COLORADO STRUCTURES INC | B= | C | 08/19/2019 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6306348 |
COLORADO STRUCTURES INC | BFT | C | 08/07/2019 | eng letter for footing, steel and eufer on file | BOBF | BOBF | | BFT | C | 6291095 |
COLORADO STRUCTURES INC | BFI | C | 08/07/2019 | R10 installed / | BOBF | BOBF | | BFI | C | 6291090 |
COLORADO STRUCTURES INC | BSP | P | 07/25/2019 | reviewed exit sign requirements at pool enclosure | BOBF | BOBF | | BSP | P | 6277063 |
COLORADO STRUCTURES INC | B= | P | 07/22/2019 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), BOCHNAK MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet, STEELE BROS. HEATING, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6272057 |
COLORADO STRUCTURES INC | B= | P | 07/22/2019 | need to revise and splice plans for wall extended to even with restroom front wall, need to install grab bars and sign at rest room, need to complete other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), BOCHNAK MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet, STEELE BROS. HEATING, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6271971 |
COLORADO STRUCTURES INC | BFR | P | 06/14/2019 | pending other required inspections - inspected bathroom area only / walls and trusses okay | BOBF | BOBF | | BFR | P | 6231915 |
COLORADO STRUCTURES INC | BFN | C | 06/10/2019 | open hole on file -- 2600 PSF -- usable -- 10% / footing and foundation observation on file - ufer noted / foundation design on file (bearing capacity verified) / | BOBF | BOBF | | BFN | C | 6225176 |
COLORADO STRUCTURES INC | BSP | P | 04/16/2019 | drywall install at maintenance shear wall okay | BOBF | BOBF | | BSP | P | 6167638 |
COLORADO STRUCTURES INC | BIN | P | 04/10/2019 | r 38 in ceiling of maintenance area okay | BOBF | BOBF | | BIN | P | 6161653 |
COLORADO STRUCTURES INC | BSP | P | 03/05/2019 | BSP inspection - 6 bay garage/maint. area / Fire blocking of penetrations in maintenance area completed. | CHUCK | CHUCK | | BSP | P | 6124831 |
COLORADO STRUCTURES INC | BFR | P | 02/26/2019 | BFR inspection - maint. garage / MEPs complete. Need to fire block penetrations. | CHUCK | CHUCK | | BFR | P | 6118329 |
COLORADO STRUCTURES INC | BFR | P | 01/31/2019 | BFR inspection conducted on 1.30.19 (unable to add inspection at time of inspection) - 6 bay garage with maint. area - / Holddowns and sill plate anchors OK per Sht. S-02 of the approved plans. / Need to complete MEP rough inspections. | CHUCK | CHUCK | | BFR | P | 6093068 |
COLORADO STRUCTURES INC | BFR | P | 01/07/2019 | BFR inspection - 6 bay detached garage with maintenance area / Verified shear wall S04 installation per Schedule on amended Sht. S-02 and framing OK per Sht. WT-2 and A-54 for type P11/12/14/15 walls and trusses. Need to verify hold downs and sill plate anchoring. / Need to complete plumbing, mechanical and electrical rough inspections. | CHUCK | CHUCK | | BFR | P | 6070696 |
COLORADO STRUCTURES INC | BSP | P | 01/07/2019 | BSP / Engineer's clarification to substitute S04 shear walls (Shear Wall Schedule on Sht. S-02) for S02 garage shear walls listed on Sht. A-54/A-54a. / Need to verify shear walls on site. | CHUCK | CHUCK | | BSP | P | 6069721 |
