 303, 305, 306, 307, 308) at 125 Amps. 600 Amp service has 9 units (103, 104, 108, 201, 203, 204, 206, 208, 304) at 125 Amps--okay to set meters. | CHIPO | CHIPO | | ES | C | 6306246 |
DILLER ELECTRIC LLC | ES | P | 08/06/2019 | Commercial Service: GEC terminated and jumpers installed at water pipe main / No meters at this time / | ROB | ROB | | ES | P | 6289879 |
DILLER ELECTRIC LLC | ER | P | 06/26/2019 | Air Handlers ok / Still need to correct interconnector devices / | ROB | ROB | | ER | P | 6244433 |
DILLER ELECTRIC LLC | ER | P | 06/25/2019 | Rough for 3rd level soffitts ok with the following exception: Cannot use intanderconnector devices in 304, 305, and 307 soffits / Cannot run NM cable in return area of air handler / | ROB | ROB | | ER | P | 6242833 |
DILLER ELECTRIC LLC | ES | P | 04/09/2019 | Commercial Service: 3/0 CU to rebar ufer ok, need to provide access at clamp connection / 3/0 CU towater pipe ok, final connections need to be competed when water manifold is completed / | ROB | ROB | | ES | P | 6159799 |
DILLER ELECTRIC LLC | ER | P | 02/22/2019 | Building 1 rough in complete except for house panel wall in garage area, meter stack wall in 103, and water heater soffit areas in each unit. | CHIPO | CHIPO | | ER | P | 6114880 |
DILLER ELECTRIC LLC | ER | C | 02/22/2019 | FIRE ALARM INSPECTION: building 1 fire alarm rough in complete | CHIPO | CHIPO | | ER | C | 6114876 |
DILLER ELECTRIC LLC | ER | P | 02/20/2019 | rough ok for units 305,306,307,308 except bath/ hall soffits / Rough ok for 3rd level corridor / Electrical Rough ok, FA not complete ---------------do not sheetrock--------------- / | ROB | ROB | | ER | P | 6111731 |
DILLER ELECTRIC LLC | ER | P | 01/28/2019 | elect consultation | TOMC | TOMC | | ER | P | 6089669 |
DILLER ELECTRIC LLC | EUG | P | 12/11/2018 | Pole bases ok--highlited on print SP-1 / | ROB | ROB | | EUG | P | 6048679 |
DILLER ELECTRIC LLC | EUG | P | 11/30/2018 | EUG for pole lights and bollards--High lited prints / | ROB | ROB | | EUG | P | 6039488 |
DILLER ELECTRIC LLC | EUG | P | 11/28/2018 | EUG ok for SE corner pole lights--Dated and high lited on prints / | ROB | ROB | | EUG | P | 6036136 |
DILLER ELECTRIC LLC | EUG | P | 11/27/2018 | EUG for 3/4" pvc site lighting on west side and south east areas of site--High lited on prints / | ROB | ROB | | EUG | P | 6034775 |
DILLER ELECTRIC LLC | ESL | P | 10/02/2018 | ESL ok for kitchen island stubs--- Discussed accessibility requirements with contractor / | ROB | ROB | | ESL | P | 5982591 |
SOLUTIONS MECHANICAL LLC | H= | C | 12/17/2019 | GAS SPLICE ON FILE | MARKB | MARKB | | H= | C | 6429360 |
SOLUTIONS MECHANICAL LLC | H= | P | 12/05/2019 | METER VERIFICATION RECEIVED FROM CSU. | MARKB | MARKB | | H= | P | 6417056 |
R & R HEATING & AIR CONDITIONING, INC. | H= | C | 12/02/2019 | | MARKB | MARKB | | H= | C | 6412413 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 10/23/2019 | ***UPDATED 12/2/19 BY BILL S. : TEST AND BALANCE REPORT NOT REQUIRED FOR HEATING FINAL, OUTSIDE AIR BY NATURAL VENTILATION*** FINAL PENDING AIR BALANCE REPORT | BILLS | BILLS | | H= | P | 6378487 |
