S2 CONTRACTING, LLC | B= | C | 10/25/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6006109 |
S2 CONTRACTING, LLC | B= | P | 10/22/2018 | with completed plumbing B= okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BLUE IGUANA PLUMBING Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6001649 |
S2 CONTRACTING, LLC | BFR | P | 08/23/2018 | All framing OK pending plumbing complete | NICK | NICK | | BFR | P | 5943665 |
S2 CONTRACTING, LLC | BFR | P | 08/16/2018 | Need to install backing for grab bars / Reviewed accessible elements / Need all MEP's complete | NICK | NICK | | BFR | P | 5935946 |
MEYER ELECTRIC | E= | C | 07/25/2018 | large access in hard lid in bathroom for boxes and HWH / | MIGUEL | MIGUEL | | E= | C | 5914272 |
MEYER ELECTRIC | ER | C | 07/10/2018 | GRID CEILINGS---OK-----EXCEPT THE BATHROOM | BRIAN | BRIAN | | ER | C | 5898442 |
MEYER ELECTRIC | E= | P | 07/10/2018 | NEED GRID CEILING OR HARD LID WITH LARGE ACCESS FOR WATER HEATER AND J BOXES IN BATHROOM ---REST OK---- | BRIAN | BRIAN | | E= | P | 5898430 |
MEYER ELECTRIC | E= | R | 06/29/2018 | splice plan for panel location on wall at 45 degree angle, j box feeding panel: EGC needs lug to can,use nut/bolt,scrape paint, pipe fittings from box to panel are loose, strap pipe, panel: strap cables above panel, flex needs proper connector, not emt connector, 1.25" connector on top is missing set screw, fixtures that were relocated or new need tiles removed on both ends of fixture for inspection, no sheet rock, | JOHNN | JOHNN | | E= | R | 5889717 |
MEYER ELECTRIC | ER | P | 05/30/2018 | wall rough only, | JOHNN | JOHNN | | ER | P | 5858632 |
MEYER ELECTRIC | ER | R | 05/23/2018 | NEW OUTLETS NEED TO MEET THE ACCESSIBILITY HEIGHTS-----MOUNT BOX 20" TO TOP FOR OUTLETS------FINISH INSTALLING THE OUTLET IN THE OFFICE WALL ON THE LOUNGE SIDE-----NEED DEEPER MUD RINGS ON COUNTER OR ARC SHIELDS ON FINAL-----VERIFY ACCESS TO J BOX IN BATH CEILINGS------ | BRIAN | BRIAN | | ER | R | 5853435 |
MEYER ELECTRIC | ER | R | 05/22/2018 | no one on site---need call ahead # or lock box for next inspection or pay trip fee | BRIAN | BRIAN | | ER | R | 5851799 |
MEYER ELECTRIC | ER | L | 05/21/2018 | no one there | JOHNN | JOHNN | | ER | L | 5850422 |
MEYER ELECTRIC | ER | R | 05/08/2018 | lower switches per ADA standards, strap mc cable, complete wall rough in before re inspect. | JOHNN | JOHNN | | ER | R | 5839105 |
BLUE IGUANA PLUMBING, INC. | P= | C | 10/23/2018 | Corrections made | SHANEN | SHANEN | | P= | C | 6002832 |
BLUE IGUANA PLUMBING, INC. | P= | P | 10/22/2018 | Install trap guard in restroom floor drain, need flush lever to accessible side of water closet, install tempering valve and lav guards at lav, leak under lav, rest OK | SHANEN | SHANEN | | P= | P | 6001313 |
BLUE IGUANA PLUMBING, INC. | PTO | C | 09/11/2018 | Corrections made | SHANEN | SHANEN | | PTO | C | 5961156 |
CASEBIER MECHANICAL CONTRACTORS | PTO | P | 09/10/2018 | No test on above grade DWV, rest OK, remove 1 water closet from scope of work | SHANEN | SHANEN | | PTO | P | 5959635 |
CASEBIER MECHANICAL CONTRACTORS | P= | R | 09/10/2018 | Not ready needs PTO | SHANEN | SHANEN | | P= | R | 5959625 |
CASEBIER MECHANICAL CONTRACTORS | PB | C | 04/13/2018 | corrections made. | TAYLOR | TAYLOR | | PB | C | 5817079 |
CASEBIER MECHANICAL CONTRACTORS | PB | P | 04/09/2018 | low test DWV, re- grade 4x3 wye for mop sink, toilet at mens restroom will lack proper clearances after wall is framed, rest ok, note: revise plans for POC to existing 4 inch S.S by final. | TAYLOR | TAYLOR | | PB | P | 5811855 |
CASEBIER MECHANICAL CONTRACTORS | XPS | T | 07/31/2018 | PAID (REC#1522620) PLAN SPLICE FEE: $50 by: DALEH for Plumbing: splice to add drinking fountain | DALEH | DALEH | | XPS | T | 5919086 |
MEYER ELECTRIC | XES | P | 07/30/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Splice to remove scope - Restroom and serving bar removed. | BERTHA | BERTHA | | XES | P | 5918059 |
S2 CONTRACTING, LLC | XBS | T | 07/23/2018 | PAID (REC#1522619) PLAN SPLICE FEE: $50 by: DANM for Construction: No longer part of House of Sushi (adjacent space) - separate tenant space to remain Mercantile with only 1 restroom | DANM | DANM | | XBS | T | 5911329 |
MEYER ELECTRIC | XES | T | 07/10/2018 | PAID (REC#1515258) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Splice to show as-built conditions per inspector's comments. | BERTHA | BERTHA | | XES | T | 5898039 |
S2 CONTRACTING, LLC | XES | P | 03/16/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised Panel P1 location. | BERTHA | BERTHA | | XES | P | 5791698 |
S2 CONTRACTING, LLC | XBS | T | 03/16/2018 | PAID (REC#1487899) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised floor plan back wall. | BPHILLIPS | BPHILLIPS | | XBS | T | 5791652 |