THE COPESTONE COMPANY | B= | C | 01/02/2019 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 6066368 |
THE COPESTONE COMPANY | B= | P | 12/19/2018 | pending external inspections / building okay. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection UBS by CSUREVIEW is not Completed yet (Contact: 668-3524), External Agency Inspection UWS by CSUREVIEW is not Completed yet (Contact: 668-3524). | BRIANB | BRIANB | | B= | P | 6058127 |
THE COPESTONE COMPANY | BIN | C | 12/19/2018 | observed batt insulation at exposed sections of exterior walls / corrections complete during inspection | BRIANB | BRIANB | | BIN | C | 6058119 |
THE COPESTONE COMPANY | BBB | C | 12/19/2018 | observation letter for bond beam received on 7DEC18 | BRIANB | BRIANB | | BBB | C | 6058027 |
THE COPESTONE COMPANY | BFR | C | 12/19/2018 | observation letter for structural steel, welding and bolting received received on 7DEC18 | BRIANB | BRIANB | | BFR | C | 6058021 |
THE COPESTONE COMPANY | BFI | C | 12/19/2018 | observation letter received 12/14/18 - see comments from BSP dated 12/14
| BRIANB | BRIANB | | BFI | C | 6058017 |
THE COPESTONE COMPANY | BFN | C | 12/19/2018 | foundation wall observation and open hole letter received on 12/7/18 | BRIANB | BRIANB | | BFN | C | 6058012 |
THE COPESTONE COMPANY | BFT | C | 12/19/2018 | footing observation letter received 12/19/18 - see comments from BSP dated 12/19 | BRIANB | BRIANB | | BFT | C | 6057954 |
THE COPESTONE COMPANY | BSP | P | 12/19/2018 | building footing observation on file | SCOTTS | SCOTTS | | BSP | P | 6057475 |
THE COPESTONE COMPANY | BSP | P | 12/14/2018 | 3rd party foundation insulation observation on file --- still need to provide building footing observation as only the trash enclosure footing observation is on file | SCOTTS | SCOTTS | | BSP | P | 6052786 |
THE COPESTONE COMPANY | BSP | P | 12/07/2018 | provide footing observation for building/ trash enclosure footing observation on file -- open ex on file -- foundation observation on file -- still need foundation insulation observation | SCOTTS | SCOTTS | | BSP | P | 6045781 |
THE COPESTONE COMPANY | BSP | P | 12/07/2018 | steel observation on file -- bond beam observations on file | SCOTTS | SCOTTS | | BSP | P | 6045703 |
THE COPESTONE COMPANY | B= | R | 12/05/2018 | inspection stopped - too many items / did courtesy walk with Copestone superintendent Pete / need all paper work to complete footing, foundation and foundation insulation inspections / need all engineering observation letters to complete bond beam and structural steel inspections / need to complete insulation inspection - unit 140 has drywall installed at the exterior wall prior to inspection / need complete re-inspection. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection UBS by CSUREVIEW is not Completed yet (Contact: 668-3524), External Agency Inspection UWS by CSUREVIEW is not Completed yet (Contact: 668-3524), INTERMOUNTAIN POWER SERVICES INC Electrical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | R | 6043986 |
THE COPESTONE COMPANY | BFR | P | 09/28/2018 | demising wall and restroom wall framing okay / reviewed accessible elements with Copestone rep Pete / also discussed missing paper work to complete foundation - bond beam inspections and observation letter for structural steel / pending other rough inspections / note - still need to complete BFI inspection | BRIANB | BRIANB | | BFR | P | 5979883 |
THE COPESTONE COMPANY | BFR | P | 08/15/2018 | PARTIAL / interior light gauge stl. framing okay only / pending other rough inspections and all paper work to complete foundation - bond beam and Entech observation letter for all structural steel / Training with PPRBD inspector Lonny - reviewed sticker on approved design - type of construction VB / proposed non-separated occupancy A-2 / B / M / sprinkled / also reviewed separated occupancies IBC 508.4 and construction for separated occupancy - fire barriers / discussed and reviewed inspection processes for core and shell | BRIANB | BRIANB | | BFR | P | 5935460 |