SOLUTIONS MECHANICAL LLC | H= | P | 10/23/2019 | NEED PLAN SPLICE FOR GAS PIPING, PROVIDE METER VERIFICATION LETTER FROM CSU, | BILLS | BILLS | | H= | P | 6378483 |
SOLUTIONS MECHANICAL LLC | H= | P | 10/22/2019 | BUILDING #1 WEST TOWER. WILL RESEARCH WATER HEATER TERMINATION VENT CAP AND CALL CONTRACTOR ON THE FOLLOWING MORNING. NEED PLAN SPLICE FOR GAS PIPING, PROVIDE METER VERIFICATION LETTER FROM CSU, REMOVE MISSION BAND FROM WATER HEATER VENT AT UNIT #103. | BILLS | BILLS | | H= | P | 6376789 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 10/21/2019 | BUILDING #1 EAST TOWER. UNIT #207,, MISSING PRIMARY FAN COIL CONDENSATE DRAIN (UNDER COUNTER). OK TO ATTACH PICTURES AT NEXT INSPECTION REQUEST. | BILLS | BILLS | | H= | P | 6375579 |
SOLUTIONS MECHANICAL LLC | H= | P | 10/16/2019 | FOR FINAL - Support gas piping in water heater rooms, vent condensate pipe needs to go to floor drain, water heater vent caps need to be installed per manufacturer instructions, need plan splice for gas piping, provide meter verification letter from CSU. | MARKB | MARKB | | H= | P | 6371067 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 10/15/2019 | 10/21/19: Changed from complete to partial, still need inspections on east tower NS. WEST TOWER - FINAL WALK COMPLETE. Still need east tower. | MARKB | MARKB | | H= | P | 6369366 |
R & R HEATING & AIR CONDITIONING, INC. | HSP | P | 10/10/2019 | WEST TOWER ONLY - WALK FOR 1ST, 2ND & 3RD FLOORS COMPLETE EXCEPT: Need to finish tying condensate piping in under sinks. | MARKB | MARKB | | HSP | P | 6365064 |
R & R HEATING & AIR CONDITIONING, INC. | HV | P | 09/20/2019 | BUILDING #1 EAST TOWER. CORRECTIONS MADE AT REMAINDER OF WATER HEATER VENTS | BILLS | BILLS | | HV | P | 6343275 |
R & R HEATING & AIR CONDITIONING, INC. | HV | P | 09/04/2019 | EAST TOWER: WATER HEATER VENTS - Units 107, 205, 207, 208 & 305 OK. Other units - cannot use plumbing mission band in a vent system, combustion air distance needs to be equal to or less than vent length. Vent termination caps must be installed within 1" of wall. | MARKB | MARKB | | HV | P | 6323907 |
R & R HEATING & AIR CONDITIONING, INC. | HV | P | 08/30/2019 | BUILDING #1 WEST TOWER. ALL UNITS WATER HEATER VENTING (CONCENTRIC) OK. AT FINAL: CONFIRM VENT CONDENSATE DRAIN LINES AND TRAP LOOPS. | BILLS | BILLS | | HV | P | 6320975 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 07/16/2019 | BUILDING #1, WEST TOWER, ALL FLOORS, ALL HYDRONIC AND CONDENSATES AT FAN COILS OK | BILLS | BILLS | | HWP | P | 6265474 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 07/11/2019 | BUILDING #1, WEST TOWER, ALL FLOORS, ALL HYDRONIC AND CONDENSATES AT FAN COILS OK EXCEPT FOR UNIT #202 (PRIMARY CONDENSATE DRAIN IS BACK GRADED) | BILLS | BILLS | | HWP | P | 6260802 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 07/10/2019 | BUILDING #1, EAST TOWER, ALL FLOORS, ALL HYDRONIC AND CONDENSATES AT FAN COILS OK | BILLS | BILLS | | HWP | P | 6259407 