ELDER CONSTRUCTION, INC. | B= | C | 09/18/2018 | requested paperwork of bearing pressure and pad size submitted | NATHAN | NATHAN | | B= | C | 5967950 | ELDER CONSTRUCTION, INC. | B= | P | 08/20/2018 | need splice for added pads and open hole at basement beam. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): RK MECHANICAL, INC Mechanical Final Inspection is not Completed yet, RK MECHANICAL, INC Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5939175 | ELDER CONSTRUCTION, INC. | BFR | P | 07/11/2018 | final layer drywall attachment and stagger per listing 1st and 2nd floor. lower basement ceiling with completed mechanical. | NATHAN | NATHAN | | BFR | P | 5898850 | ELDER CONSTRUCTION, INC. | BFR | P | 07/03/2018 | 2 layers 2nd floor lift walls and ceiling okay, structural wall at basement room 018 okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5892429 | ELDER CONSTRUCTION, INC. | BSP | P | 07/02/2018 | need protected opening in basement ceiling at rooms 017,018 mechanical in 1 hr ceiling, frame and 1st layer drywall per all listings at lift shaft and drywall at basement ceiling annular gap has been corrected at pipes. rooms 017,018. | NATHAN | NATHAN | | BSP | P | 5891143 | ELDER CONSTRUCTION, INC. | BSP | P | 06/27/2018 | screw inspection and 2nd layer drywall at basement room 017,018 need sprinkler pipe annular space corrected to listing or provide listing for 1" annular space | NATHAN | NATHAN | | BSP | P | 5886906 | ELDER CONSTRUCTION, INC. | BFR | P | 06/25/2018 | hard lid grid ex at rooms 106,110,112,113 okay with completed required inspections, basement rated lid first layer attachment at 017, 018 okay will need listing for clustered penetrations at 018 room ceiling or engineering judgement. | NATHAN | NATHAN | | BFR | P | 5884011 | ELDER CONSTRUCTION, INC. | BFR | P | 06/14/2018 | lift enclosure framing wood 1st and 2nd floor and partial first floor steel stud framing okay with completed required inspection / spoke with Bob and Tony on listings for rated wall, listings to be printed or readily available for inspection on next inspection. | NATHAN | NATHAN | | BFR | P | 5874615 | ELDER CONSTRUCTION, INC. | BSP | P | 05/31/2018 | bolting at post and beam for basement lift support okay, | NATHAN | NATHAN | | BSP | P | 5860600 | ELDER CONSTRUCTION, INC. | BFR | P | 05/29/2018 | need inspection of lift walls, rated walls, and all hard lids and ceiling framing, will need changed rated listing spliced into plan, have all listings for rated walls printed and on site for inspection. remaining walls okay with completed required inspections. Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 5857572 | ELDER CONSTRUCTION, INC. | BFT | P | 05/14/2018 | Need to splice plans to show new pads and footings, not on approved plans / 2 new 36x36 pads OK per plans on site / Still need to inspect new footing / Need open hole report / Poor pads at own risk / Reviewed rated horizontal assembly with contractor / Reviewed accessible elements | NICK | NICK | | BFT | P | 5844180 | ELDER CONSTRUCTION, INC. | BFT | P | 05/14/2018 | Images on file for new pad reinforcement / Still need site visit / Need open hole report | NICK | NICK | | BFT | P | 5843390 | EL PASO ELECTRIC, LLC. | E= | C | 08/09/2018 | | GARYL | GARYL | | E= | C | 5929610 | EL PASO ELECTRIC, LLC. | E= | P | 08/07/2018 | Left to do: u/c light 2nd floor, ER=C for basement ceiling--not ready for final, label equipment so disconnects easily understood | GARYL | GARYL | | E= | P | 5926654 | EL PASO ELECTRIC, LLC. | E= | P | 08/06/2018 | Mezzanine is complete, 2nd floor still missing uc , and bath room wall light, 1st floor complete, basement: need mech room and misc | GARYL | GARYL | | E= | P | 5925341 | EL PASO ELECTRIC, LLC. | E= | P | 08/03/2018 | Rooms okay: 105, 106, 107, 108, 113, 114, 115, 116, 1) gfci water cooler, nothing ready on 2nd floor as per last inspection | GARYL | GARYL | | E= | P | 5923536 | EL PASO ELECTRIC, LLC. | E= | P | 08/02/2018 | 2nd floor: except, 1- u/c light, 1- vanity light, nothing inspected on 3rd floor | GARYL | GARYL | | E= | P | 5922605 | EL PASO ELECTRIC, LLC. | E= | P | 08/01/2018 | Basement: EXCEPT, new rough-in for ceiling lights and a/c, mechanical room, electric room. the rest of basement okay | GARYL | GARYL | | E= | P | 5921210 | EL PASO ELECTRIC, LLC. | ER | P | 07/31/2018 | ceiling above reception area | GARYL | GARYL | | ER | P | 5919651 | EL PASO ELECTRIC, LLC. | E= | C | 07/25/2018 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 5913882 | EL PASO ELECTRIC, LLC. | ER | P | 07/05/2018 | ER-- is complete for basement, ceilings are complete for 2nd floor, ceiling lights in front of elevator okay for sheet rock | GARYL | GARYL | | ER | P | 5894143 | EL PASO ELECTRIC, LLC. | ER | P | 06/28/2018 | FIRE ALARM INSPECTION: marked/dated on prints | GARYL | GARYL | | ER | P | 5888911 | EL PASO ELECTRIC, LLC. | ER | R | 06/28/2018 | need working for heater in ceiling room # 112 | GARYL | GARYL | | ER | R | 5888880 | EL PASO ELECTRIC, LLC. | ER | P | 06/22/2018 | NOTE! need correct sized/location of access for electrical disconnect, went over with Eric/Tony, walls and ceilings in differant areas marked/dated on prints | GARYL | GARYL | | ER | P | 5883205 | EL PASO ELECTRIC, LLC. | ER | P | 06/22/2018 | FIRE ALARM INSPECTION: south end rough-in complete | GARYL | GARYL | | ER | P | 5883199 | EL PASO ELECTRIC, LLC. | ER | P | 06/20/2018 | walls and ceiling in room 117, walls only--marked on prints | GARYL | GARYL | | ER | P | 5880161 | EL PASO ELECTRIC, LLC. | ER | P | 06/13/2018 | all walls EXCEPT, lift room and equipment, cabinetry not set with stubs only, several area | GARYL | GARYL | | ER | P | 5873752 | EL PASO ELECTRIC, LLC. | ER | P | 06/13/2018 | FIRE ALARM INSPECTION: walls in basement | GARYL | GARYL | | ER | P | 5873729 | EL PASO ELECTRIC, LLC. | ER | P | 06/12/2018 | FIRE ALARM INSPECTION: ceilings in basement for F/A | GARYL | GARYL | | ER | P | 5872140 | EL PASO ELECTRIC, LLC. | ER | P | 06/12/2018 | ALL CEILINGS IN BASEMENT | GARYL | GARYL | | ER | P | 5872136 | EL PASO ELECTRIC, LLC. | ER | P | 06/05/2018 | Rough-in on 2nd floor is complete, NOTE! mini split in closet, need working clearance, check on final | GARYL | GARYL | | ER | P | 5865229 | EL PASO ELECTRIC, LLC. | ER | R | 06/04/2018 | No one here at 4:00 pm | GARYL | GARYL | | ER | R | 5863980 | EL PASO ELECTRIC, LLC. | ER | P | 05/30/2018 | FIRE ALARM INSPECTION: marked/dated on prints, ceilings only | GARYL | GARYL | | ER | P | 5859254 | EL PASO ELECTRIC, LLC. | ER | P | 05/30/2018 | In basement: ceilings except for: mech room, breakroom-010, work room-007, need to box out around conduits etc | GARYL | GARYL | | ER | P | 5859240 | EL PASO ELECTRIC, LLC. | ER | P | 05/16/2018 | Several areas, marked and dated on prints,, WALLS only 2nd floor | GARYL | GARYL | | ER | P | 5846895 | EL PASO ELECTRIC, LLC. | ER | P | 05/16/2018 | FIRE ALARM INSPECTION: Basement ceilings, marked/dated on GC's prints | GARYL | GARYL | | ER | P | 5846890 | EL PASO ELECTRIC, LLC. | ESL | P | 05/16/2018 | esl in basement, marked/dated on prints,, 2-areas only, should be all of slab work on site | GARYL | GARYL | | ESL | P | 5846888 | EL PASO ELECTRIC, LLC. | EUG | P | 04/13/2018 | 1-2" conduit eug, of two, this one is new under sidewalk, extended from existing | GARYL | GARYL | | EUG | P | 5816681 | RK MECHANICAL, LLC | H= | C | 08/21/2018 | ALL PLAN REVISIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5940187 | RK MECHANICAL, LLC | H= | P | 08/15/2018 | NEED CONSULT WITH PLAN REVIEW ON ALL NEEDED REVISIONS - TAB REPORT OK | JERRYF | JERRYF | | H= | P | 5935120 | RK MECHANICAL, LLC | HSP | P | 08/15/2018 | NO OUTSIDE AIR LISTED ON TAB REPORT - NEED ALL OUTSIDE AIR SHOWN ON TAB | JERRYF | JERRYF | | HSP | P | 5934284 | MORNING STAR ELEVATOR, LLC. | HE= | C | 08/08/2018 | VPL COMPLETE | ERIC | ERIC | | HE= | C | 5927394 | RK MECHANICAL, LLC | H= | P | 08/01/2018 | NEED THE FOLLOWING TO COMPLETE - ADD ALL ELECTRIC HEATERS TO PERMIT - INSPECTION OF AC0.05 - TAB REPORT - ALL PLAN REVISIONS AND ENGINEER LETTERS PER PREVIOUS INSPECTION NOTES NOTES: ALL MECHANICAL PIPING OK TO INSULATE | JERRYF | JERRYF | | H= | P | 5920484 | RK MECHANICAL, LLC | HSP | P | 08/01/2018 | CALLED CONTRACTOR AND HAD CONSULT IN REGARDS TO FC5406 CEILING RATING FOR BASEMENT AREA AT ELEVATOR / ASSEMBLY USED WAS NOT TESTED WITH A DAMPER IN THE ASSEMBLY - NEED ENGINEER TO ADDRESS - (((((( STILL NEED ALL PLAN REVISIONS))))) | JERRYF | JERRYF | | HSP | P | 5920106 | RK MECHANICAL, LLC | H= | P | 07/31/2018 | CHANGED INSPECTION HEAT FINAL - NEED CONSULT WITH SENIOR INSPECTOR ON RADIATION DAMPERS IN RATED CEILING AND GAFC5406 LISTING - NEED ALL PLAN REVISIONS AND ENGINEER LETTERS APPROVED PER ALL PREVIOUS NOTES COMPLETED - TAB REPORT - CONTRACTOR