THE COPESTONE COMPANY | BSP | P | 08/15/2018 | core and shell training with inspector Brian B / type 5-B construction / proposed B/M OCCs / sprinkled for area / reviewed light gauge framing requirements - fire blocking requirements IBC 717.2 / reviewed OCCs separation requirements IBC 508.4 / reviewed 3rd party inspection process for foundations and structural steel / reviewed PPRBD plan review sticker / discussed progression of project as OCCs are established | LONNYS | LONNYS | | BSP | P | 5935452 |
THE COPESTONE COMPANY | BLA | C | 08/14/2018 | | BRIANB | BRIANB | | BLA | C | 5933450 |
THE COPESTONE COMPANY | BFR | P | 06/25/2018 | PARTIAL / CORNICE FRAMING OKAY ONLY | BRIANB | BRIANB | | BFR | P | 5884839 |
THE COPESTONE COMPANY | BBB | P | 06/21/2018 | COURTESY VISIT / AUTHORIZED INSPECTION BY ENGINEER / met with Larry from Copestone - observation letter for bond beam and all structural steel to follow | BRIANB | BRIANB | | BBB | P | 5881709 |
THE COPESTONE COMPANY | BFI | P | 04/26/2018 | 2" vertical foam okay / still need to inspect horizontal foam | BRIANB | BRIANB | | BFI | P | 5828765 |
THE COPESTONE COMPANY | BFN | P | 04/26/2018 | observation letter from Entech to follow | BRIANB | BRIANB | | BFN | P | 5828764 |
THE COPESTONE COMPANY | BFT | P | 04/26/2018 | observation letter from Entech to follow / open hole letter to follow | BRIANB | BRIANB | | BFT | P | 5828761 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 12/19/2018 | Electrical complete / | ROB | ROB | | E= | C | 6057151 |
INTERMOUNTAIN POWER SERVICES INC | E= | P | 12/17/2018 | Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | ROB | ROB | | E= | P | 6055382 |
INTERMOUNTAIN POWER SERVICES INC | E= | R | 12/05/2018 | AIC rating labels on panels and Main Disconnect do not match spliced prints--------All RTU's except ste 100 & 170 have the wrong OCP per nameplate rating / | ROB | ROB | | E= | R | 6043707 |
INTERMOUNTAIN POWER SERVICES INC | ES | P | 11/08/2018 | Commercial Service: Ok to set meters for Unit 100, 110, 140 A, 140 B, 160, and 170----All units 200 amp /----------Note: Will need label for all panels stating " REPLACE WITH SERIES RATED COMPONENTS ONLY"
| ROB | ROB | | ES | P | 6020168 |
INTERMOUNTAIN POWER SERVICES INC | E= | R | 11/07/2018 | Brass tags at gear need proper suite numbers on them---Disconnects at gear need label stating replace only with Type T Fuses / | ROB | ROB | | E= | R | 6018781 |
INTERMOUNTAIN POWER SERVICES INC | ES | R | 11/01/2018 | Commercial Service: Equipment provided does not match plans / | ROB | ROB | | ES | R | 6012962 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 10/23/2018 | Bathroom ceiling rough ok / | ROB | ROB | | ER | P | 6003454 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 10/01/2018 | Wall rough ok in bathrooms / | ROB | ROB | | ER | P | 5982018 |
INTERMOUNTAIN POWER SERVICES INC | E= | T | 09/25/2018 | PAID (REC#1542784): METER SET FOR HOUSE PANEL ONLY///---------------------Completed inspection changed to trip fee by Dean to allow for another ER and E= for the work completed under the splice dated 8/31 for new bathrooms--------------------------------- | GREGM | GREGM | | E= | T | 5975361 |
BJ COMPANY, LLC | E= | C | 09/18/2018 | FIRE ALARM INSPECTION: | ROB | ROB | | E= | C | 6027105 |
BJ COMPANY, LLC | ER | C | 09/18/2018 | FA complete for riser flow, tamper, horn/strobe / | ROB | ROB | | ER | C | 5968202 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 08/16/2018 | Mech room electrical rough in okay | CHIPO | CHIPO | | ER | P | 5936132 |
