MARTINES PALMEIRO CONSTRUCTION | B= | C | 12/27/2019 | | TIMOTHYS | TIMOTHYS | | B= | C | 6437982 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 12/11/2019 | Provide covers on cleanouts in dog washing room - Install dog washing station shown in plans so counter heights can be inspected -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 6423748 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 07/11/2019 | no RC to inspect as there are no rated ceiling assemblies in this building / hard lid drops were inspected prior to insulation installation | DANE | DANE | | BSP | P | 6260675 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 07/08/2019 | Insulation OK - walls and ceiling cavities. | CHUCK | CHUCK | | BSP | P | 6255291 |
MARTINES PALMEIRO CONSTRUCTION | BIN | C | 07/05/2019 | thermal insulation OK / all door openings have been covered to dry in | DANE | DANE | | BIN | C | 6254038 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 06/28/2019 | not dryed in yet / received letter for glue lam beams / remaing framing items completed / training with tony | CHUCK | CHUCK | | BFR | P | 6247788 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 05/29/2019 | Gluelam beams supporting roof not continuous per plan - cut/gap in middle span / 2x10 rafters to be 16" o.c. per plan - installed at 24" o.c. / No stud details (size/spacing) found in plan. / Not dried in yet / Missing rafter header and joist hangers at skylights. | CHUCK | CHUCK | | BFR | R | 6212946 |
MARTINES PALMEIRO CONSTRUCTION | BFT | P | 04/25/2019 | Reinforcing steel observation on file // Open excavation letter specifically states they did not do open hole. Will need resolution prior to completion | JEREMYA | JEREMYA | | BFT | P | 6177472 |
MARTINES PALMEIRO CONSTRUCTION | BE | L | 02/05/2019 | Renewed at 2/5/2019 2:41:52 PM | MATTHEWM | MATTHEWM | | BE | L | 6098433 |
DIE HARD, INC | E= | C | 11/20/2019 | | BRET | BRET | | E= | C | 6405983 |
DIE HARD, INC | E= | C | 11/20/2019 | | BRET | BRET | | E= | C | 6405906 |
DIE HARD, INC | E= | P | 11/19/2019 | relocate ufer conductor and ground rod conductor to main disconnect | BRET | BRET | | E= | P | 6403735 |
DIE HARD, INC | E= | P | 11/18/2019 | still need gfci in dog wash | RANDY | RANDY | | E= | P | 6402435 |
DIE HARD, INC | E= | P | 11/08/2019 | check panel and gfci in dog wash next inspection | RANDY | RANDY | | E= | P | 6392833 |
DIE HARD, INC | ES | P | 10/01/2019 | Commercial Service: 200 amp service ok to energize made to maiin disconnect | BRET | BRET | | ES | P | 6353327 |
DIE HARD, INC | ER | P | 05/22/2019 | walls and lid except panel wall. | BRET | BRET | | ER | P | 6207229 |
LDI MECHANICAL, INC. | H= | C | 11/21/2019 | MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6407021 |
LDI MECHANICAL, INC. | H= | P | 11/20/2019 | CONTRACTOR WANTED MAIL KIOSK AND PARCEL BUILDING INSPECTED ALONG WITH AMENITIES BUILDING, MAIL KIOSK AND PARCEL BUILDING ARE ON SEPARATE PERMITS AND NEED TO HAVE INSPECTIONS CALLED FOR EACH BUILDING. AMENITY BUILDING: MECHANICAL FINAL PENDING SECURE CONDENSING UNIT FOR MINI SPLITS. | DUSTINS | DUSTINS | | H= | P | 6405590 |
LDI MECHANICAL, INC. | HD | C | 05/28/2019 | 4- LINE SETS ABOVE CEILING AND IN WALL OK AND EXHAUST FAN AND DUCT ABOVE CEILING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HD | C | 6212074 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 12/03/2019 | | TAYLOR | TAYLOR | | P= | C | 6414116 |
HORIZON LLC OF SOUTH CAROLINA | P= | L | 11/20/2019 | field cancelled. | TAYLOR | TAYLOR | | P= | L | 6405359 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 10/25/2019 | no hot water, re- inspect all. | TAYLOR | TAYLOR | | P= | P | 6380364 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 03/26/2019 | ok for looped underground main water line | JOHNS | JOHNS | | PB | C | 6144187 |
HORIZON LLC OF SOUTH CAROLINA | PTO | C | 03/20/2019 | **STILL NEED LOOPED UNDER GROUND WATERS rest ok for corrections made | JOHNS | JOHNS | | PTO | C | 6138090 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 03/12/2019 | ok for test and design, MINUS need to wrap incoming water service, need to see water transition fitting @ tie in, need looped under ground waters, rest ok. NOTE: vtr (1), check water htr @ final, unit shut off @ bath w/ access panel @ incoming opposite wall | JOHNS | JOHNS | | PTO | P | 6131139 |
HORIZON LLC OF SOUTH CAROLINA | PE | L | 02/04/2019 | Renewed online for 1/2 Fee at 2/4/2019 8:27:23 AM (RECEIPT #: 1573815) | WEBSITE | WEBSITE | | PE | L | 6096232 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/16/2018 | need to install underground H2O lines. | TAYLOR | TAYLOR | | PB | P | 5903179 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 06/24/2019 | PAID (REC#1609325): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revision 10 only - stud sizing on details. | SHELLEY | SHELLEY | | XBS | T | 6241872 |