COLORADO STRUCTURES INC | BFR | R | 01/03/2019 | BFR / Not ready. Cancelled by phone by Jeremy (CSI). | CHUCK | CHUCK | | BFR | R | 6067699 |
COLORADO STRUCTURES INC | BSP | T | 12/19/2018 | PAID (REC#1565414) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Complete re-review of plans | SHELLEY | SHELLEY | | BSP | T | 6058226 |
COLORADO STRUCTURES INC | BSP | P | 07/05/2018 | Met Superintendent (Garry) - discussed project status, rated assemblies (including details for all penetrations) and inspection sequencing | RICHB | RICHB | | BSP | P | 5893651 |
COLORADO STRUCTURES INC | BFN | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFN | P | 5825788 |
COLORADO STRUCTURES INC | BFT | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFT | P | 5825787 |
MAGNUM ELECTRIC, INC | E= | C | 07/24/2019 | | TIMA | TIMA | | E= | C | 6274371 |
COLORADO SECURITY, LLC | E= | C | 05/23/2019 | FIRE ALARM INSPECTION: | TIMA | TIMA | | E= | C | 6209118 |
COLORADO SECURITY, LLC | ER | C | 05/23/2019 | FIRE ALARM INSPECTION: | TIMA | TIMA | | ER | C | 6209116 |
COLORADO SECURITY, LLC | E= | C | 05/23/2019 | FIRE ALARM INSPECTION: | TIMA | TIMA | | E= | C | 6209117 |
MAGNUM ELECTRIC, INC | E= | P | 05/22/2019 | need plan revision complete---rest ok | TIMA | TIMA | | E= | P | 6207548 |
MAGNUM ELECTRIC, INC | E= | P | 05/14/2019 | north recept no power / need fire alarm panel installed / need panel scedule / NEED PLAN REVISION ON FEEDER FROM 1/0 CU TO 4/0 AL--- | TIMA | TIMA | | E= | P | 6199021 |
MAGNUM ELECTRIC, INC | ES | C | 05/09/2019 | Commercial Service: 150-amp 3 Wire New Commercial ok to set meter. / Maintenance Building | CRAIG | CRAIG | | ES | C | 6193780 |
MAGNUM ELECTRIC, INC | EUG | P | 03/19/2019 | service lateral complete to building | TIMA | TIMA | | EUG | P | 6137125 |
MAGNUM ELECTRIC, INC | EUG | P | 03/07/2019 | service lateral ok to 10' past curb | TIMA | TIMA | | EUG | P | 6126994 |
MAGNUM ELECTRIC, INC | ER | C | 02/22/2019 | need 3/0 ser cable for panel feeder--- UFER IR----WILL NEED PLANS REVISED TO SHOW CHANGE FROM 1/0 CU TO 3/0 AL---- | TIMA | TIMA | | ER | C | 6114461 |
STEELE BROS. HEATING, INC | H= | C | 07/29/2019 | | MARKB | MARKB | | H= | C | 6279704 |
STEELE BROS. HEATING, INC | H= | P | 07/26/2019 | Can final once requested by contractor | MARKB | MARKB | | H= | P | 6279109 |
BOCHNAK MECHANICAL, INC. | H= | C | 07/26/2019 | Note: High/Low transfer grills to meet combustion air requirements OK per engineer. | MARKB | MARKB | | H= | C | 6277838 |
BOCHNAK MECHANICAL, INC. | H= | P | 07/25/2019 | FINAL PENDING - Plan splice for combustion air & vent | MARKB | MARKB | | H= | P | 6276753 |
BOCHNAK MECHANICAL, INC. | H= | P | 06/21/2019 | FINAL PENDING - Splice for indirect vent water heaters through roof and high/low transfer grills using inside combustion air. | MARKB | MARKB | | H= | P | 6239801 |
STEELE BROS. HEATING, INC | HV | P | 05/13/2019 | ----SEE "HD" NOTES---- UNIT HEATER VENT/COMBUSTION AIR PER INSTALL INSTRUCTIONS. WATER HEATER VENT NOT COMPLETE. | MARKB | MARKB | | HV | P | 6196810 |
STEELE BROS. HEATING, INC | HD | P | 05/13/2019 | NOTE ADDED 5/15/19: SEE IMAGES FOR ENGINEER SPEC EQUIPMENT. ----NEED ENGINEER TO ADDRESS FURNACE BRAND/MODEL OF EQUIPMENT FOR GF-02. PLANS CALL FOR 2" PVC VENT HAS UNIT HEATER WITH METAL CONCENTRIC VENT---- ROUGH DUCT FOR EXHAUST AND DRYER DUCTS OK. | MARKB | MARKB | | HD | P | 6196807 |