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 07/01/2019 | 3RD FLOOR-- #301 MISSING INSULATION, #302 MISSING INSULATION AND BOTH CONDENSATE DRAINS BACK GRADED, #303 MISSING INSULATION AND PRIMARY CONDENSATE REQUIRES SUPPORT (BOWED UP), #304 MISSING INSULATION AND SECONDARY CONDENSATE DRAIN NEEDS SUPPORT, #305 MISSING INSULATION AND NEED NAIL PROTECTION AT PRIMARY CONDENSATE DRAIN, #306 NEEDS NAIL PROTECTION AT PRIMARY CONDENSATE DRAIN, #307 MISSING INSULATION AND NEED NAIL PROTECTION AT PRIMARY CONDENSATE DRAIN, #308 MISSING INSULATION, NEED NAIL PROTECTION AT PRIMARY CONDENSATE DRAIN, NEED SUPPORT AT SECONDARY CONDENSATE DRAIN | BILLS | BILLS | | HWP | P | 6250490 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 06/21/2019 | CONNECTIONS TO FAN COILS - Supply/return lines need to be protected through cabinet and insulated. Condensate lines lack proper slope and are not yet complete. | MARKB | MARKB | | HWP | P | 6240411 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 06/21/2019 | ABOVE CEILING DUCT - ROUGH DUCT/FAN COIL UNITS BELOW PRE-ROCK COMPLETE FOR 1ST, 2ND & 3RD FLOORS EXCEPT FOR BOOTS THAT ATTACH TO DROP CEILING. | MARKB | MARKB | | HD | P | 6240409 |
R & R HEATING & AIR CONDITIONING, INC. | HWP | P | 05/06/2019 | 7/9/19: Changed from complete to partial so contractor could call in another inspection request. Piping was not complete yet. Changed by NS. PRESSURE TEST AND INSULATION COMPLETE FOR SUPPLY/RETURN HYDRONIC PIPING TO FAN COIL UNITS FOR 1ST, 2ND & 3RD FLOORS. | MARKB | MARKB | | HWP | P | 6190060 |
SOLUTIONS MECHANICAL LLC | HSP | P | 04/26/2019 | HAD ON SITE CONSULT WITH MIKE (JOB SUPER - H.W. HOUSTON), STILL NEED TO COMPLETE HYDRONIC PIPING INSPECTIONS IN BUILDING ONE AND DRYWALL HAS STARTED. TOLD MIKE WE WOULD WORK WITH HIM TO MINIMIZE AMOUNT OF DRYWALL WOULD NEED TO BE REMOVED. WILL NEED A 65 PSI PRESSURE TEST, NEED TO INSPECT INSULATION AND NAIL PROTECT FOR SUPPLY/RETURN PIPING FROM WATER HEATERS TO FAN COILS. | MARKB | MARKB | | HSP | P | 6179346 |
SOLUTIONS MECHANICAL LLC | HRR | R | 03/29/2019 | Could not locate contractor on site - Inspection requested not used for commercial, not sure what contractor wanted inspected. | MARKB | MARKB | | HRR | R | 6149282 |
SOLUTIONS MECHANICAL LLC | HC | C | 03/19/2019 | OK TO RELEASE METERS FOR ALL 20 UNITS. | MARKB | MARKB | | HC | C | 6137428 |
SOLUTIONS MECHANICAL LLC | HI | C | 03/19/2019 | BY FINAL - Need plan splice with correct meter location, meter verification letter from CSU, final connections and support drops in mechanical closets. 10 PSI PRESSURE TEST x 20 OK. 1ST, 2ND & 3RD FLOORS COMPLETE. | MARKB | MARKB | | HI | C | 6137370 |
SOLUTIONS MECHANICAL LLC | HI | P | 03/18/2019 | ----PLAN SLICE REQUIRED - meter bank is installed in a different location than plans show---- HIGH TEST (Test should be 10 psi on a 30 psi gauge). Still need to see third floor units and support drops in mechanical closets. | MARKB | MARKB | | HI | P | 6135849 |
SOLUTIONS MECHANICAL LLC | HWP | P | 03/07/2019 | Condensate lines in walls for FCU's complete for all units. Still need hydronic lines completed. | MARKB | MARKB | | HWP | P | 6127085 |
