LEC PROPERTIES, INC. | B= | C | 09/17/2020 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 6710224 |
LEC PROPERTIES, INC. | B= | P | 09/16/2020 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JEREMYA | JEREMYA | | B= | P | 6707677 |
LEC PROPERTIES, INC. | BIN | P | 08/21/2020 | Insulation OK pending installation of OHD's. Temp doors installed currently | JEREMYA | JEREMYA | | BIN | P | 6681014 |
LEC PROPERTIES, INC. | BIN | R | 08/20/2020 | Insulation not even started / Do need to BFT and BFN paperwork | JEREMYA | JEREMYA | | BIN | R | 6679468 |
LEC PROPERTIES, INC. | BFR | P | 08/19/2020 | Framing OK / Missing roof jack / Missing OHD's / Still need all third party footing and foundation observations | JEREMYA | JEREMYA | | BFR | P | 6678323 |
LEC PROPERTIES, INC. | B= | P | 08/04/2020 | Met onsite with Tim Downs to discuss the process for how to move forward. His truss engineering will need to be re-submitted as a splice. All third party inspections are to be submitted via image upload with inspection requests. This will need to be done for each building on the property. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ELLIOTT ELECTRICAL, INC. Electrical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6660830 |
LEC PROPERTIES, INC. | BFR | R | 11/05/2019 | trusses not spliced/no frame inspection conducted -- attach mechanical permit/complete roughs -- reviewed accessibility -- provide 3rd party paperwork for foundation and hold down observations | SCOTTS | SCOTTS | | BFR | R | 6389442 |
LEC PROPERTIES, INC. | BE | L | 02/21/2019 | Renewed at 2/21/2019 3:12:35 PM | JANE | JANE | | BE | L | 6113663 |
ELLIOTT ELECTRICAL, INC. | E= | C | 08/31/2020 | | RANDY | RANDY | | E= | C | 6690566 |
ELLIOTT ELECTRICAL, INC. | E= | R | 08/27/2020 | need heater installed and wired | RANDY | RANDY | | E= | R | 6688390 |
ELLIOTT ELECTRICAL, INC. | E= | P | 03/04/2020 | | RANDY | RANDY | | E= | P | 6500384 |
ELLIOTT ELECTRICAL, INC. | ER | P | 06/07/2019 | | RANDY | RANDY | | ER | P | 6224147 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | C | 08/27/2020 | MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6687697 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 12/05/2019 | SUPPORT BATH EXHAUST DUCT. SEAL AROUND TWHP-A AT EXTERIOR. | DUSTINS | DUSTINS | | H= | P | 6417848 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 09/16/2020 | corrections made | JOSEPHD | JOSEPHD | | P= | C | 6707529 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 09/16/2020 | | JOSEPHD | JOSEPHD | | PB | C | 6707527 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 09/15/2020 | lav to high off ground, toilet flush handle needs to be to open side, need to run water heater t&p, need to support hot pex to water heater, plan splice approved but not uploaded into system yet, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6705890 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | L | 09/10/2020 | call ahead completed at 10:50 no one one site at 11:36, tried to call contractor but voice mail is full, no water turned on re-inspect all, need plan splice for water meter and backflow, | JOSEPHD | JOSEPHD | | P= | L | 6701494 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | L | 12/04/2019 | COMMENT ON INSPECTION REQUEST WAS FOR MECHANICAL HEAT FINAL. THIS CONTRACTOR DOES NOT HAVE A MECHANICAL ATTACHMENT FOR THIS PERMIT. NEED MECHANICAL ATTACHMENT BEFORE ANY MECHANICAL INSPECTIONS CAN BE DONE. | DUSTINS | DUSTINS | | P= | L | 6415741 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 05/03/2019 | check water heater and meter by final, need engineers letter for cellular core piping, note: need electrical and mechanical permits attached. | TAYLOR | TAYLOR | | PTO | C | 6186619 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 05/02/2019 | need 3 inch VTR, restroom does not meet accessibility requirements. | TAYLOR | TAYLOR | | PTO | P | 6185296 |
KIMBEL MECHANICAL SYSTEMS, INC. | PE | L | 01/28/2019 | Renewed online for 1/2 Fee at 1/28/2019 3:29:35 PM (RECEIPT #: 1572409) | WEBSITE | WEBSITE | | PE | L | 6090382 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 05/10/2018 | dwv ok, need material list to verify pex under floor is ok, is there going to be a water meter in area? | JOSEPHD | JOSEPHD | | PB | P | 5840833 |
KIMBEL MECHANICAL SYSTEMS, INC. | XPS | T | 09/11/2020 | PAID (REC#1712826): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 9 revisions: One sheet provided with this splice - P-3 adjusted plumbing maintenance plan. | SHANEN | SHANEN | | XPS | T | 6703675 |
LEC PROPERTIES, INC. | XBS | T | 08/17/2020 | PAID (REC#1705194): PLAN SPLICE FEE: $50 by: DANM for Construction: Deferred trusses | DANM | DANM | | XBS | T | 6675408 |
LEC PROPERTIES, INC. | XBS | P | 12/05/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revise door width to two doors | DANM | DANM | | XBS | P | 6417702 |