BOCHNAK MECHANICAL, INC. | HC | C | 01/25/2019 | RELEASE METER | MARKB | MARKB | | HC | C | 6088081 |
BOCHNAK MECHANICAL, INC. | HI | C | 01/25/2019 | Training with Paul O. 10# test ok. note: gas line installed per plans. (NO APPLIANCES ON SITE AT THIS TIME). | MARKB | MARKB | | HI | C | 6088079 |
BOCHNAK MECHANICAL, INC. | P= | C | 07/25/2019 | Corrections made. | DANR | DANR | | P= | C | 6277418 |
BOCHNAK MECHANICAL, INC. | P= | P | 06/25/2019 | Tempering at lavatory, missing expansion tank at water heater, fix scope of work Per PTO note, rest ok. | DANR | DANR | | P= | P | 6243992 |
BOCHNAK MECHANICAL, INC. | PTO | C | 02/11/2019 | Corrections made. Note: by final add to scope of work 1 back flow - 1 floor drain - 1 washer. Check water heater and water entry at final. | DANR | DANR | | PTO | C | 6104089 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/30/2019 | Nail protection, anchor toilet flange, fix scope of work, rest ok. Note: Check water heater and water entry at final. | DANR | DANR | | PTO | P | 6092880 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/08/2019 | This inspection DWV only: Low dwv test, secure toilet flange, add back flow - floor drain - washer box to scope of work. | DANR | DANR | | PTO | P | 6072323 |
BOCHNAK MECHANICAL, INC. | PB | C | 11/07/2018 | WILL NEED TO REVISE PLANS TO SHOW DELETION OF SAND / OIL INTERCEPTOR, PLEASE ADD WASHER BOX, FLOOR DRAIN, BACKFLOW PREVENTOR AND ANY OTHER PLBG RELATED ITEMS TO SCOPE OF WORK, rest ok for test / design. PLAN PAGE P-16. NOTE: water stubbed into water entry
| JOHNS | JOHNS | | PB | C | 6018898 |
COLORADO STRUCTURES INC | XBS | T | 07/24/2019 | PAID (REC#1616624): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise wall configuration | MICHAELA | MICHAELA | | XBS | T | 6274429 |
MAGNUM ELECTRIC, INC | XES | T | 06/06/2019 | PAID (REC#1604455): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line per inspector's comments. | BERTHA | BERTHA | | XES | T | 6222749 |
BOCHNAK MECHANICAL, INC. | XMS | T | 04/16/2019 | PAID (REC#1590884): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Water heater venting revisions | JUSTINC | JUSTINC | | XMS | T | 6166721 |
COLORADO STRUCTURES INC | XBS | T | 03/06/2019 | PAID (REC#1580884): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise wall types | MICHAELA | MICHAELA | | XBS | T | 6126021 |
COLORADO STRUCTURES INC | XBS | T | 01/22/2019 | PAID (REC#1572951): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 6084821 |
BOCHNAK MECHANICAL, INC. | XPS | T | 11/16/2018 | PAID (REC#1559257): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-16-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6028570 |
COLORADO STRUCTURES INC | XES | T | 11/12/2018 | PAID (REC#1559259): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised entire plan | SHELBY | SHELBY | | XES | T | 6022542 |
BOCHNAK MECHANICAL, INC. | XMS | P | 11/08/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED TO REMOVE EXHAUST FANS | JUSTINC | JUSTINC | | XMS | P | 6020586 |
COLORADO STRUCTURES INC | XBS | T | 08/01/2018 | PAID (REC#1523555): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 5920249 |