SOLUTIONS MECHANICAL LLC | HI | L | 03/07/2019 | Contractor not ready | MARKB | MARKB | | HI | L | 6127077 |
R & R HEATING & AIR CONDITIONING, INC. | HSP | P | 02/22/2019 | Worked with building chief, field senior and site inspector on exhaust fan in load bearing wall with double plate cut out. Site inspector will work with Job superintendent to get proper protection detail. May need additional inspections. EXHAUST FANS THAT SERVE BATHROOMS ARE OK. | MARKB | MARKB | | HSP | P | 6114007 |
R & R HEATING & AIR CONDITIONING, INC. | HRP | C | 02/21/2019 | 300 PSI PRESSURE TEST, LINESET INSULATION, SUPPORT AND NAIL PROTECTION OK FOR ALL 20 UNITS. No fan coils or condensers at this time. | MARKB | MARKB | | HRP | C | 6113275 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 02/21/2019 | ABOVE CEILING DUCT ABOVE PRE-ROCK - Walked all 20 units, further research required for how exhaust fans and duct penetrate top plates in every apartment. Need to complete duct support. Dryer instructions will allow 45' of pipe and 4 elbows with low-profile cap. MORE NOTES TO FOLLOW. | MARKB | MARKB | | HD | P | 6113266 |
R & R HEATING & AIR CONDITIONING, INC. | HSP | P | 01/31/2019 | ON SITE CONSULT FOR WATER HEATER VENTS. WENT OVER PLANS AND MANUFACTURER INSTRUCTIONS IN TRAILER. DISCUSSED CLUB HOUSE GAS SPLICE AND VENT LOCATIONS WITH JOB SUPERINTENDENT, PLUMBER AND HVAC. | MARKB | MARKB | | HSP | P | 6094256 |
R & R HEATING & AIR CONDITIONING, INC. | HSP | P | 01/10/2019 | ON SITE CONSULT WITH MECHANICAL CONTRACTOR TO LOOK AT PLANS, TALK ABOUT RATINGS AND PENETRATIONS. ABOVE PRE-ROCK MECHANICAL WILL HAVE INSPECTIONS ON GAS PIPING, WATER HEATER VENTS. HYDRONIC PIPING, REFRIGERATION PIPING, EXHAUST DUCTS & CONDENSATE PIPING. PLANS SHOW MAJORITY OF DUCT BELOW PRE-ROCK. ALSO WENT OVER RADIATION DAMPERS IN ROOF/CEILING ASSEMBLY FOR CLUB HOUSE. | MARKB | MARKB | | HSP | P | 6075180 |
BEFORT CONSTRUCTION | P= | C | 10/15/2019 | east units 107, 108, 205, 206, 207, 208, 305, 306, 307, 308 complete, water meter room complete | TED | TED | | P= | C | 6368552 |
BEFORT CONSTRUCTION | P= | P | 10/14/2019 | all west 103, 104, 201, 203, 202, 204, 301, 303, 302, 304, complete | TED | TED | | P= | P | 6367062 |
BEFORT CONSTRUCTION | P= | P | 10/11/2019 | 303 complete, 301- no hot water temp. to fixtures, 304- right lav water crossed, 302- leak under left lav | TED | TED | | P= | P | 6365613 |
BEFORT CONSTRUCTION | P= | P | 10/08/2019 | 107-complete east bathroom trim, check trap guard, 108- complete bathroom trim, uncover floor drain, 207- loose shower arm 90 in wall, check trap guard, 205- leak under right lav, to many slip joint on trap arm, loose shower arm 90 in wall, check trap guard | TED | TED | | P= | P | 6361222 |
BEFORT CONSTRUCTION | P= | P | 10/07/2019 | 306- shower arm 90s loose in wall, tub spouts loose in wall, uncover water heater floor drain, 308- shower arm 90s and tub spouts loose loose in wall, install t&p drain, 305, shower arm 90s and tub spouts loose in wall, 307- shower arm 90s and tub spouts loose in wall, install t&p drain, 205- shower arm 90s and tub spouts loose in wall, | TED | TED | | P= | P | 6359619 |