INTERMOUNTAIN POWER SERVICES INC | ES | P | 08/07/2018 | Commercial Service: 1600 amp 4/w 120/208 volt ---OK to set 7715 H (house ) meter ----- need to inspect building steel and water bond before final | CRAIGS | CRAIGS | | ES | P | 5925941 |
INTERMOUNTAIN POWER SERVICES INC | EUG | P | 06/20/2018 | bonding on 5 pole lights--ok 2-on north side 3 on west side--- | JOSEPH | JOSEPH | | EUG | P | 5879695 |
INTERMOUNTAIN POWER SERVICES INC | ESL | P | 06/18/2018 | 8 - 2" pvc and 1 - 1 1/2" pvc to sub panels in each units ok | CRAIG | CRAIG | | ESL | P | 5877165 |
INTERMOUNTAIN POWER SERVICES INC | EUG | P | 06/18/2018 | 1" pvc to site lighting on north, northwest and south side of building ok | CRAIG | CRAIG | | EUG | P | 5877164 |
INTERMOUNTAIN POWER SERVICES INC | EUG | P | 05/15/2018 | 1 1/4" pvc to north future monument sign; marked on plans | MATTHEW | MATTHEW | | EUG | P | 5845655 |
INTERMOUNTAIN POWER SERVICES INC | EUG | P | 05/14/2018 | data on W. of building not ready--- 1 1/4 pvc to 1st site light on W. of building ok--- 3- 1 1/4", 1- 1" ok on NW corner 10' out facing N. / | MIGUEL | MIGUEL | | EUG | P | 5844231 |
M W MECHANICAL INC | H= | C | 12/04/2018 | CORRECTION MADE ( SEE IMAGES) | LIDO | LIDO | | H= | C | 6041778 |
M W MECHANICAL INC | H= | P | 11/28/2018 | CLEARANCE TO THE BACK OF UNIT HEATER IS 16.5 " THE CLEARANCE REQUIRED PER INSTALLATION INSTRUCTIONS IS 18". OK TO ATTACH PICTURE INCLUDING THE MEASUREMENTS TO NEXT INSPECTION REQUEST . | LIDO | LIDO | | H= | P | 6036638 |
M W MECHANICAL INC | H= | P | 11/27/2018 | EWH-1 UNIT HEATER IS NOT INSTALLED PER MANUFACTURE INSTALLATION INSTRUCTIONS . UNIT HEATER CLEARANCE REQUIREMENTS ARE 7 FEET ABOVE THE FLOOR , 18 INCHES FROM THE BACK AND 18 INCHES FROM THE SIDE . THIS IS ALSO SHOWN ON THE BACK OF THE UNIT, SECURE STRUT HANGERS IN PLACE UP BY DECK. ROOF OK. | LIDO | LIDO | | H= | P | 6035795 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 10/26/2018 | OK TO RELEASE 8- METERS FOR 2 LB SYSTEM . | LIDO | LIDO | | HC | C | 6007423 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 10/26/2018 | 8- 10lb TESTS OK . | LIDO | LIDO | | H= | C | 6007414 |
M W MECHANICAL INC | H= | P | 10/19/2018 | PARTIAL PENDING FOR - NEED TO INSTALL EWH-1 PER INSTALLATION INSTRUCTIONS FOR SUPPORT . CONTRACTOR TO PROVIDE INSTALLATION INSTRUCTIONS INCLUDING TABLE 1 FOR CLEARANCES TO COMBUSTIBLES. NEED TO LABEL ALL ROOF TOP EQUIPMENT.BATHROOM EXHAUST DUCT ROUGH AND REGISTER FINAL CONNECTIONS OK . | LIDO | LIDO | | H= | P | 6001030 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 10/09/2018 | NOT READY FOR FINAL. | LIDO | LIDO | | H= | P | 5990452 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 10/09/2018 | ((NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT AND CALL FOR INSPECTION.))PLANS SHOW GAS TO BE INSTALLED INSIDE AND TO STUB UP THROUGH ROOF TO ROOF TOP UNITS , GAS WAS INSTALLED ON ROOF, HAVE PLANS REVISED AND APPROVED TO MATCH INSTALL, RTU-8 SHOWS 1" INSTALLED BEFORE PRESSURE REGULATOR , 3/4 " WAS INSTALLED , INSTALL PER PLAN OR HAVE PLANS REVISED AND APPROVED. 10 LB TEST FOR GAS PIPE LABELED 170 OK, 160 LOW TEST, 150 LOW TEST, 140 LOW TEST, 120 OK, 110 OK, 100 OK . (NOT ABLE TO RELEASE METER TILL ALL 10 LB TEST ARE OK .) | LIDO | LIDO | | HI | P | 5990451 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 11/21/2018 | Correction made | SHANEN | SHANEN | | P= | C | 6033057 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 11/16/2018 | unit # 140--need trap guards on both bathroom floor drains | TED | TED | | P= | P | 6028059 |
FRONTIER MECHANICAL SYSTEMS INC | P= | R | 11/15/2018 | cancel per e mail from contractor | TED | TED | | P= | R | 6026181 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 11/07/2018 | core and shell | TED | TED | | P= | C | 6018544 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 11/07/2018 | roof drains | TED | TED | | PRD | C | 6018540 |
