SHARP GENERAL CONTRACTORS, INC | B= | C | 02/08/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6101976 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 02/07/2019 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | NICK | NICK | | B= | P | 6100593 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 12/03/2018 | frame at phase 4 office 625, 618,619 okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 6041160 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 11/02/2018 | Framing for Phase 3 (Rooms 635, 637 & 638 per Sheet A1.5) OK pending other Roughs | RICHB | RICHB | | BFR | P | 6014983 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 10/24/2018 | With completed required inspections phase 1 and 2 per sheet A1.05 okay. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, MARQUARDT ELECTRIC, INC Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6004528 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 10/24/2018 | wall framing of room 623 with completed required inspections okay. | NATHAN | NATHAN | | BFR | P | 6004508 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 09/18/2018 | last walls in phase 3 frame okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5968499 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 06/25/2018 | Phase 2 corridors 604. 617 and spaces 614,609,608,613,610,612,602,603,640 and 641 okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5884212 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 04/30/2018 | phase 1 corridor 629, rooms 630-634 okay with completed required inspections | NATHAN | NATHAN | | BFR | P | 5830768 |
MARQUARDT ELECTRIC, INC | E= | C | 01/31/2019 | Phase 4 complete | GARYL | GARYL | | E= | C | 6093314 |
MARQUARDT ELECTRIC, INC | ER | C | 01/29/2019 | all ceilings ok | BRIAN | BRIAN | | ER | C | 6090788 |
WESTERN STATES FIRE PROTECTION COMPANY | E= | C | 01/17/2019 | | BRIAN | BRIAN | | E= | C | 6080945 |
MARQUARDT ELECTRIC, INC | ER | R | 12/11/2018 | walls phase 4--ok | BRIAN | BRIAN | | ER | R | 6049209 |
MARQUARDT ELECTRIC, INC | E= | P | 12/04/2018 | phase 3---ok ---see plans | BRIAN | BRIAN | | E= | P | 6041999 |
MARQUARDT ELECTRIC, INC | ER | P | 12/04/2018 | ceilings in phase 3--ok ----need fire alarm insp----- | BRIAN | BRIAN | | ER | P | 6041995 |
MARQUARDT ELECTRIC, INC | ER | P | 11/02/2018 | walls in phase 3--ok | BRIAN | BRIAN | | ER | P | 6014148 |
MARQUARDT ELECTRIC, INC | E= | P | 10/24/2018 | phase 1 &2 ---ok | BRIAN | BRIAN | | E= | P | 6004279 |
MARQUARDT ELECTRIC, INC | ER | P | 10/11/2018 | rest of ceilings in phase 2---ok except need to see power pole connections | BRIAN | BRIAN | | ER | P | 5991854 |
WESTERN STATES FIRE PROTECTION COMPANY | ER | P | 09/25/2018 | FIRE ALARM INSPECTION: PARTIAL PHASE 2 CEILING --NEED PIC OF GRID WIRES OR VERIFY ON NEXT INSP---- | BRIAN | BRIAN | | ER | P | 6080915 |
MARQUARDT ELECTRIC, INC | ER | P | 09/25/2018 | PHASE 2 --PARTIAL CEILINGS ONLY------ | BRIAN | BRIAN | | ER | P | 5975449 |
MARQUARDT ELECTRIC, INC | ER | P | 06/22/2018 | walls only in phase 2 complete | GARYL | GARYL | | ER | P | 5883091 |
MARQUARDT ELECTRIC, INC | ER | P | 05/25/2018 | ceilings only | GARYL | GARYL | | ER | P | 5856355 |
MARQUARDT ELECTRIC, INC | ER | P | 04/30/2018 | walls only, marked/dated | GARYL | GARYL | | ER | P | 5831166 |
AIRTECH MECHANICAL, INC. | H= | C | 01/31/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6093106 |
AIRTECH MECHANICAL, INC. | H= | P | 01/11/2019 | PARTIAL PENDING TAB REPORT - ALL SA / RA GRILLES AND CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6076316 |
AIRTECH MECHANICAL, INC. | HD | P | 09/26/2018 | THIS INSPECTION WAS FOR PHASE 1 CONDENSATE DRAIN HAS BEEN PROTECTED - PHASE 2 ABOVE CEILING SA RUN OUTS AND SA / RA GRILLES ARE COMPLETE | JERRYF | JERRYF | | HD | P | 5977552 |
AIRTECH MECHANICAL, INC. | HD | L | 09/25/2018 | CANCELED BY CONTRACTOR AT CALL AHEAD | JERRYF | JERRYF | | HD | L | 5975520 |
AIRTECH MECHANICAL, INC. | HD | P | 05/23/2018 | PHASE 1 - ABOVE CEILING SA MAINS AND RUN OUTS IN EQUIPMENT ROOM 630 OK ONLY - BY FINAL PROTECT CONDENSATE PUMP IN PLENUM | JERRYF | JERRYF | | HD | P | 5853496 |