BEFORT CONSTRUCTION | PTO | C | 04/18/2019 | water heater room floor drains test complete | TED | TED | | PTO | C | 6170071 |
BEFORT CONSTRUCTION | PTO | P | 04/16/2019 | lost test/no test water heater floor drains through out | TED | TED | | PTO | P | 6166777 |
BEFORT CONSTRUCTION | PTO | P | 04/12/2019 | lost test/ no test floor drains through out | TED | TED | | PTO | P | 6163614 |
BEFORT CONSTRUCTION | PTO | P | 04/11/2019 | field cancel | TED | TED | | PTO | P | 6162519 |
BEFORT CONSTRUCTION | PTO | P | 04/10/2019 | 1st floor tub waste and overflow tests ok | TED | TED | | PTO | P | 6161477 |
BEFORT CONSTRUCTION | PTO | P | 04/05/2019 | water main complete, still need 1st floor tub waste and overflow tests, need mech. room floor drain tests | TED | TED | | PTO | P | 6156390 |
BEFORT CONSTRUCTION | PTO | P | 04/03/2019 | still need tub set at 103, water pipe under sized at 107, need to test water main, | JOSEPHD | JOSEPHD | | PTO | P | 6154084 |
BEFORT CONSTRUCTION | PTO | P | 03/29/2019 | dwv units 104 204, 304, 202, 302 still need to test 1st floor tub waste and over flows | TED | TED | | PTO | P | 6148882 |
BEFORT CONSTRUCTION | PTO | P | 03/25/2019 | water piping for units 104, 204, 304, 202, 302, 1st floor tubs and tub vales install, still need to test waste and overflows | TED | TED | | PTO | P | 6142973 |
BEFORT CONSTRUCTION | PTO | P | 03/22/2019 | tub valves and tub installed 103, 104, 108 still need over flow test | TED | TED | | PTO | P | 6141409 |
BEFORT CONSTRUCTION | PTO | P | 03/21/2019 | dwv and unit water piping, 103--install tub valves and test, test floor drains, 201--replace no hub couplings with mission bands, 203-- test floor drains, 301--install shower valve, 303-- replace no hub couplings with mission bands | TED | TED | | PTO | P | 6139633 |
BEFORT CONSTRUCTION | PTO | P | 03/20/2019 | apartment unit numbers have been changed or covered, still need 1st floor tub/shower valves installed and test tub waste/over flows, still need floor drains tested, east stack 207? test ok | TED | TED | | PTO | P | 6138306 |
BEFORT CONSTRUCTION | PTO | P | 03/11/2019 | field cancel | TED | TED | | PTO | P | 6129847 |
BEFORT CONSTRUCTION | PTO | P | 03/08/2019 | dwv test units 107-need to set tubs, test drains, need to install tub shower valves, no test on floor drain piping from above, 207- leak on dwv east stack, no test on floor drian piping, 205, 305, 307 no test floor drain piping | TED | TED | | PTO | P | 6128051 |
BEFORT CONSTRUCTION | PTO | P | 03/07/2019 | dwv test units 108- still need to set tubs and test drains, 208-need to test floor drain, 206- need to test floor drain, 308- need to test floor drain, 306 ok | TED | TED | | PTO | P | 6127394 |