LANDMARK PLUMBING AND HEATING, INC. | P= | R | 11/05/2018 | cancel per call ahead | TED | TED | | P= | R | 6016175 |
LANDMARK PLUMBING AND HEATING, INC. | P= | R | 11/02/2018 | need roof drain test and inspection, need water meter room floor drain uncovered and trap guard installed | TED | TED | | P= | R | 6014533 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 09/28/2018 | Unit 140 DWV and water distribution test OK, by final add drinking fountain to scope of work | SHANEN | SHANEN | | PTO | P | 5980784 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 09/10/2018 | 2 bathrooms in liqueur store area, test and design ok, note: need drinking fountain added to scope of work | TED | TED | | PB | C | 5959659 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 08/30/2018 | vents for water entry room. | TED | TED | | PTO | P | 5951335 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 06/20/2018 | fire riser and water meter room floor drain | TED | TED | | PB | P | 5880075 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 06/14/2018 | grease line complete from inside to outside tank, vents from tank to inside building ok, | TED | TED | | PB | P | 5874828 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 06/13/2018 | field cancel | TED | TED | | PB | P | 5873183 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 06/08/2018 | ok for grease waste only, test ok | JOHNS | JOHNS | | PB | P | 5869282 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 05/31/2018 | Sanitary underground ok. Note: still need grease / storm underground. | DANR | DANR | | PB | P | 5860996 |
BJ COMPANY, LLC | XES | T | 12/07/2018 | PAID (REC#1561901) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line diagram to address inspector's comments concerning AIC rating. Revised "keyplan" to indicate location of Panel H. | BERTHA | BERTHA | | XES | T | 6045883 |
BJ COMPANY, LLC | XES | T | 12/04/2018 | PAID (REC#1560948) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise series rating and one line | SHELBY | SHELBY | | XES | T | 6042232 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 10/25/2018 | PAID (REC#1550844) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas pipe to roof | JUSTINC | JUSTINC | | XMS | T | 6005796 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 08/30/2018 | PAID (REC#1534442) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: relocate gas lines | DALEH | DALEH | | XMS | T | 5951406 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 08/30/2018 | PAID (REC#1534442) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 8-30 -18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5951367 |
INTERMOUNTAIN POWER SERVICES INC | XES | P | 08/30/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Removed Panel C from scope. | BERTHA | BERTHA | | XES | P | 5950614 |
THE COPESTONE COMPANY | XBS | T | 08/30/2018 | PAID (REC#1534443) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add toilet rooms and demising wall | MICHAELA | MICHAELA | | XBS | T | 5950589 |
THE COPESTONE COMPANY | XBS | T | 06/12/2018 | PAID (REC#1510099) PLAN SPLICE FEE: $50 by: DANM for Construction: Change type of construction to V-B from II-B and change proposed occupancy to A-2,B, M | DANM | DANM | | XBS | T | 5871341 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 06/01/2018 | PAID (REC#1504681) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 6-1-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5861920 |
THE COPESTONE COMPANY | XBS | P | 05/30/2018 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Revised sprinkler room location; windows and parapet details | SHELLEY | SHELLEY | | XBS | P | 5859517 |
INTERMOUNTAIN POWER SERVICES INC | XES | T | 05/30/2018 | PAID (REC#1504683) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line | SHELBY | SHELBY | | XES | T | 5859470 |