WILL RECALL INSPECTION FOR 8/1 FOR WALK THRU | JERRYF | JERRYF | | H= | P | 5919508 | RK MECHANICAL, LLC | HD | P | 07/23/2018 | MECHANICAL ROOM: BOILER VENT TERMINATIONS AND INTAKES NOT IN SAME PRESSURE ZONE PER MANUFACTURERS INSTRUCTIONS, NEED ENGINEER TO APPROVE TERMINATION LOCATIONS. PROPERLY SUPPORT BOILER VENT PIPES. OUTSIDE AIR AND EXHAUST DUCTS IN MECHANICAL ROOM OK, OK TO WRAP. MEZZANINE: NEED REVISED/APPROVED PRINT FOR CHANGE IN EQUIPMENT FROM CASSETTE TO DUCTED FOR UPPER LEVEL SUPPLY IN LOBBY. EXHAUST AND OUTSIDE AIR DUCTS IN MEZZANINE OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5910859 | RK MECHANICAL, LLC | HWP | P | 07/23/2018 | CHILLED WATER SUPPLY/RETURN: CONNECTIONS FROM TUNNEL TO BUILDING ALREADY UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO INSULATE AND LABEL. WILL NEED TO SEE PICTURES OF INSULATION IF WALL GETS ROCKED PRIOR TO NEXT INSPECTION. | NANCY | NANCY | | HWP | P | 5910846 | RK MECHANICAL, LLC | HSP | P | 07/17/2018 | ALL REQUIRED GAS STUBS ARE COMPLETE ON PERMIT - STILL NEED GAS PLAN REVISED PER PREVIOUS NOTES. | JERRYF | JERRYF | | HSP | P | 5905664 | RK MECHANICAL, LLC | HC | C | 07/17/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5905662 | RK MECHANICAL, LLC | HI | C | 07/17/2018 | OK TO RELEASE METER | JERRYF | JERRYF | | HI | C | 5905656 | RK MECHANICAL, LLC | HI | P | 07/13/2018 | PRESSURE TEST OK ON ALL PIPING ( BY FINAL ADD 1 GAS STUB TO PERMIT AT THIS TIME PERMIT SHOWS 1 HAS 2 STUBS AT BOILERS | JERRYF | JERRYF | | HI | P | 5902136 | RK MECHANICAL, LLC | HD | P | 07/02/2018 | NEED ENGINEER TO PROVIDE HOW PROTECTING OSA OPENINGS IN 1 RATED CEILINGS AT BASEMENT ROOMS 017 AND 018 - NEED PLANS REVISED AS SOON AS POSSIBLE FOR ALL MECHANICAL PHASES NOTES: OSA DUCT OK TO WRAP AT THE FOLLOWING UNITS AC1.07 - 1.01 - 1.02 - 1.03 - 1,04 - 1.13 - 1.14 - 1.15 - 1.16 | JERRYF | JERRYF | | HD | P | 5891581 | RK MECHANICAL, LLC | HD | P | 06/26/2018 | NEED PLANS REVISED FOR RETURN DUCT IN BASEMENT AT AC1.10 / NEW DUCT LAYOUT IN JOISTS OK PENDING PLAN REVISION CONTRACTOR PROCEEDING AT ON RISK - ABOVE CEILING MAIN FLOOR OSA DUCT AND SUPPLY DUCT OK TO WRAP AT THE FOLLOWING RESTROOM NEXT TO OFFICE H / OFFICE H / ADA MENS RESTROOM - AC1.11 / OFFICE J THROUGH ATTIC | JERRYF | JERRYF | | HD | P | 5886155 | RK MECHANICAL, LLC | HI | P | 06/22/2018 | PRESSURE TEST OK FROM NEW METER LOCATION TO MECHANICAL ROOM - PIPING HAS BEEN PROTECTED AT EXTERIOR - STILL NEED ALL OTHER PIPING AND PLAN REVISION FOR NEW METER LOCATION | JERRYF | JERRYF | | HI | P | 5883107 | RK MECHANICAL, LLC | HRP | P | 06/15/2018 | NAIL PROTECTION OK AT ALL CONDENSATE PIPING | JERRYF | JERRYF | | HRP | P | 5876058 | RK MECHANICAL, LLC | HI | P | 06/15/2018 | PRESSURE TEST AND PIPING OK IN MECHANICAL ROOM AND BASEMENT HALLWAY ONLY - NEED PLANS REVISED TO MATCH INSTALLED / CONTRACTOR PROCEEDING AT OWN RISK - STILL NEED PIPING PROTECTED AT EXTERIOR WALL | JERRYF | JERRYF | | HI | P | 5876057 | RK MECHANICAL, LLC | HWP+ | P | 06/14/2018 | NEED NAIL PROTECTION AT ALL WALLS ON CONDENSATE PIPING | JERRYF | JERRYF | | HWP+ | P | 5874747 | RK MECHANICAL, LLC | HI | R | 06/14/2018 | NEED GAS ADDED TO PERMIT - NEED PLANS REVISED SHOWING NEW GAS LAYOUT - NEED 10# TEST ON 30# GAUGE - NEED SHEET ROCK REMOVED AT EXTERIOR WALL TO VERIFY PIPING - NEED GAS SLEEVED TROUGH EXTERIOR WALL - STOPPED INSPECTION - RE INSPECT ALL | JERRYF | JERRYF | | HI | R | 5874733 | RK MECHANICAL, LLC | HD | P | 06/06/2018 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR AC 2.05 BOX AND SA DUCT - AC 2.01 AND AC 2.02 RETURN DUCTS IN WALL ON 2ND FLOOR | JERRYF | JERRYF | | HD | P | 5866130 | RK MECHANICAL, LLC | HD | P | 06/05/2018 | THIS INSPECTION WAS FOR THE FOLLOWING - ABOVE CEILING OUTSIDE AIR AND EXHAUST RUN OUTS AND MAINS OK TO WRAP IN THE FOLLOWING AREA'S - BASEMENT / MAIN FLOOR LOBBY AND ELEVATOR SHAFT - NEED PLAN REVISED TO MATCH INSTALLED CONTRACTOR PROCEEDING AT OWN RISK | JERRYF | JERRYF | | HD | P | 5865014 | RK MECHANICAL, LLC | HWP | P | 05/17/2018 | PRESSURE TESTS OK ON NEW CWR AND CWS MAIN PIPING OK TO BURY - WILL NEED PLAN REVISED SHOWING THESE LINES UNDER FLOOR / WHERE SHOWS THEM OVERHEAD | JERRYF | JERRYF | | HWP | P | 5847568 | RK MECHANICAL, LLC | P= | C | 09/14/2018 | Corrections made, images received | SHANEN | SHANEN | | P= | C | 5965057 | RK MECHANICAL, LLC | P= | P | 08/17/2018 | Complete basement break room sink, add all fixtures and water heater to scope of work, P16 notes still apply | SHANEN | SHANEN | | P= | P | 5937387 | RK MECHANICAL, LLC | PTO | P | 06/05/2018 | DWV and waiter distribution test OK, set and secure closet flanges, P16 notes still apply to AAV all | SHANEN | SHANEN | | PTO | P | 5864323 | RK MECHANICAL, LLC | P16 | P | 06/01/2018 | Consult on domestic water and venting, need engineer drawings and approval for plan changes. | DANR | DANR | | P16 | P | 5861485 | RK MECHANICAL, LLC | PB | C | 05/17/2018 | Corrections made | SHANEN | SHANEN | | PB | C | 5847551 | RK MECHANICAL, LLC | PB | P | 05/14/2018 | Cannot wet vent between floors at bathroom groups, rest OK | SHANEN | SHANEN | | PB | P | 5843456 | ELDER CONSTRUCTION, INC. | XBS | T | 08/22/2018 | PAID (REC#1531946) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Additional foundation details | MICHAELA | MICHAELA | | XBS | T | 5941973 | RK MECHANICAL, LLC | XMS | T | 08/14/2018 | PAID (REC#1527262) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | XMS | T | 5933855 | ELDER CONSTRUCTION, INC. | XBS | T | 08/13/2018 | PAID (REC#1526658) PLAN SPLICE FEE: $50 by: DANM for Construction: Revisions to existing front and rear entry doors per Fire comments | DANM | DANM | | XBS | T | 5932311 | ELDER CONSTRUCTION, INC. | XBS | T | 06/22/2018 | PAID (REC#1509928) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised rated assembly for vertical lift | LBENNETT | LBENNETT | | XBS | T | 5883323 |
|
|