BEFORT CONSTRUCTION | PTO | P | 03/07/2019 | dwv design- still need test--103, 201, 203, 301 replace no hub couplings with mission bands, need water heater floor drain, 303 need water heater floor drain vent, replace no hub coupling, unit water piping-shower valves installed and tested 207, 205, 208, 206, 308, 306 | TED | TED | | PTO | P | 6126603 |
BEFORT CONSTRUCTION | PTO | P | 03/06/2019 | water piping for units in wall and ceiling, 104-install and test through tub/shower valves, 108-install and test through tub/shower valves, 206-connect and test through tub/shower valves, 208-connect and test through tub/shower valves, 205- ok, 207- ok, 306- ok, 308- ok, 307- ok, 305- ok | TED | TED | | PTO | P | 6125473 |
BEFORT CONSTRUCTION | PTO | P | 02/28/2019 | dwv-- 107, 202, 207, 302 (mech. room floor drain vent comby reversed) , 307, design ok, need test | TED | TED | | PTO | P | 6120241 |
BEFORT CONSTRUCTION | PTO | P | 02/27/2019 | dwv-- 104,205 (missing mech. room floor drain), 207, 305, 307 design ok, need to test | TED | TED | | PTO | P | 6118842 |
BEFORT CONSTRUCTION | PTO | P | 02/26/2019 | dwv- 108, 208, 206, 308, 306, design ok, repair leaks through out | TED | TED | | PTO | P | 6118120 |
BEFORT CONSTRUCTION | PB | C | 02/26/2019 | Base inspection completed under building 3211 permit that was called in wrong. | DANR | DANR | | PB | C | 6117006 |
BEFORT CONSTRUCTION | XPS | T | 08/22/2019 | PAID (REC#1630343): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 8/22/19: Delta 6 revisions water pipe sizing | SHANEN | SHANEN | | XPS | T | 6310200 |
H.W. HOUSTON CONSTRUCTION LLC | XBS | T | 08/21/2019 | PAID (REC#1624089) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided detail for ceiling at enclosure. | BPHILLIPS | BPHILLIPS | | XBS | T | 6309137 |
BEFORT CONSTRUCTION | XPS | T | 08/14/2019 | PAID (REC#1622138) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 8/14/19: 1 1/4" water mains to units B & D.1 | SHANEN | SHANEN | | XPS | T | 6299863 |
H.W. HOUSTON CONSTRUCTION LLC | XBS | T | 05/16/2019 | PAID (REC#1598975) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Glass guards | SHELLEY | SHELLEY | | XBS | T | 6200804 |
H.W. HOUSTON CONSTRUCTION LLC | XBS | T | 04/03/2019 | PAID (REC#1587491) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised roof/ceiling assembly to P545; clarified stud pack encasement | SHELLEY | SHELLEY | | XBS | T | 6154079 |
H.W. HOUSTON CONSTRUCTION LLC | XBS | T | 03/18/2019 | PAID (REC#1583029) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Details for 3rd floor bearing/non-bearing walls and electrical/av cabinets in rated bearing walls. | SHELLEY | SHELLEY | | XBS | T | 6135914 |
H.W. HOUSTON CONSTRUCTION LLC | XBS | T | 02/26/2019 | PAID (REC#1578939) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: TRUSSES | SHELLEY | SHELLEY | | XBS | T | 6117778 |
H.W. HOUSTON CONSTRUCTION LLC | XES | C | 08/15/2018 | PLAN SPLICE FEE: $0 by: SHELBY for Electrical: Revise one line | SHELBY | SHELBY | | XES | C | 5935189 |
H.W. HOUSTON CONSTRUCTION LLC | XBS | T | 08/15/2018 | PAID (REC#1527510) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Structural and section details | SHELLEY | SHELLEY | | XBS | T | 5935129 |